Bronx · Block 2853 · Lot 9 · 10453

1932 Jerome Avenue

1 floors · 10,300 sq ft · built 1920 · class G2 · owner of record: 1932 Jerome Ave Llc

3open violations
$3,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1161dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1161 days
Next cycle year 2029

Open violations

ECB / OATH (2) · $3,750 owed
IssuedViolationHearingBalance
Sep 1, 2026Construction CLASS - 1
ATOI, OBSERVE WWOP FOR THE ONGOING PLUMBING WORK IN THE BASEMENT AND FIRST FLOOR, WORK APPEARS TO BE 30% DONE FOR THE FIRST FLOOR BATHROOM AND THE PLUMBING WORK IN THE BASEMENT APPEARS TO BE DEMO PIPES WITH NEW
#39202611H
Nov 6, 2026
PENDING
$2,500
Sep 1, 2026Construction CLASS - 2
ATOI, OBSERVE WWOP FOR THE ALTERATION WORK BEING DONE ON THE FIRST FLOOR, WORK APPEARS TO BE 30% DONE. STRUCTURE APPEARS TO BE INSTALLED WITH 2X4 WOOD AND PLYWOOD FOR THE BATHROOM BEING INSTALLED, OBTAIN ALL PE
#39202613L
Nov 6, 2026
PENDING
$1,250
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Oct 7, 2026AEUHAZ FTC-AEU-HAZ
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 7, 2026DOB SafetyAEUHAZ: Open
Sep 1, 2026ECBConstruction: ATOI, OBSERVE WWOP FOR THE ONGOING PLUMBING WORK IN THE BASEMENT AND FIRST FLOOR, WORK APPEARS TO BE 30% DONE FOR THE FIRST FLOOR BATHROOM AND THE PLUMBING WORK IN THE BASEMENT APPEARS TO BE DEMO PIPES WITH NEWOpen
Sep 1, 2026ECBConstruction: ATOI, OBSERVE WWOP FOR THE ALTERATION WORK BEING DONE ON THE FIRST FLOOR, WORK APPEARS TO BE 30% DONE. STRUCTURE APPEARS TO BE INSTALLED WITH 2X4 WOOD AND PLYWOOD FOR THE BATHROOM BEING INSTALLED, OBTAIN ALL PEOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 7:27 AM ET. BBL 2028530009.