28 floors · 959,880 sq ft · built 1972 · class W9 · owner of record: Albert Einstein College Of Medicine
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 959,880 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 430 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 4205). Agency page | Dec 31, 2035 in 3352 days | Next due 2035 |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $796,950 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: UNSAFE (2025-09-26) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 21, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION, OBSERVED TEMPORARY LIGHTING INSTALLED BENEATH THE SIDEWALK SHED. ELECTRICAL PERMIT X01160056-I1-EL EXPIRED ON 06/12/2026 AND THE LIGHTING REMAINED IN OPERATION UNDER THE EXPIRED PERMIT. C #39559406K | Dec 4, 2026 PENDING | $1,250 |
| Sep 5, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALLS AND/OR APPURTENANCES. AT TIME OF INSPECTION, I OBSERVED CRACKING CONCRETE WALL(WHITE STRIPE RISE-UP); 14 FLOOR LEVEL AT EXPOSURE 4 SOUTH ELEVATION. REMEDY: OWNER TO REPAIR/REP #35718463R | Dec 5, 2025 STIPULATION/IN-VIO | $0 |
| Nov 22, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES. AS NOTED: AT THE TIME OF INSPECTION I OBSERVED ON SEVERAL EXPOSURES: CRACKS AND SPALLING FLOOR SLAB EYE BROWS AT MULTIPLE FLOOR. DAMAGED MORTAR JOI #35686598K | Jul 11, 2025 IN VIOLATION | $0 |
| Nov 22, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES. AS NOTED: AT THE TIME OF INSPECTION I OBSERVED ON MULTIPLE EXPOSURES: SPALLING, CRACKED MASONRY AT SEVERAL FLOORS ON EYE BROWS AND BRICK WORK. ROOF #35686597Z | Jul 11, 2025 IN VIOLATION | $0 |
| Nov 22, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES. AS NOTED: AT THE TIME OF INSPECTION I OBSERVED ON SEVERAL EXPOSURES SPALLING,CRACKED FLOOR SLAB EYEBROWS ON MULTIPLE=FLOORS. CRACKS AND SPALLING ON #35686599M | Jul 11, 2025 IN VIOLATION | $0 |
| Sep 27, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: OBSERVED AT EXPOSURE 3(NORTH ELEVATION) 2 CRACKED WINDOW GLASS, ONE WINDOW ON THE FIRST FLOOR, SECOND CRACKED WINDOW GLASS LOCATED APPROXIMA #35686330J | May 23, 2025 IN VIOLATION | $0 |
| Sep 27, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: OBSERVED AT EXPOSURE 2(NORTH ELEVATION) A CRACKED WINDOW NOT NOTED ON QEWI REPORT, LOCATED APPROXIMATELY BETWEEN FLOORS 4-6, WITH NO SAFETY #35686328K | May 23, 2025 IN VIOLATION | $0 |
| Sep 27, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: OBSERVED AT ALL EXPOSURES SPALLING/CRACKED CONCRETE SLABS, SPALLING MASONRY, DETERIORATED MORTAR JOINTS AND SPALLING SILLS ON THE ROOF ELEVA #35686329M | May 23, 2025 IN VIOLATION | $0 |
| May 15, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #35635427X ISSUED 10/1/2021 & FAILURE TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 & 1RCNY 102-01(D)(2).AN ACCEPTABLE CERTIFICATE HAS N #37028413N | Aug 16, 2024 IN VIOLATION | $0 |
| May 15, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #35635425M ISSUED 10/1/2021 & FAILURE TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 & 1RCNY 102-01(D)(2).AN ACCEPTABLE CERTIFICATE HAS N #37028411J | Aug 16, 2024 IN VIOLATION | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE9A REPORT OF CRITICAL EXAM DOCUMENTING CONDITION OF EXTERIOR WALL&APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL908598.SUBMIT ACCEPTABLE REQUIRED TECHNICAL REPORT #37024268H | Mar 3, 2023 IN VIOLATION | $0 |
| Oct 1, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES.AS NOTED:AT TIME OF INSPECTION OBSERVED AT EXP #3 SPALLING MASONRY AT SEVERAL FLOORS & SPALLING CRACKED CONCRETE ON 28TH FLOOR SPANDREL DAMAGED CRAC #35635425M | Dec 17, 2021 STIPULATION/IN-VIO | $0 |
| Oct 1, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES.AS NOTED:AT TIME OF INSPECTION OBSERVED ON EXP #3 VERTICAL CRACKS IN BRICKS AT 28TH FLOOR SPALL CRACKED EYEBROW/CONCRETE FLOOR SLAB ON 13TH FLOOR EX #35635427X | Dec 17, 2021 STIPULATION/IN-VIO | $0 |
| Aug 17, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.AS NOTED BUILDING HAS SPALLED CONCRETE MASONRY ON ALL EXPOSURES AND ON ROOF IN SEVERAL LOCATIONS ALSO DAMAGED MORTAR JOINTS AND STEP CRACKING THROU #35577899L | Dec 10, 2021 IN VIOLATION | $0 |
| Aug 17, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.AS NOTED:BUILDING HAS SPALLED CONCRETE MASORY ON ALL EXPOSURES AND ON ROOF IN SEVERAL LOCATIONS ALSO DAMAGED MORTAR JOINTS AND STEP CRACKING THROUG #35577898J | Dec 10, 2021 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 22, 2024 | CONSTRUCTION EWO DUE TO HAZARD CONDI OBSERVED ON SERVERAL EXP & ON ROOF:CRACKED & SPALLING FLR EYE BROW @ MULTI FLRS.SPALLING, DAMAGE MORTAR JOINTS IN BRICK BULKHEAD; DISINTERGRATING COPING STONE ON BULKHEAD; CRACK IN SEA -LANT JOINTS ON PARAPET WALLS;BROKEN BULKHEAD WINDOW PANES. REMDY: IMMEDY PROVIDE SAFETY ME #LL1103RF | DOB VIOLATION - ACTIVE |
| Nov 22, 2024 | CONSTRUCTION EWO DUE TO IMMINENT HAZARD CONDITIONS OBSERVED ON EXP 1,2,3,4 & ROOF CONDITIONS SUCH AS CRACKED, SPALLING, EYEBROW ON VARIOUS FLRS & @ PARA -PET & BULKHEAD/PENTHOUSE COPING STONES & WINDOW PANES REMEDY: IMMEDIATELY PROVIDE SIDEWALK SAFETY MEASURE SHED, NETTING.,ETC TO PROTECT THE PUBLIC. REPAIR DAMA #LL1102RF | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00943 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00944 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00942 | DOB VIOLATION - ACTIVE |
| Jun 2, 2021 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00791 | DOB VIOLATION - ACTIVE |
| May 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01648 | DOB VIOLATION - ACTIVE |
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #01485 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #02301 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #02300 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 26, 2026 | Facades FTC-FC-UNSAFE unsafe report filed | Active |
| Jan 26, 2026 | Facades FTC-FC-UNSAFE unsafe report filed | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Jun 2, 2021 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jun 9, 1994 | Boiler LL6291 | Active |
| May 17, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 30, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 3, 2026 |
| Mar 18, 2026 | C | Apt 2D · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDS THE MAXIMUM ALLOW TEMP. OF 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 24, 2026 |
| Feb 23, 2026 | C | Apt 28C · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 28C, 28th STORY, 2nd APARTMENT FROM WEST AT NORTH | Feb 22, 2026 |
| Feb 23, 2026 | B | Apt 28C · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT BATHTUB IN THE BATHROOM LOCATED AT APT 28C, 28th STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 30, 2026 |
| Feb 23, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Mar 1, 2026 |
| Feb 19, 2026 | C | Apt 23A · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 23A, 23rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Feb 19, 2026 |
| Feb 17, 2026 | C | Apt 27D · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 27D, 27th STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 15, 2026 |
| Feb 17, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Feb 23, 2026 |
| Feb 17, 2026 | C | Apt 26D · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 26D, 26th STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 15, 2026 |
| Feb 17, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LO KED AT BOILER ROOM | Feb 23, 2026 |
| Feb 9, 2026 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | May 15, 2026 |
| Feb 9, 2026 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY | Feb 15, 2026 |
| Feb 9, 2026 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | May 15, 2026 |
| Feb 9, 2026 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | May 15, 2026 |
| Feb 9, 2026 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | May 15, 2026 |
| Jan 12, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Jan 18, 2026 |
| Jan 9, 2026 | C | Apt 18F · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 18F, 17th STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 8, 2026 |
| Jun 5, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 8, 2025 |
| May 8, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE CLOSER ARMS, DOOR LEAD FROM PUBLIC HALL TO LANDURY ROOM AT LAUNDRY ROOM, 1st STORY | May 22, 2024 |
| Mar 4, 2021 | A | Apt 15B · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOW FRAME IN THE 2nd ROOM FROM NORTH LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 7, 2021 |
| Mar 4, 2021 | A | Apt 15B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 7, 2021 |
| Mar 4, 2021 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL | Jun 7, 2021 |
| Mar 4, 2021 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING NOTICE AT PUBLIC HALL | Mar 10, 2021 |
| Mar 4, 2021 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL | Jun 7, 2021 |
| Mar 4, 2021 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL | Jun 7, 2021 |
| Mar 4, 2021 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL | Jun 7, 2021 |
| Apr 29, 2019 | B | Apt 8F · § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ... IN THE ENTRANCE LOCATED AT APT 8F, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 3, 2019 |
| Jul 30, 2018 | B | Apt 2E · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 3, 2018 |
| Jul 30, 2018 | B | Apt 2E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 3, 2018 |
| Jul 30, 2018 | A | Apt 2E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE PRIVATE HALLWAY , THE 1st ROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH AT EAST, THE FOYER , THE 3rd ROOM FROM NORTH LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT | Nov 2, 2018 |
| Jul 30, 2018 | B | Apt 2E · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 3, 2018 |
| Jul 30, 2018 | B | Apt 2E · § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ... IN THE ENTRANCE LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 3, 2018 |
| Jul 27, 2015 | A | Apt 15G · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WINDOW SILL IN THE KITCHEN LOCATED AT APT 15G, 15th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''1945'' | Oct 30, 2015 |
| Jul 27, 2015 | A | Apt 15G · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WINDOW SILL IN THE 3rd ROOM FROM EAST LOCATED AT APT 15G, 15th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''1945'' | Oct 30, 2015 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 21, 2026 | ECB | Construction: AT TIME OF INSPECTION, OBSERVED TEMPORARY LIGHTING INSTALLED BENEATH THE SIDEWALK SHED. ELECTRICAL PERMIT X01160056-I1-EL EXPIRED ON 06/12/2026 AND THE LIGHTING REMAINED IN OPERATION UNDER THE EXPIRED PERMIT. C | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 11:28 PM ET. BBL 2042050002.