5 floors · 84,830 sq ft · built 1900 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3216). Agency page | Dec 31, 2026 in 42 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 84,830 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 163 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 163 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1138 days | Next cycle year 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 28, 2026 | Construction CLASS - 2 REISSUE: 35689044M-EXIT DOOR NOT SELF-CLOSING. BUILDING 80 3RD FLOOR, STAIR D1, B2 CORRIDOR EXIT, BASEMENT AND CAFE EXIT DOOR NOT SELF-CLOSING. REMEDY: COMPLY WITH CODE. #35734974Z | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 28, 2026 | Construction CLASS - 2 REISSUE: 35724729X-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. WATER PENETRATION @ RM 235, STAIR K, 3RD FLOOR K, WALLS & CEILING.REMEDY: COMPLY WITH CODE. #35734972P | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 28, 2026 | Construction CLASS - 2 REISSUE: 35724726K-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. PANELS MISSING ON 3RDD FLOOR TO 2ND FLOOR. REMEDY: COMPLY WITH CODE. #35734973R | Aug 14, 2026 POP/IN-VIO | $0 |
| Sep 18, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVEDAT TIME OF INSPECTION WATER PENETRATION AT RM 235 AND STAIR K AT 3RD FLOOR. SPALLING AND BROWNING OF THE WALLS AND CEILING. REMEDY: REPAIR A #35724729X | Oct 31, 2025 POP/IN-VIO | $0 |
| Sep 18, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVEDVISION PANELS MISSING ON 3RD FLOOR TO 2ND FLOOR STAIRCASE G. REMEDY: REPAIR AND/OR REPLACE. #35724726K | Oct 31, 2025 POP/IN-VIO | $0 |
| Sep 23, 2024 | Construction CLASS - 2 EXIT DOOR MOT SELF-CLOSING PROPERLY AT THE TIME OF INSPECTION.AT THE TIME OF INSPECTION I OBSERVED THAT AT BUILDING 80 3RD FLOOR AT STAIR D 1 EXIT DOOR.AT STAIR B 2 CORRIDOR EXIT DOOR,AT BASEMENT CAFETERIA MAIN #35689044M | Nov 29, 2024 POP/IN-VIO | $0 |
| Jan 10, 2022 | Boilers CLASS - 2 BOILER NO.1, FLOODING. BOILER NO.2, DEFECTIVE ELECTRICAL TO PRESSURE SWITCH-WATER COLUMN BLOW DOWN PIPING CORRODED. #39054018P | Jan 12, 2022 POP/IN-VIO | $0 |
| Jun 22, 2018 | Boilers CLASS - 2 50,50A,50B,50C-50)COMBUSTION AIR INTAKE ON UNIT NOT THRU JACKET ON TOP. 50A)HOT WATER INSTLLED OUTSIDE BOILER ROOM HEATER. -AIR HANDLER'S IN CELLAR- 50B)MOTORIZED FRESH AIR LOUVER #1 OF 2 IS MISSING OPEN LOUVER #32097093K | Oct 19, 2018 POP/IN-VIO | $0 |
| Jun 22, 2018 | Boilers CLASS - 2 50,50A,50B-50)BOILER ROOM DOORS NOT INSTALLED. 50A)BOILER FEED TANK WATER COLUMN'S MISSING CROSS TEES. 50B)VAC SYSTEM FEED LEAKING ONTO TANK. #32097092Z | Oct 19, 2018 POP/IN-VIO | $0 |
| Mar 25, 1994 | Construction Hazardous FAILURE TO MAINTAIN < 1980 ANDREWS AVE P.S. 26 NO CEILING IN GIRLS & BOYS TOILET IN BASEMENT AND FIRST THRU THIRD {SOUTH & NORTH COOKING AREA CEILING MISSING << ROOM 229-235-135-129 SPRAWLING PLASTER. STAU WAL #34102818P | May 6, 1994 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06568 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06567 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 28, 2026 | ECB | Construction: REISSUE: 35689044M-EXIT DOOR NOT SELF-CLOSING. BUILDING 80 3RD FLOOR, STAIR D1, B2 CORRIDOR EXIT, BASEMENT AND CAFE EXIT DOOR NOT SELF-CLOSING. REMEDY: COMPLY WITH CODE. | Open |
| Jul 28, 2026 | ECB | Construction: REISSUE: 35724729X-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. WATER PENETRATION @ RM 235, STAIR K, 3RD FLOOR K, WALLS & CEILING.REMEDY: COMPLY WITH CODE. | Open |
| Jul 28, 2026 | ECB | Construction: REISSUE: 35724726K-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. PANELS MISSING ON 3RDD FLOOR TO 2ND FLOOR. REMEDY: COMPLY WITH CODE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 1:38 AM ET. BBL 2032160002.