2 floors · 2 apartments · 4,420 sq ft · built 1910 · class B1 · owner of record: Thompson, Carmelletto
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 2, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. FACADE EXP 1,2,3 HAS STEP/VERTICAL CRACKS, MISSING BRICK/MORTAR. SHARED DRIVEWAY & STEPS SEMI-COLLAPSING WITH MISSING CONCRETE CHUNKS & RISER HOLES. RETAIN #39202810K | Nov 6, 2026 DEFAULT | $2,530 |
| Issued | Violation | Status |
|---|---|---|
| Sep 2, 2026 | UNSAFE BUILDINGS #2030/2026 | DOB VIOLATION - ACTIVE |
| Sep 2, 2026 | CONSTRUCTION ENGINEERS REPORT REQUESTED : "FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. FACADE AT EXP 1,2,3 HAS STEP/VERTICAL CRACKS, MISSING BRICK/MORTAR .AT SHARED DRIVEWAY MISSING CONCRETE & FRONT STEPS SEMI-COLLAPSING WITH MISSING CONCRETE CHUNKS AT RISER STEPS & HOLES. RETAINING WALL HAS CRACKS & #26-02149 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 4, 2026 | DOB | IMMEDIATE EMERGENCY: REMEDY: PROVIDE A SIDEWALK SHED ACROSS THE ENTIRE LENGTH OF.EXPOSURE 1 APPROXIMATELY 42 LINEAR FEET, INCLUDING 5 FEET BEYOND EACH SIDE OF THE PROPERTY LINE | Closed |
| Sep 2, 2026 | DOB | UNSAFE BUILDINGS: | Open |
| Sep 2, 2026 | DOB | CONSTRUCTION: ENGINEERS REPORT REQUESTED : "FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. FACADE AT EXP 1,2,3 HAS STEP/VERTICAL CRACKS, MISSING BRICK/MORTAR .AT SHARED DRIVEWAY MISSING CONCRETE & FRONT STEPS SEMI-COLLAPSING WITH MISSING CONCRETE CHUNKS AT RISER STEPS & HOLES. RETAINING WALL HAS CRACKS & | Open |
| Sep 2, 2026 | DOB | IMMEDIATE EMERGENCY: REMEDY: INSTALL AN 8-FOOT-HIGH CONSTRUCTION FENCE AS FOLLOWS: 1 EXPO 4:APPROX 10 FT OF CONSTRUCTION FENCE. 2 EXPO 1: ACROSS THE ENTIRE EXPO, APPROX 32 FT, 3 EXPO 2: ALONG THE SHARED DRIVEWAY FOR THE ENTIRE LENGTH OF THE PROPERTY LINE, APPROXIMATELY 125 FT | Closed |
| Sep 2, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. FACADE EXP 1,2,3 HAS STEP/VERTICAL CRACKS, MISSING BRICK/MORTAR. SHARED DRIVEWAY & STEPS SEMI-COLLAPSING WITH MISSING CONCRETE CHUNKS & RISER HOLES. RETAIN | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 7:06 PM ET. BBL 2032210018.