2 floors · 2 apartments · 2,562 sq ft · built 1925 · class S2 · owner of record: Villapex Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 426 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-04 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 29, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39083337P ISSUED ON 04/10/2023, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT #37032866H | Jun 10, 2025 IN VIOLATION | $0 |
| May 25, 1993 | Construction Hazardous FAILURE TO MAINTAIN IN BASEMENT OF ABOVE ADDRESS NO FIRE RATING PROVIDED ENTIRE BASEMENT AREA EXPOSED FLOOR JOISTS AND WOOD FLOORING VIOL 34031873M 101289C12Q1 WRITTEN ON 101289 ON THIS DATE OF INSPECTION #34092428N | Jun 22, 1993 WRITTEN OFF | $0 |
| May 25, 1993 | Construction Hazardous WORK WITHOUT PERMIT CONSTRUCTION OF A BATH RM AT CELLAR AND WALK IN REFRIGERATOR BOX AT 1ST FL REAR PRIOR VIOL 34031873M WAS WRITTEN ON 101289 BUT HASNT BEEN COMPLIED REMEDY OBTAIN NECESSARY PERMIT OR RESTORE #34092430M | Jun 22, 1993 WRITTEN OFF | $0 |
| Mar 18, 1992 | Construction Non-Hazardous WORK WITHOUT A PERMIT (NOTE) BATHROOM INSTALLED IN CELLAR. WALK IN BOXAPPROX 15' X 12' INSTALLED ON 1ST FLOOR. REMEDY: OBTAIN A PERMIT OR RESTORE TO FORMER LEAGAL USE. #34066535J | Jun 30, 1992 WRITTEN OFF | $0 |
| Aug 15, 1990 | Construction Non-Hazardous WORK WITHOUT A PERMIT WORK NOTED:CONSTRUCTED A BATHROOM IN CELLAR REAROF BUILDING REMEDY:REMOVE ILLEGAL BATHROOM WORK WITHOUT A PERMIT WORK NOTED. CONSTRUCTED A WALK-IN BOX APPROX.15'BY12' 1ST STY REAR. REMEDY: #34042791M | Jan 22, 1991 WRITTEN OFF | $0 |
| Oct 12, 1989 | Construction Hazardous WORK WITHOUT A PERMIT WORK NOTED BATHROOM IN CELLAR REAR OF BUILDING REMEDY REMOVE ILLEGAL BTHRM. FAILURE TO MAINTAIN DEFECT IS BOILER RM IN CELLAR REAR OF BLDG HAS NO ENCLOSURE. REMEDY DO ALL NECESSARY WORK TO #34031873M | Dec 12, 1989 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #12629 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #24010 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #23128 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #23173 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #22653 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #23920 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #25440 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #31056 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #29881 | DOB VIOLATION - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #30138 | DOB VIOLATION - ACTIVE |
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #30022 | DOB VIOLATION - ACTIVE |
| May 4, 1998 | LOCAL LAW 62/91 - BOILERS #31962 | DOB VIOLATION - ACTIVE |
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #272248 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #39116 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #43702 | DOB VIOLATION - ACTIVE |
| Jun 7, 1994 | LOCAL LAW 62/91 - BOILERS #04406 | DOB VIOLATION - ACTIVE |
| Jun 28, 1993 | LOCAL LAW 62/91 - BOILERS #13047 | DOB VIOLATION - ACTIVE |
| Mar 18, 1992 | CONSTRUCTION #121CG04VW | VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Jun 7, 1994 | Boiler LL6291 | Active |
| Jun 28, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 16, 2025 | B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AND WEST WALL AT PUBLIC HALL, 2nd STORY | Feb 20, 2025 |
| Jan 16, 2025 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AND WEST WALL AT PUBLIC HALL, 2nd STORY | Feb 20, 2025 |
| Aug 1, 2023 | B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE SCUTTLE LADDER ON EAST WALL AT PUBLIC HALL, 2nd STORY | Sep 5, 2023 |
| May 1, 2023 | C | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR FIRE RETARDANT MATERIAL OF APPROXIMATELY 2 SQ FEET AT WEST WALL AND AT CEILING 2ND STORY AT PUBLIC HALL | May 7, 2023 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 2:49 PM ET. BBL 4110630054.