1 floors · 10,300 sq ft · built 1920 · class G2 · owner of record: 1932 Jerome Ave Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1161 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 1, 2026 | Construction CLASS - 1 ATOI, OBSERVE WWOP FOR THE ONGOING PLUMBING WORK IN THE BASEMENT AND FIRST FLOOR, WORK APPEARS TO BE 30% DONE FOR THE FIRST FLOOR BATHROOM AND THE PLUMBING WORK IN THE BASEMENT APPEARS TO BE DEMO PIPES WITH NEW #39202611H | Nov 6, 2026 PENDING | $2,500 |
| Sep 1, 2026 | Construction CLASS - 2 ATOI, OBSERVE WWOP FOR THE ALTERATION WORK BEING DONE ON THE FIRST FLOOR, WORK APPEARS TO BE 30% DONE. STRUCTURE APPEARS TO BE INSTALLED WITH 2X4 WOOD AND PLYWOOD FOR THE BATHROOM BEING INSTALLED, OBTAIN ALL PE #39202613L | Nov 6, 2026 PENDING | $1,250 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 7, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 7, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 1, 2026 | ECB | Construction: ATOI, OBSERVE WWOP FOR THE ONGOING PLUMBING WORK IN THE BASEMENT AND FIRST FLOOR, WORK APPEARS TO BE 30% DONE FOR THE FIRST FLOOR BATHROOM AND THE PLUMBING WORK IN THE BASEMENT APPEARS TO BE DEMO PIPES WITH NEW | Open |
| Sep 1, 2026 | ECB | Construction: ATOI, OBSERVE WWOP FOR THE ALTERATION WORK BEING DONE ON THE FIRST FLOOR, WORK APPEARS TO BE 30% DONE. STRUCTURE APPEARS TO BE INSTALLED WITH 2X4 WOOD AND PLYWOOD FOR THE BATHROOM BEING INSTALLED, OBTAIN ALL PE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 7:27 AM ET. BBL 2028530009.