6 floors · 54 apartments · 44,820 sq ft · built 1931 · class D1 · owner of record: 1925 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 65 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 44,820 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-04 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01269 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #03782 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #04651 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #04771 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #05362 | DOB VIOLATION - ACTIVE |
| Jun 1, 2016 | NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST FAILURE TO PERFORM CATEGORY 5 INSPECTION #00937 | DOB VIOLATION - ACTIVE |
| Mar 31, 2014 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST #03132 | DOB VIOLATION - ACTIVE |
| Aug 30, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 #01178 | DOB VIOLATION - ACTIVE |
| Nov 30, 2007 | LOCAL LAW 11/98 - FACADE #NRF44857 | DOB VIOLATION - ACTIVE |
| Jun 9, 1994 | LOCAL LAW 62/91 - BOILERS #00545 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Jun 1, 2016 | Elevators EVCAT5 | Active |
| Mar 31, 2014 | Elevators EVCAT1 | Active |
| Aug 30, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Active |
| Nov 30, 2007 | Facades LL1198 CYCLE 6 NO REPORT FILED | Active |
| Jun 9, 1994 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 8, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES DOOR AT BULKHEAD , 6th STORY | Nov 3, 2026 |
| Oct 8, 2026 | A | Apt 5H · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL ERECTED FROM FLOOR TO CEILING CREATING ADDITIONALS ROOM IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 5H, 5th STORY, 1st APARTMENT | Jan 11, 2027 |
| Sep 15, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT PUBLIC HALL, 1st STORY | Dec 19, 2026 |
| Sep 15, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH WALL AT PUBLIC HALL, 1st STORY | Oct 20, 2026 |
| Jun 8, 2026 | A | Apt 5A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 11, 2026 |
| Jun 4, 2026 | B | Apt 3H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM RETURN SYSTEM AT BUILDING ENTRANCE LEADING TO NORTH WALL IN THE ENTIRE APARTMENT LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 9, 2026 |
| Jun 4, 2026 | B | Apt 3H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 9, 2026 |
| Jun 4, 2026 | B | Apt 3H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 9, 2026 |
| Jun 4, 2026 | B | Apt 3H · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASHBASIN IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 9, 2026 |
| Jun 4, 2026 | A | Apt 3H · § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL AT WATER CLOSET IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 7, 2026 |
| Jun 4, 2026 | B | Apt 3H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 9, 2026 |
| Jun 4, 2026 | B | Apt 3H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 9, 2026 |
| Jun 4, 2026 | B | Apt 3H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL , CEILING AND SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 9, 2026 |
| Jun 4, 2026 | B | Apt 3H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 9, 2026 |
| Jun 4, 2026 | B | Apt 3H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 15SQFT AT WEST WALL AND NORTH WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 9, 2026 |
| Sep 2, 2025 | B | Apt 3H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OF MOLD AT EAST, NORTH, AND WEST WALLS IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH ORIGINAL VIOLATION 17862269 ISSUED 30-APR-25 | Oct 7, 2025 |
| Sep 2, 2025 | A | Apt 3H · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 6, 2025 |
| Sep 2, 2025 | A | Apt 3H · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 6, 2025 |
| Jun 27, 2025 | C | Apt 3H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) NOR | Jul 21, 2025 |
| May 5, 2025 | B | Apt 3H · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT 1ST ELECTRICAL OUTLET FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 9, 2025 |
| May 5, 2025 | B | Apt 3H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATHTUB IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 9, 2025 |
| May 5, 2025 | B | Apt 3H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILE AT EAST WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 9, 2025 |
| May 5, 2025 | B | Apt 3H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SILICONE CAULK AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 9, 2025 |
| May 5, 2025 | B | Apt 3H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER ESCUTCHEON PLATE IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 9, 2025 |
| May 5, 2025 | B | Apt 3H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST, NORTH, AND WEST WALLS IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 9, 2025 |
| May 5, 2025 | B | Apt 3H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST, NORTH, AND WEST WALLS IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 9, 2025 |
| May 5, 2025 | B | Apt 3H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE KITCHEN LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 9, 2025 |
| May 5, 2025 | B | Apt 3H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 9, 2025 |
| May 5, 2025 | B | Apt 3H · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MARBLE SADDLE IN THE KITCHEN LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 9, 2025 |
| May 1, 2025 | B | Apt 3H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING, EAST, AND WEST WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 5, 2025 |
| May 1, 2025 | B | Apt 3H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, EAST, NORTH, AND WEST WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 5, 2025 |
| May 1, 2025 | B | Apt 3H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUZZER AND RETURN VOICE INTERCOM SYSTEM FROM BUILDING ENTRANCE UP TO PANEL AT SOUTH WALL IN THE FOYER LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 5, 2025 |
| May 1, 2025 | B | Apt 3H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 5, 2025 |
| May 1, 2025 | B | Apt 3H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 5, 2025 |
| May 1, 2025 | B | Apt 3H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 5, 2025 |
| May 1, 2025 | B | Apt 3H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, EAST, NORTH, SOUTH, AND WEST WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''F-J'', AT SOUTH | Jun 5, 2025 |
| Sep 9, 2024 | B | Apt 6D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT IN THE 2nd WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 14, 2024 |
| Sep 9, 2024 | A | Apt 6D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd PRIVATE HALLWAY FROM EAST, THE KITCHEN , THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 13, 2024 |
| Sep 9, 2024 | B | Apt 6D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT WEST WALL IN THE KITCHEN LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 14, 2024 |
| Mar 16, 2023 | A | Apt 6C · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION STUD AND SHEETROCK WALL ERECTED FROM FLOOR TO CEILING WITH DOOR OPENING SUBDIVIDING ROOM IN TWO IN THE 1st ROOM FROM EAST AT NORTH LOCATED | Jun 19, 2023 |
| Mar 15, 2023 | C | Apt 5B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 10, 2023 |
| Mar 15, 2023 | C | Apt 5B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 10, 2023 |
| Jun 10, 2022 | C | Apt 3A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 50 SQ FT AT EAST WALL, SOUTH WALL, WEST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st DOOR FROM SOUTH AT WEST WALL, NORTH WALL, CEILING, 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 3 | Jul 6, 2022 |
| Dec 6, 2021 | B | Apt 6D · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO APARTMENT WALL PANEL IN FOYER LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 10, 2022 |
| Dec 6, 2021 | C | Apt 6D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 1, 2022 |
| Nov 23, 2021 | A | Apt 5J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WINDOW STOOL IN THE 1st ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Feb 26, 2022 |
| Nov 23, 2021 | B | Apt 5C · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR INOPERABLE LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 28, 2021 |
| Nov 23, 2021 | B | Apt 5C · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERABLE LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 28, 2021 |
| Nov 23, 2021 | C | Apt 5C · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK AT DOOR LEADING TO FIRE ESCAPE IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 29, 2021 |
| May 28, 2021 | A | Apt 1G · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DRYWALL PARTITION ERECTED FROM FLOOR TO CEILING, SUBDIVIDING THE ROOM AND DIMINISHING LIGHT. IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT | Aug 31, 2021 |
| Feb 1, 2021 | B | Apt 6E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APROX. 25 SQ. FT. AT THE CEILING IN THE FOYER LOCATED AT APT 6E, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 8, 2021 |
| Feb 1, 2021 | B | Apt 6E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APROX. 16 SQ. FT. AT THE CEILING IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 8, 2021 |
| Feb 1, 2021 | B | Apt 6E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APROX. 8 SQ. FT. AT EAST WALL APROX. 16 SQ. FT. AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6E, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 8, 2021 |
| Feb 1, 2021 | B | Apt 6E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APROX. 4 SQ. FT. AT CEILING APROX. 8 SQ. FT. AT WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 6E, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 8, 2021 |
| Jan 29, 2021 | A | Apt 6E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 4, 2021 |
| Dec 23, 2020 | C | Apt 4C · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF LOCKABLE SLIDE BOLT ON DOOR IN THE ENTRANCE LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 29, 2020 |
| Dec 10, 2018 | C | Apt 1F · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE LOWER SASH GLASS WINDOW AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH | Dec 18, 2018 |
| Feb 16, 2017 | A | Apt 3D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SHEETROCK WALL ERECTED FROM FLOOR TO CEILING SUB-DIVIDING THE ROOM IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3D, 3rd | May 22, 2017 |
| Jul 7, 2005 | B | Apt 5B · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN mice, IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Aug 16, 2005 |
| Jul 7, 2005 | B | Apt 5B · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE, IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Aug 16, 2005 |
Showing 60 of 63. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 8, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES DOOR AT BULKHEAD , 6th STORY | Open |
| Oct 8, 2026 | HPD A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL ERECTED FROM FLOOR TO CEILING CREATING ADDITIONALS ROOM IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 5H, 5th STORY, 1st APARTMENT | Open |
| Sep 15, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT PUBLIC HALL, 1st STORY | Open |
| Sep 15, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH WALL AT PUBLIC HALL, 1st STORY | Open |
| Jun 30, 2026 | HPD B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING LATCH AND ITS ASSEMBLY AT VESTIBULE DOOR 1ST STORY AT PUBLIC HALL | Closed |
| Jun 30, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE AT HOPPER DOOR 2ND STORY AT PUBLIC HALL | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 12:15 AM ET. BBL 2030600021.