5 floors · 8 apartments · 9,100 sq ft · built 1910 · class C1 · owner of record: Buffalo Park Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 63 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-01 (Accepted). Agency page | Dec 31, 2026 in 63 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #39188 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #05989 | DOB VIOLATION - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #15599 | DOB VIOLATION - ACTIVE |
| May 4, 1998 | LOCAL LAW 62/91 - BOILERS #17070 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #23160 | DOB VIOLATION - ACTIVE |
| Jul 25, 1994 | LOCAL LAW 62/91 - BOILERS #01337 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Jul 25, 1994 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 1, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 4, 2026 |
| Feb 11, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT SOUTH WALL AT PUBLIC HALL, 3rd STORY | Mar 18, 2026 |
| Feb 11, 2026 | C | Apt 1 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 25, 2026 |
| Feb 11, 2026 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 9, 2026 |
| Feb 11, 2026 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 9, 2026 |
| Oct 28, 2025 | B | Apt 7 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 2, 2025 |
| Oct 28, 2025 | B | Apt 7 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GRATER THAN 10 SQUARE FEET AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 2, 2025 |
| Oct 28, 2025 | B | Apt 7 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 2, 2025 |
| Oct 28, 2025 | B | Apt 7 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM SOUTH AT WES | Dec 2, 2025 |
| Oct 28, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT WEST AND EAST WALL AT PUBLIC HALL STAIRS, 5th STORY | Dec 2, 2025 |
| Oct 28, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST AND EAST WALL AT PUBLIC HALL STAIRS, 5th STORY | Jan 31, 2026 |
| Oct 28, 2025 | B | Apt 7 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 2, 2025 |
| Oct 28, 2025 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BULKHEAD DOOR SOUTH WALL AT PUBLIC HALL, 5th STORY | Nov 11, 2025 |
| Jun 6, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 9, 2025 |
| Feb 18, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR LEADING TO BOILER ROOM AT BOILER ROOM | Feb 24, 2025 |
| Feb 11, 2025 | C | Apt 1 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 11, 2025 |
| Sep 16, 2024 | C | Apt 8 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 12, 2024 |
| Jun 10, 2024 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL PARTS ALL BALCONY ALL STORIES AT BUILDING FRONT AT FIRE ESCAPE | Sep 13, 2024 |
| Jun 3, 2024 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT FIRE ESCAPE FRONT OF BUILDING AT FIRE ESCAPE | Sep 6, 2024 |
| Nov 28, 2023 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LEADING TO BOILER ROOM LOCKED AT BOILER ROOM | Dec 4, 2023 |
| Apr 3, 2023 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT | Apr 9, 2023 |
| Mar 21, 2023 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT SOUTH YARD LEADING TO BOILER ROOM AT CELLAR | Mar 27, 2023 |
| May 5, 2022 | B | Apt 10 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 10, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 9, 2022 |
| May 5, 2022 | B | Apt 4 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 9, 2022 |
| Apr 25, 2022 | C | Apt 7 · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Apr 29, 2022 |
| Apr 25, 2022 | C | Apt 7 · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Apr 29, 2022 |
| Oct 15, 2021 | B | Apt 2 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERABLE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 19, 2021 |
| Oct 15, 2021 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT | Nov 8, 2021 |
| Oct 15, 2021 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE FOYER LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 8, 2021 |
| Oct 15, 2021 | A | Apt 2 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION .. 1st RISER FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 18, 2022 |
| Oct 15, 2021 | A | Apt 2 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ... 1st DOOR FROM SOUTH AT WEST WALL, NORTH WALL, CEILING IN THE FOYER LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 18, 2022 |
| Oct 15, 2021 | B | Apt 2 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR INOPERABLE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 19, 2021 |
| May 21, 2019 | B | Apt 3 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... THE NORTH WALL, EAST WALL, CEILING IN THE BATHROOM LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 25, 2019 |
| Apr 15, 2019 | A | Apt 2 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY | Jul 19, 2019 |
| Oct 29, 2018 | B | Apt 8 · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING APPROXIMATELY 6 SQUARE FEET IN THE BATHROOM LOCATED AT APT 8, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 3, 2018 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 8:36 AM ET. BBL 3013690008.