Bronx · Block 2985 · Lot 23 · 10460

1922 Crotona Parkway

4 floors · 17 apartments · 27,691 sq ft · built 1911 · class D4 · owner of record: Crotona Park Estates Hdfc, Inc.

20open violations
$0ECB/OATH penalties owed
6HPD class C (immediately hazardous)
50dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 50 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 27,691 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 171 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 171 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 294 days
Registered through 2027-09-01
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-01 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Jan 17, 2020LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#01030
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#04018
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Jan 17, 2020Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
HPD (14) · C 6 · B 5 · A 3
IssuedClassViolationCorrect by
Dec 5, 2024CApt 1A · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHDec 5, 2024
Dec 5, 2024CApt 1A · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR IN THE ENTRANCE LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHDec 19, 2024
Dec 5, 2024C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCK AT BOILER ROOMDec 11, 2024
Dec 3, 2024CApt 1C · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 3rd ROOM FROM EAST LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM WEST AT NORTHDec 3, 2024
Dec 3, 2024C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCK DOOR AT BOILER ROOMDec 9, 2024
Mar 18, 2024AApt 2A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION FAN AT THE CEILING . IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 21, 2024
Mar 18, 2024AApt 2A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION FAN AT THE CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 21, 2024
Mar 18, 2024AApt 2A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION FAN AT THE CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 21, 2024
Jan 24, 2024BApt 2A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM AND BELL BUZZER AT EAST WALL IN THE FOYER LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 28, 2024
Sep 18, 2023BApt 4B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENT AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTOct 23, 2023
Sep 18, 2023BApt 4B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENT AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTOct 23, 2023
Sep 18, 2023BApt 3B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENT AT CEILING IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTOct 23, 2023
Sep 18, 2023CApt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTOct 14, 2023
Sep 18, 2023BApt 3B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 25 SQ FT IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTOct 23, 2023

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 4:00 PM ET. BBL 2029850023.

Look up another building