4 floors · 8 apartments · 5,800 sq ft · built 1928 · class C1 · owner of record: 192 Greenpoint Avenue Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 796 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-04 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 23, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDERS TO OBTAIN WORK PERMITS AS PER VIOLATION #39160255H. NO PERMITS ISSUED FOR THE DEMOLITION AND INSTALLATION OF PARTITION WALLS ON PROPERTY., COMPLY #39205298Y | Dec 2, 2026 PENDING | $2,500 |
| Sep 11, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED, NEW PARTITIONS BEING CREATED AND DEMOLISHED OF INTERIOR SPACE. ECB ISSUED FOR CONSTRUCTION WORK WITHOUT A PERMIT., OBTAIN PERMIT #39160255H | Apr 17, 2026 ADMIT/IN-VIO | $0 |
| Sep 11, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED, CONSTRUCTION WORK FAILING TO SAFEGUARD PUBLIC. STRUCK BY HAZARDOUS CONDITIONS ARE CREATED BY IMPROPER PUMPJACK SCAFFOLDING ACROSS SIDEWALK. ECB ISSUED FOR ENDANGERING THE PUBLIC. #39160112K | Mar 15, 2027 DEFAULT | $12,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 16, 2024 | A | Apt 1L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING INSTALLED IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, APARTMENT AT SOUTH | Jan 19, 2025 |
| Jan 16, 2018 | B | Apt 1R · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... 4 SQ. FT. AT WEST AND SOUTH WALLS IN THE 3rd BATHROOM FROM NORTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 20, 2018 |
| Jan 16, 2018 | B | Apt 1R · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 20, 2018 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 23, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDERS TO OBTAIN WORK PERMITS AS PER VIOLATION #39160255H. NO PERMITS ISSUED FOR THE DEMOLITION AND INSTALLATION OF PARTITION WALLS ON PROPERTY., COMPLY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 8:37 AM ET. BBL 3025750008.