6 floors · 47 apartments · 40,937 sq ft · built 2008 · class R4 · owner of record: Bsp Spencer Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 40,937 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2026 | Parking Structures FTF-PS-INITL Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Apr 5, 2019 | Elevators EVCAT1 | Active |
| Sep 15, 2017 | Elevators EVCAT1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 15, 2026 | B | Apt APT3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 19, 2026 |
| Oct 15, 2026 | B | Apt APT3B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE FOYER LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 19, 2026 |
| Oct 13, 2026 | B | Apt APT3B · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 17, 2026 |
| Oct 13, 2026 | A | Apt APT3B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT OBSERVED AT FLOOR IN THE 5th ROOM FROM NORTH LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 16, 2027 |
| Oct 13, 2026 | B | Apt APT3B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 17, 2026 |
| Oct 13, 2026 | B | Apt APT3B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HARD WOOD FLOOR IN THE 5th ROOM FROM NORTH LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 17, 2026 |
| Oct 13, 2026 | B | Apt APT3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 5th ROOM FROM NORTH LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 17, 2026 |
| Oct 13, 2026 | B | Apt APT3B · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 17, 2026 |
| Mar 31, 2023 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING, IN NORTH SECTION AT CELLAR | May 5, 2023 |
| Mar 31, 2023 | A | Apt 2I · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES SURFACE, CAULKING, AND GROUTS JOINTS OF VISIBLE MOLD AT EAST AND SOUTH WALLS AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 4, 2023 |
| Mar 31, 2023 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING ,IN NORTH SECTION AT CELLAR | May 5, 2023 |
| Sep 27, 2018 | B | Apt 4H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ..NORTH AND SOUTH JAMBS AT WINDOW IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4H, 4th STORY, APARTMENT AT WEST | Nov 1, 2018 |
| Sep 27, 2018 | B | Apt 4H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ..NORTH AND SOUTH JAMBS AT WINDOW IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4H, 4th STORY, APARTMENT AT WEST | Nov 1, 2018 |
| Sep 26, 2018 | B | Apt 4H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ..HEADER AT SOUTH WINDOW IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 31, 2018 |
| Sep 26, 2018 | B | Apt 4H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ..THE CEILING, WEST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 31, 2018 |
| May 15, 2018 | A | Apt 4H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR NEAR THE SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 18, 2018 |
| Feb 27, 2018 | B | Apt 2I · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ..THE CEILING IN THE CLIOSET IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 3, 2018 |
| Jun 22, 2017 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED, 1st STORY | Sep 25, 2017 |
| May 10, 2010 | A | Apt 5B · § 27-2005 ADM CODE REFIT TERRACE DOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 13, 2010 |
| Jul 9, 2009 | A | Apt 1F · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE EXHAUST VENT IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 12, 2009 |
| Jul 9, 2009 | A | Apt 1F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 12, 2009 |
| Jul 9, 2009 | A | Apt 1F · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASHBASIN IN THE BATHROOM AT BASEMENT LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 12, 2009 |
| May 19, 2009 | A | Apt 1F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Aug 22, 2009 |
| Feb 26, 2009 | A | Apt 1F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 1, 2009 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 15, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 15, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE FOYER LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 13, 2026 | HPD B | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 13, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT OBSERVED AT FLOOR IN THE 5th ROOM FROM NORTH LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 13, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 13, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HARD WOOD FLOOR IN THE 5th ROOM FROM NORTH LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 13, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 5th ROOM FROM NORTH LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 13, 2026 | HPD B | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT APT3B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Sep 23, 2026 | DOB Safety | Parking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 4:39 AM ET. BBL 3017627505.