Brooklyn · Block 1352 · Lot 80 · 11213

193 Albany Avenue

14 floors · 829 apartments · 821,016 sq ft · built 1950 · class D3 · owner of record: Nyc Housing Authority

45open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 47 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 821,016 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $660,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 830 days
Filing window not open yet
Energy audit and retro-commissioning (2032) Likely applies
Local Law 87 · Calendar year 2032
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1352). Agency page

Dec 31, 2032
in 2239 days
Next due 2032
Annual boiler inspection (4 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-14 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Nov 3, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES.-NOTE: AT TIME OF INSPECTION, I OBSERVED AT EXP #2 NORTH-CRACKED/BROKEN WINDOW PANES AT BOTH 10TH FL AND 7 FL WINDOWS.-EXP #3 EAST: CRACKED/BROKEN WIND
#35718053Y
Nov 24, 2025
POP/IN-VIO
$0
Aug 18, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES.-NOTE: AT TIME OF INSPECTION I OBSERVED EXP #2 NORTH-BROKEN WINDOW GLASS AT 10FL WINDOW.-EXP #4 SOUTH-OBJECTS(PLANTS) ON THE WINDOWSILL OF 14FL WINDOW
#35718374P
Sep 17, 2025
POP/IN-VIO
$0
DOB (10)
IssuedViolationStatus
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00680
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00678
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00679
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00681
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00677
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00682
DOB VIOLATION - ACTIVE
Jun 1, 2016NYCHA ELEVATOR PERIODIC INSPECTION/TEST
FAILURE TO PERFORM CATEGORY 5 INSPECTION
#00108
DOB VIOLATION - ACTIVE
Jun 1, 2016NYCHA ELEVATOR PERIODIC INSPECTION/TEST
FAILURE TO PERFORM CATEGORY 5 INSPECTION
#00110
DOB VIOLATION - ACTIVE
Jun 1, 2016NYCHA ELEVATOR PERIODIC INSPECTION/TEST
FAILURE TO PERFORM CATEGORY 5 INSPECTION
#00109
DOB VIOLATION - ACTIVE
Dec 28, 1990CONSTRUCTION

#NERS01
DOB VIOLATION - ACTIVE
DOB NOW Safety (8)
IssuedViolationStatus
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
HPD (25) · C 0 · B 1 · A 24
IssuedClassViolationCorrect by
Jun 27, 2013BApt 6B · § 27-2005 ADM CODE REMOVE THE TORN AND/OR LOOSE FLOOR COVERING .. IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 5th APARTMENT FROM EAST AT SOUTHAug 1, 2013
Aug 16, 2011AApt 3A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST, THE BATHROOM , THE FOYER LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WESTNov 19, 2011
Jul 28, 2006AApt 12J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , WEST WALL, NORTH WALL IN THE 1st BATHROOM LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 2nd RISER FROM EAST AT SOUTH WALL, 1st RISER FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 1st BATHROOM LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , WEST WALL, EAST WALL IN THE 2nd FOYER LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , WEST WALL, EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , EAST WALL, CEILING IN THE 1st PRIVATE HALLWAY LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , WEST WALL, EAST WALL, CEILING IN THE 2nd PRIVATE HALLWAY LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , 1st WINDOW FRAME FROM EAST AT SOUTH WALL, EAST WALL, SOUTH WALL, NORTH WALL, CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 2nd RISER FROM NORTH AT EAST WALL, 1st RISER FROM NORTH AT EAST WALL, 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , WEST WALL, EAST WALL, SOUTH WALL, NORTH WALL, CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 2nd RISER FROM SOUTH AT WEST WALL, 1st RISER FROM SOUTH AT WEST WALL, 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , EAST WALL, SOUTH WALL, CEILING IN THE 2nd BATHROOM LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 1st WINDOW FRAME FROM SOUTH AT WEST WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 2nd RISER FROM EAST AT SOUTH WALL, 1st RISER FROM EAST AT SOUTH WALL, 1st RADIATOR FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL Nov 24, 2006
Jul 28, 2006AApt 12J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , WEST WALL, EAST WALL, SOUTH WALL, NORTH WALL, CEILING IN THE 5th ROOM FROM NORTH AT EAST LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , WEST WALL, EAST WALL, SOUTH WALL, NORTH WALL, CEILING IN THE 5th ROOM FROM NORTH AT EAST LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 2nd RISER FROM EAST AT SOUTH WALL, 1st RISER FROM EAST AT SOUTH WALL, 1st RADIATOR FROM EAST AT SOUTH WALL Nov 24, 2006
Jul 28, 2006AApt 12J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , WEST WALL, EAST WALL, SOUTH WALL, NORTH WALL, CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 1st WINDOW FRAME FROM NORTH AT EAST WALL, 2nd RISER FROM NORTH AT EAST WALL, 1st RISER FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 12J, 12th STORY, 1st APARTMENTNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , WEST WALL, EAST WALL, SOUTH WALL, NORTH WALL, CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 1st WINDOW FRAME FROM SOUTH AT WEST WALL, 2nd RISER FROM SOUTH AT WEST WALL, 1st RISER FROM SOUTH AT WEST WALL, 1st RADIATOR FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATEDNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , EAST WALL, CEILING IN THE 2nd KITCHEN LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , CEILING IN THE 1st KITCHEN LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , WEST WALL, EAST WALL, SOUTH WALL, NORTH WALL, 2nd RISER FROM EAST AT SOUTH WALL, CEILING IN THE 5th ROOM FROM NORTH AT WEST LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006
Jul 28, 2006AApt 12J · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 2nd RISER FROM EAST AT SOUTH WALL, 1st RISER FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 2nd BATHROOM LOCATED AT APT 12J, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 24, 2006

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 5:35 AM ET. BBL 3013520080.

Look up another building