Queens · Block 7128 · Lot 10 · 11365

195-61 Peck Avenue

2 floors · 115,000 sq ft · built 1955 · class W1 · owner of record: Nyc Department Of Education

15open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
46dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 46 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-17 (Accepted). Agency page

Dec 31, 2026
in 46 days
2 of 2 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 115,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 167 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 167 days
Annual filing
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 7128). Agency page

Dec 31, 2028
in 777 days
Next due 2028

Open violations

ECB / OATH (12)
IssuedViolationHearingBalance
Apr 30, 2026Construction CLASS - 2
REISSUED ECB:35719682L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED GLASS WINDOW PANELS BROKEN AT EXIT 5,11 AND 1ST FLOOR STAGE.REM:REPAIR AND/OR REPLACE.
#35732411X
May 28, 2026
POP/IN-VIO
$0
Apr 30, 2026Construction CLASS - 2
REISSUED ECB#35719681J FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PERBC 1006.1;27-381.NOTED AT 1ST FLOOR EMERGENCY LIGHTS NOT WORKING BOX#4
#35732412H
May 28, 2026
POP/IN-VIO
$0
Apr 30, 2026Construction CLASS - 2
REISSUED ECB#35719680H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED SMOKE DOORS NOT FUNCTIONING PROPERTY AT STAGE DOOR,KITCHEN ENTRANCE AND BY EXIT#5.REM:REPAIR AND/OR REPLACE.
#35732413J
May 28, 2026
POP/IN-VIO
$0
Apr 30, 2026Construction CLASS - 2
REISSUED ECB#35719679K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT EXIT 79-10 OUTSIDE CONCRETE LANDING AT THE TOP OF STEPS IN DISREPAIR WITH CRACKS AND MISSING;BULKHEADS AT STAIRS A AND B SPA
#35732414L
May 28, 2026
POP/IN-VIO
$0
May 8, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT GLASS WINDOW ABOVE DOORS BROKEN EXIT 5,11,AND 1ST FLOOR STAGE LEFT DOOR BROKEN GLASS.REM:REPAIR AND/OR REPLACE GLASS.
#35719682L
Jul 15, 2025
POP/IN-VIO
$0
May 8, 2025Construction CLASS - 2
REISSUE#35682713Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT EXIT 9 AND 10 STOOP IN DISREPAIR WITH CRACKS AND MISSING CONCRETE,BULKHEADS AT STAIR A AND B SPALLING,CRACKS AND MISSING MORTAR.R
#35719679K
Jul 15, 2025
POP/IN-VIO
$0
May 8, 2025Construction CLASS - 2
REISSUE#35682712R FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXIT,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED AT 1ST FLOOR BOX#41,40,36,AUDITORIUM,8A,36,60,GYM.RE
#35719681J
Jul 15, 2025
POP/IN-VIO
$0
May 8, 2025Construction CLASS - 2
REISSUE#35682711P FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT 1ST FLOOR DOOR STAGE LEFT AND KITCHEN ENTRANCE BY EXIT 5 DOORS ARE NOT FUNCTIONING PROPERLY.REM:REPAIR AND/OR REPLACE.
#35719680H
Jul 15, 2025
POP/IN-VIO
$0
May 21, 2024Construction CLASS - 2
REISSUE#35674925K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT:ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT 1 FLOOR AUDITORIUM,GYM BOX#46,47,61,1 FL BX#19,24 AND 234 EME
#35682712R
Jul 30, 2024
POP/IN-VIO
$0
May 21, 2024Construction CLASS - 2
REISSUE#35674926M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT EXIT 9 & 10 STOP IN DISREPAIR WITH CRACKS & MISSING CONCRETE AND BULKHEADS AT STAIR A,BAND D SPALLING,CRACKS & MISSING MORTAR.REM:REPAI
#35682713Z
Jul 30, 2024
POP/IN-VIO
$0
Apr 14, 2023Construction CLASS - 2
FAIL TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.OBSERVED STOP OUTSIDE OF EXIT 10 & 9 HAS CRACKS AND MISSING CONCRETE PIECES.REM:REPAIR AND/OR REPLACE.
#35674926M
Aug 1, 2023
POP/IN-VIO
$0
Apr 14, 2023Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOREXITS,EXIT DISCHARGES AND CORRIDORS PER BC 1006.1;27-381.OBSERVED EMERGENCY LIGHTS IN THE GYM & AUDITORIUM NOT WORKING WHEN TESTED.REM:REPAI
#35674925K
Aug 1, 2023
POP/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (3)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 2:58 PM ET. BBL 4071280010.

Look up another building