Brooklyn · Block 2482 · Lot 9 · 11222

19 Clay Street

class V1 · owner of record: Clay Properties Llc

2open violations
$50,950ECB/OATH penalties owed
0HPD class C (immediately hazardous)
—no dated deadlines found

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

We couldn't find building attributes for this lot, so no deadlines are listed.

Open violations

ECB / OATH (11) · $50,950 owed
IssuedViolationHearingBalance
Sep 2, 2026Construction CLASS - 2
WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, OBSERVED MECHANICAL WORK BEING PERFORMED WITHOUT MS PW2 FILED ON DOB SYSTEM., OBTAIN ALL PERMITS; PLEASE SUBMIT PERMIT TO TO ENERGYCODEINSPECTIONS@BUILDINGS.NYC.GOV
#39202877P
Nov 18, 2026
PENDING
$1,250
Aug 5, 2026Unknown CLASS - 1
AT TIME OF INSPECTION OBSERVED: ACTIVE JOB SITE DECK FORM WORK/REBAR IN PROGRESS AT 9TH FL. LEVEL 90 FEET APPROX. IN HEIGHT STANDPIPE NOT IN STATE OF READINESS, CONTRARY TO BC 3303.8 CREATING A POTENTIAL FIRE H
#39557594H
May 21, 2027
$5,000
Aug 5, 2026Unknown CLASS - 1
AT TIME OF INSPECTION OBSERVED: FORM WOOD DECK WORK AND REBAR DELIVERY IN PROGRESS AT 9TH FL. LEVEL MISSING ROOF/OHP AT CORNER EXPO# 1-4 CREATING AN UNSAFE HAZARDOUS CONDITION FOR ADJOINING OCCUPIED BUILDING, M
#39557593X
May 21, 2027
$10,000
Aug 5, 2026Unknown CLASS - 1
AT TIME OF INSPECTION OBSERVED: ACTIVE JOB SITE 9TH FLOOR WORK/REBAR DELIVERY TO REACH 90 FEET HEIGHT APPROX. IN PROGRESS SUPPORTED SCAFFOLD INSTALLED AS AN ALTERNATIVE AT 7TH FL. CONTRARY TO BC 3308.6.1.4.1 CR
#39557592Y
May 21, 2027
$5,000
Aug 5, 2026Unknown CLASS - 1
AT TIME OF INSPECTION OBSERVED: CRANE OPERATIONS HOISTING MATERIAL AT 9TH FL. INADEQUATE STAGE WORK ZONE EXPO# 1 CONCRETE WASH OUT BOX PROPER ENCLOSURE NO 4' CONTINUES BARRIER AND WIRE SCREEN THE SPACE BETWEEN
#39557595J
May 21, 2027
$5,000
Jun 16, 2026Construction CLASS - 2
AT TIME OF INSPECTION OBSERVED: ACTIVE JOB SITE FORM WORK AT 2ND. FL. LEVEL. MISSING PORTION OF SIDEWALK SHED AT CORNER EXPO# 1-2 NOT EXTENDED 20 FEET AS PER CODE TO PROTECT ADJOINING OCCUPIED BUILDING. CREATIN
#39555621P
Apr 12, 2027
$2,400
Jun 16, 2026Unknown CLASS - 2
RESPONDING TO AN INCIDENT, WHERE YUNMEE HAN ENVIRONMENTAL ENG. GOT HIT BY WRAPPING WOOD SHEET 2'X3' APPROX. AROUND 9:30 AM 6/26/26 WHILE COLLECTING WATER SAMPLES INSPECTION REVEALED: CONTRACTOR FAILURE TO NOTIF
#39555620N
Apr 12, 2027
$5,000
Jun 16, 2026Construction CLASS - 2
RESPONDING TO AN INCIDENT, WHERE YUNMEE HAN ENVIRONMENTAL ENGINEER GOT HIT BY WRAPPING WOOD SHEET 2'X3' APPROX. WHILE COLLECTING WATER SAMPLES INSPECTION REVEALED: GC FAILURE TO INSTITUTE/MAINTAIN SAFETY MEAS
#39555619X
Apr 12, 2027
$5,000
Mar 27, 2026Construction CLASS - 1
RESPONDING TO AN INCIDENT WHERE A WORKER SUSTAINED A LACERATION TO HER LEFT ARM WHILE DISCONNECTING A HOSE FROM A FIRE HYDRANT ACROSS STREET FROM THE JOB SITE AT EXP #3 ON MARCH 26, 2026, APPROXIMATELY 6 PM. TH
#39552314L
Dec 3, 2026
$5,000
Feb 5, 2026Unknown CLASS - 2
I OBSERVED FAILURE TO IMPLEMENT 3310.4 SITE SAFETY MONITORING PROGRAM. NO SS DESIGNATED UNDER PW2. FOR A PROJECT THAT REQUIRES A SITE SAFETY PLAN, THE GENERAL CONTRACTOR SHALL ENACT AND MAINTAIN A SITE SAFETY M
#39550003P
Nov 23, 2026
$2,500
Feb 5, 2026Construction CLASS - 1
UPON INSPECTION I OBSERVED A TEMP STRUCTURE INSTALLED FOR CONSTRUCTION OPERATIONS AT EXPOS 1 APPROX. 53FT IN HEIGHT, APPROX. 8FT AWAY FROM THE PEDESTRIAN SIDEWALK WITH NO SIDEWALK SHED PROVIDED CONTRARY TO CODE
#39550015M
Nov 23, 2026
$4,800
DOB (1)
IssuedViolationStatus
Dec 7, 2000CONSTRUCTION
HAZ
#01HD02
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 2, 2026ECBConstruction: WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, OBSERVED MECHANICAL WORK BEING PERFORMED WITHOUT MS PW2 FILED ON DOB SYSTEM., OBTAIN ALL PERMITS; PLEASE SUBMIT PERMIT TO TO ENERGYCODEINSPECTIONS@BUILDINGS.NYC.GOVOpen
Aug 5, 2026ECBUnknown: AT TIME OF INSPECTION OBSERVED: ACTIVE JOB SITE DECK FORM WORK/REBAR IN PROGRESS AT 9TH FL. LEVEL 90 FEET APPROX. IN HEIGHT STANDPIPE NOT IN STATE OF READINESS, CONTRARY TO BC 3303.8 CREATING A POTENTIAL FIRE HClosed
Aug 5, 2026ECBUnknown: AT TIME OF INSPECTION OBSERVED: FORM WOOD DECK WORK AND REBAR DELIVERY IN PROGRESS AT 9TH FL. LEVEL MISSING ROOF/OHP AT CORNER EXPO# 1-4 CREATING AN UNSAFE HAZARDOUS CONDITION FOR ADJOINING OCCUPIED BUILDING, MClosed
Aug 5, 2026ECBUnknown: AT TIME OF INSPECTION OBSERVED: ACTIVE JOB SITE 9TH FLOOR WORK/REBAR DELIVERY TO REACH 90 FEET HEIGHT APPROX. IN PROGRESS SUPPORTED SCAFFOLD INSTALLED AS AN ALTERNATIVE AT 7TH FL. CONTRARY TO BC 3308.6.1.4.1 CRClosed
Aug 5, 2026ECBUnknown: AT TIME OF INSPECTION OBSERVED: CRANE OPERATIONS HOISTING MATERIAL AT 9TH FL. INADEQUATE STAGE WORK ZONE EXPO# 1 CONCRETE WASH OUT BOX PROPER ENCLOSURE NO 4' CONTINUES BARRIER AND WIRE SCREEN THE SPACE BETWEENClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 12:46 AM ET. BBL 3024820009.