3 floors · 20,667 sq ft · built 1905 · class Y2 · owner of record: Nyc Police Department
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-15 (Pre-filing). Agency page | Dec 31, 2026 in 66 days | 1 of 1 without an accepted 2026 report yet |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 431 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 25, 2018 | Construction CLASS - 3 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. OBSERVED: THE METAL FENCE OF 3 STORY BLDG (PRECINCT# 62) @ EXP#2 ON DRIVEWAY BROKEN & HAS MISSING SECTION. LEANED TO NEIGHBORING PROPERTY(#1915). REM: REPAIR & #35315290L | Sep 17, 2018 POP/IN-VIO | $0 |
| Aug 12, 2009 | Boilers CLASS - 2 B254,36. #32066882L | Oct 5, 2009 WRITTEN OFF | $0 |
| Dec 10, 2008 | Boilers CLASS - 3 B354,16,21C,34B,38,50B,15,21A,34A,36,50A,50C,50D,50E. 50A UNDERSIZED PRESSURETRULL MANIFOLD 50B OPEN CONTAINERS OF FUEL 50C BACKFLOW NOT PIPED DOWN 50D REMOVE ALL STORAGE 50E REMOVE ALL FLAMMABLE. REFUSED PICTU #32065186N | Feb 2, 2009 WRITTEN OFF | $0 |
| Dec 10, 2008 | Construction CLASS - 1 B101. INSTALLATION OF NEW BOILER AND BURNER W/O PLANS OR PERMITS ON FILE W/ THE NYC DOB. PCT C.O REFF ACTING. #32065185L | Feb 2, 2009 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #14286 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21595 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 10:14 AM ET. BBL 3064060045.