2 floors · 3 apartments · 2,600 sq ft · built 1920 · class C0 · owner of record: 1925 Putnam Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1166 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 10, 2026 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. OBSERVED ON 1S FL ILLEGAL INSTALLATION OF FULL HEIGHT PARTITIONS AT NORTH WEST CORNER WITH LOCKABLE DOOR BLOCKING EXIT OUT OF PREMISES., REMOVE OBSTRUCTION #39200005Z | Dec 15, 2026 PENDING | $2,500 |
| Aug 10, 2026 | Construction CLASS - 2 WORK W/O PERMIT. CELLAR LEVEL - INSTALLED WATER & WASTE LINES FOR 3PC BATH (SINK ,TOILET, STALL SHOWER) W/OBTAINING REQ'D PERMITS/AUTHORIZATION., OBTAIN ALL PERMITS #39200007M | Dec 15, 2026 PENDING | $1,250 |
| Aug 10, 2026 | Construction CLASS - 2 OBSERVED MULT DWELLING W/CELLAR NOW CONVERTED ILLEGALLY TO SLEEPING QUARTERS W/3 BDRMS, TWO (2) 3 PC BTHS, LAUNDRY RM, & LIVING SPACE. NO 2ND MEANS OF EGRESS, INSUFF LIGHT & VENTILATION & NO FIRE SUPPRESSION SY #39200006K | Dec 15, 2026 PENDING | $1,250 |
| Apr 27, 2026 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O AND/OR DEPARTMENT OF BUILDING RECORDS. PARTITONS ERECTED ILLEGAL ROOMS FOR LIVING AND SLEEPING AT CELLAR IN CONJUNCTION WITH 1ST STORY CREATING AN ILLEGAL DUPLEX APA #35723037K | Dec 1, 2026 PENDING | $1,250 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 15, 2026 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 10, 2026 |
| May 7, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 10, 2026 |
| Apr 30, 2026 | B | § 27-2081 ADM CODE DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES AND PROPERLY SEAL PIPE CONNECTIONS WATER CLOSET, WASH BASIN AND SHOWER STALL ILLEGALLY USE SLEEPING IN CONJUCTION WITH APARTMENT 1, 1ST FLOOR, CREATING ILLEGAL DUPLEX APARTMENT AT CELLAR | Jun 4, 2026 |
| Apr 30, 2026 | B | Apt 1 · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT WASHBASIN IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 1 UPPER LEVEL, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 4, 2026 |
| Apr 28, 2026 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | May 24, 2026 |
| Apr 28, 2026 | B | Apt 1 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 2, 2026 |
| Apr 28, 2026 | B | Apt 1 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 2, 2026 |
| Mar 9, 2026 | C | Apt 1 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 15, 2026 |
| Mar 9, 2026 | C | Apt 1 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 7, 2026 |
| Mar 9, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR TO BOILER ROOM LOCKED AT CELLAR | Mar 15, 2026 |
| Mar 9, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR TO BOILER ROOM LOCKED AT BASEMENT AT BOILER ROOM | Mar 15, 2026 |
| Mar 9, 2026 | C | Apt 1 · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 7, 2026 |
| Jun 12, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 15, 2025 |
| Apr 16, 2024 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 20, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 10, 2026 | ECB | Construction: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. OBSERVED ON 1S FL ILLEGAL INSTALLATION OF FULL HEIGHT PARTITIONS AT NORTH WEST CORNER WITH LOCKABLE DOOR BLOCKING EXIT OUT OF PREMISES., REMOVE OBSTRUCTION | Open |
| Aug 10, 2026 | ECB | Construction: WORK W/O PERMIT. CELLAR LEVEL - INSTALLED WATER & WASTE LINES FOR 3PC BATH (SINK ,TOILET, STALL SHOWER) W/OBTAINING REQ'D PERMITS/AUTHORIZATION., OBTAIN ALL PERMITS | Open |
| Aug 10, 2026 | ECB | Construction: OBSERVED MULT DWELLING W/CELLAR NOW CONVERTED ILLEGALLY TO SLEEPING QUARTERS W/3 BDRMS, TWO (2) 3 PC BTHS, LAUNDRY RM, & LIVING SPACE. NO 2ND MEANS OF EGRESS, INSUFF LIGHT & VENTILATION & NO FIRE SUPPRESSION SY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 11:10 PM ET. BBL 4034810053.