Queens · Block 10447 · Lot 7 · 11423

191-02 90 Avenue

4 floors · 110,000 sq ft · built 1930 · class W1 · owner of record: Nyc Department Of Education

49open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
60dto Annual boiler inspection (2 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-16 (Accepted). Agency page

Dec 31, 2026
in 60 days
2 of 2 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 110,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 181 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 181 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 425 days
Next cycle year 2027
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 10447). Agency page

Dec 31, 2027
in 425 days
Next due 2027

Open violations

ECB / OATH (12)
IssuedViolationHearingBalance
May 29, 2026Construction CLASS - 2
RE-ISSUE #35725557N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT VESTIBULE ENTRANCE AREA, THERE IS SHEETROCK MISSING OFF WALLS. REMEDY: REPAIR AND/OR REPLACE.
#35731761L
Jun 18, 2026
POP/IN-VIO
$0
May 29, 2026Construction CLASS - 2
RE-ISSUE #35725555J. ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALIDCERTIFICATE OF OCCUPANCY AS PER 28-118.3.1-28-119.3.2. NOTED: C OF O #402889718 EXPIRED 5/28/2023, NO UPDATED C OF O IS ON RECORD. REMEDY: O
#35731763P
Jun 18, 2026
POP/IN-VIO
$0
May 29, 2026Construction CLASS - 2
RE-ISSUE #35725556L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FPSC INTERIOR INTERIOR DOORS DO NOT SELF-CLOSE PROPERLY AT 3RD FLOOR-STAIRCASE "F". 2ND FLR-STAIRCASE "D", "E". CLASSROOM DOORS
#35731762N
Jun 18, 2026
POP/IN-VIO
$0
Sep 26, 2025Construction CLASS - 2
REISSUE: 35692493P-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: 3RD FLOOR 329, 1FL CORRIDOR 123, 125, DOORS NOT CLOSING PROPERLY. REMEDY: COMPLY WITH CODE.
#35725556L
Oct 24, 2025
POP/IN-VIO
$0
Sep 26, 2025Construction CLASS - 2
REISSUE: 35692494R-ALTERED/CHANGED BUILDING. OCCUPIED WITH VALID CERTIFICATION OF OCCUPANCY AS PER 28-118.1; 28-118.3.2. NOTED: TEMP CERT OFOCCUPANCY TEMP C OF O #4028897. REMEDY: COMPLY WITH CODE.
#35725555J
Oct 24, 2025
POP/IN-VIO
$0
Sep 26, 2025Construction CLASS - 2
REISSUE: 35692491L-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ENTRANCE #9 VESTIBULE AREA MISSING SHEETROCK, FLOOR IS A TRIPPING HAZARD. REMEDY: COMPLY WITH CODE.
#35725557N
Oct 24, 2025
POP/IN-VIO
$0
Oct 17, 2024Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT EXIT 9 VESTIBULE AREA MISSING SHEETROCK WALLS AND FLOORING TRIP HAZARD. REMEDY: REPAIR AND/OR REPLACE.
#35692491L
Dec 3, 2024
POP/IN-VIO
$0
Oct 17, 2024Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT 3 FLOOR ROOM 329, 1FL. CORRIDOR BY 123 AND 125 DOORS ARE NOT CLOSING CORRECTLY. REMEDY: REPAIR AND/OR REPLACE.
#35692493P
Dec 3, 2024
POP/IN-VIO
$0
Oct 17, 2024Construction CLASS - 2
REISSUE #35672314M. ALTERED/CHANGE BUILDING OCCUPIED WITHOUT VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.1; 28-118.3.2. NOTED: TEMPORARY CERTIFICATE OF OCCUPANCY ISSUED BY BUILDING DEPT #4028897.8T022 EXPIRED
#35692494R
Dec 3, 2024
POP/IN-VIO
$0
May 26, 2023Construction CLASS - 2
REISSUE#35654915Z ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.1;28-118.3.2.NOTED:TEMPORARY CERTIFICATE OF OCCUPANCY ISSUED BY BUILDING DEPT#402889718TO22 EXPIRED ON
#35672314M
Sep 19, 2023
POP/IN-VIO
$0
May 27, 2022Construction CLASS - 2
REISSUE#35561039P ALTERED/CHANGED OCCUPIED WITHOUT A VALID CERTIFICATEOF OCCUPANCY AS PER 28-118.3.1-28-118.3.2.NOTED:OBSERVED BUIDLING WAS ALTERED UNDER ALT.TYPE 1 PERMIT#402889718-ALT.1 THAT HAS NOT BEEN SIGN
#35654915Z
Sep 13, 2022
POP/IN-VIO
$0
May 18, 2021Construction CLASS - 2
ALTERED/CHANGED BLDG OCCUPIED W/O A VALID CERT OF OCCUPANCY AS PER 28-118.3.1;28-118.3.2. NOTED: BLDG ALTERED UNDER APP#402889718 & OCCUPIED AS A PUBLIC SCHOOL UNDER & EXPIRED TEMPORARY CERT OF OCCUPANCY T.C.O.
#35561039P
Sep 14, 2021
POP/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (37)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 1:17 PM ET. BBL 4104470007.

Look up another building