| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 297,421 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 409 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1768). Agency page | Dec 31, 2028 in 775 days | Next due 2028 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-04 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 24, 2026 | Construction CLASS - 2 REISSUE ECB #35725234Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT (ROOF)BULKHEAD/STAIR C (4TH FL)CLASS ROOMS 420, 422 AND LIBRARY RM 419 WATER/DAMAGE TO WALLS/CEILINGS WITH STAINING AND SP #35736124L | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 24, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF EMERGENCY LIGHTING FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-542. NOTED: AT (4TH FL)LIBRARY RM 419 NOT INSTALLED/PROVIDED W #35736128Z | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 24, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORSPER BC 1006.1; 27-381. NOTED: AT (1ST FL)CAFETERIA (BASEMENT)AUDITORIUM EMERGENCY LIGHTS NOT WO #35736129K | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 24, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (3RD FL)HALLWAY SMOKE DOOR NEAR RM 319 (2ND FL)STAIR A (1ST FL)STAIR B, MAIN ENTRANCE, ALL DOORS ARE IN DISREPAIR/RACKED WHEN TESTED. REMEDY: REP #35736127R | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 24, 2026 | Construction CLASS - 2 REISSUE ECB #35725232P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT (ROOF)2ND STORY/ABOVE GYM PARAPET NOT INSTALLED/PROVIDED WITHOUT RAILINGS. REMEDY: REPAIR AND/OR REPLACE. #35736126P | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 24, 2026 | Construction CLASS - 2 REISSUED ECB#35725235K EXIT DOOR NOT SELF CLOSING.NOTED:AT ROOF BULKHEAD/STAIR A 1ST FL EXIT 3,5,1 ARE DOOR ARE IN DISREPAIR/NOT CLOSING WHEN TESTED.REM:REPAIR/REPLACE DOOR. #35736123J | Aug 20, 2026 POP/IN-VIO | $0 |
| Jul 24, 2026 | Construction CLASS - 2 REISSUE ECB #35725233R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. AT EXIT 1 EXTERIOR STAIRS/RAMPS OF CEMENT WITH CRACKS AND LOOSE RAILS. REMEDY: REPAIR AND/OR REPLACE. #35736125N | Aug 14, 2026 POP/IN-VIO | $0 |
| Sep 8, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT ROOF LEVEL BULKHEAD STAIR C WATER DAMAGE/STAINING W/SPALLING PLASTER/PAINT TO CEILING/WALLS. REMEDY: REPAIR AND/OR REPLACE. #35725234Z | Oct 3, 2025 POP/IN-VIO | $0 |
| Sep 8, 2025 | Construction CLASS - 2 REISSUE ECB #35682907R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT EXP 1 STAIRS/RAMPS AND RETAINING WALL CRACKS STUCCO/CEMENT RAILING/LOOSE W/MISSING BRICKS. REMEDY: REPAIR AND/OR REPLACE. #35725233R | Oct 3, 2025 POP/IN-VIO | $0 |
| Sep 8, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED: AT(3RD FL) STAIR A, SMOKE DOOR NEARRM 319(1ST FL) EXIT 1, 3 DOORS ARE IN DISREPAIR/NOT CLOSING WHEN TESTED. REMEDY: REPAIR/REPLACE DOORS. #35725235K | Oct 3, 2025 POP/IN-VIO | $0 |
| Sep 8, 2025 | Construction CLASS - 2 REISSUE ECB #35682908Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT ROOF LEVEL OVER GYM WITH NO PARAPET RAILING INSTALLED/PROVIDED. REMEDY: REPAIR AND/OR REPLACE. #35725232P | Oct 3, 2025 POP/IN-VIO | $0 |
| Aug 19, 2024 | Construction CLASS - 2 REISSUE#35663597R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ROOF LEVEL OVER GYM NO RAILING INSTALLED.REM:REPAIR AND/OR REPLACE. #35682908Z | Oct 24, 2024 POP/IN-VIO | $0 |
| Jul 25, 2023 | Construction CLASS - 2 REISSUE #35657839S FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED AT ROOF LEVEL OF GYM, NO RAILING PRESENT CAUSING A SAFETY AND FALL HAZARD. REMEDY: REPAIR AND/OR REPLACE #35663597R | Nov 2, 2023 POP/IN-VIO | $0 |
| Jun 6, 2022 | Construction CLASS - 2 REISSUE #35473204J DATE:5/28/2020 FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCES.AT TIME OF INSPECTION OBSERVED AT ROOF LEVEL OVER GYMNASIUM BULKHEAD ACCESS TO ROOF HOWEVER NO PARAPET WALL OR SAFETY RAILI #35657839J | Sep 15, 2022 POP/IN-VIO | $0 |
| May 28, 2020 | Construction CLASS - 2 REISSUE #35433784Z FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER NOTE DURING INSPECTION OBSERVED AT ROOF LEVEL OVER GYMNASIUM THERE IS BULKHEAD ACCESS TO ROOF HOWEVER THERE IS NO PARAPET WALL OR SAFETY #35473204J | Oct 1, 2020 POP/IN-VIO | $0 |
| Jun 27, 2019 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NOTED: OBSERVEDROOF GYMNASUIM WHICH IS OVER 17FT HIGH FROM GRAFE AND WITH BULKHEAD ACCESS NO PARAPET WALL OR SAFETY RAILING IN PLACE. RE-ISSUE #35329302R #35433784Z | Sep 26, 2019 POP/IN-VIO | $0 |
| Jun 12, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN BLG IN CODE COMPLIANT MANNER NO PARAPET RAILING OR PROTECTION FROM FALL AT ROOF ABOVE GYM WITH BULKHAD ACCESS. RMDY: REPAIR. #35329302R | Nov 15, 2018 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 7, 2020 | ELEVATOR #9028/666947 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #09193 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #10572 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Jul 24, 2026 | ECB | Construction: REISSUE ECB #35725234Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT (ROOF)BULKHEAD/STAIR C (4TH FL)CLASS ROOMS 420, 422 AND LIBRARY RM 419 WATER/DAMAGE TO WALLS/CEILINGS WITH STAINING AND SP | Open |
| Jul 24, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF EMERGENCY LIGHTING FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-542. NOTED: AT (4TH FL)LIBRARY RM 419 NOT INSTALLED/PROVIDED W | Open |
| Jul 24, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORSPER BC 1006.1; 27-381. NOTED: AT (1ST FL)CAFETERIA (BASEMENT)AUDITORIUM EMERGENCY LIGHTS NOT WO | Open |
| Jul 24, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (3RD FL)HALLWAY SMOKE DOOR NEAR RM 319 (2ND FL)STAIR A (1ST FL)STAIR B, MAIN ENTRANCE, ALL DOORS ARE IN DISREPAIR/RACKED WHEN TESTED. REMEDY: REP | Open |
| Jul 24, 2026 | ECB | Construction: REISSUE ECB #35725232P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT (ROOF)2ND STORY/ABOVE GYM PARAPET NOT INSTALLED/PROVIDED WITHOUT RAILINGS. REMEDY: REPAIR AND/OR REPLACE. | Open |
| Jul 24, 2026 | ECB | Construction: REISSUED ECB#35725235K EXIT DOOR NOT SELF CLOSING.NOTED:AT ROOF BULKHEAD/STAIR A 1ST FL EXIT 3,5,1 ARE DOOR ARE IN DISREPAIR/NOT CLOSING WHEN TESTED.REM:REPAIR/REPLACE DOOR. | Open |
| Jul 24, 2026 | ECB | Construction: REISSUE ECB #35725233R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. AT EXIT 1 EXTERIOR STAIRS/RAMPS OF CEMENT WITH CRACKS AND LOOSE RAILS. REMEDY: REPAIR AND/OR REPLACE. | Open |