3 floors · 3 apartments · 4,530 sq ft · built 2008 · class C0 · owner of record: Haque, Tanzirul
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 43 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 59 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 408 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 6, 2016 | Construction CLASS - 2 ALTERED/CHANGED BLDG OCCUPIED W/O VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3. NOTED AT TIME OF INSPECTION. JOB #410003687 NEW BUILDINGAPPLICATION APPROVED ON 1110912007 NOT SIGNED OFF.BLDG 1ST FLR 1001 OC #35198135L | Oct 25, 2016 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 12, 2008 | CONSTRUCTION #1206SL | DOB VIOLATION - ACTIVE |
| May 12, 2008 | CONSTRUCTION #1205SL | DOB VIOLATION - ACTIVE |
| Jan 29, 2008 | CONSTRUCTION STOP ALL WORK FAILURE TO PROVIDE PROTECTION AT SIDE OF EXCAVATION NOTED: AT TIME OF INSPECTION AN EXCAVATION SITE A SHEER CUT OF APPROX 8 TO 10' DEEP AND NO PROTECTION PROVIDED NO SHEETING AND SHORING AT SIDE AND REAR YARDS FOUNDATION WALLS AT REAR JOB#410003687 REMEDY: STOP ALL WORK PROVIDE PROTECT #EX03NDC | DOB VIOLATION - ACTIVE |
| Jan 29, 2008 | CONSTRUCTION STOP ALL WORK FAILURE TO PROVIDE PROTECTION A SIDE OF EXCAVATION NOTED AT TIME OF INSPECTION AN EXCAVATION SITE A SHEER CUT OF APPROX 8' TO 10' DEEP AND NO PROTECTION PROVIDED NO SHEETING AND SHORING AT SIDE AND BACK YARD FOUNDATION WALLS IN THE REAR YARD PARTIAL JOB#410003696 REMEDY: STOP ALL WORK #EX02NDC | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 9:59 PM ET. BBL 4108170007.