17 floors · 256 apartments · 144,202 sq ft · built 1966 · class D3 · owner of record: Israel Senior Cit Hsg
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual boiler inspection (8 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-19 (Accepted). Agency page | Dec 31, 2026 in 47 days | 8 of 8 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 144,202 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $180,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 464 days | No Cycle 10 report on record yet |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 15810). Agency page | Dec 31, 2030 in 1508 days | Next due 2030 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 19, 2024 | Construction CLASS - 1 FAILURE TO TAKE/PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT DESIGNATED UNSAFE BUILDING FACADE AS PER TECHNICAL REPORT(UNSAFE-911776-9B-001). NOTE:-AT THE TIME OF INSPECTION OBSERVED NO ANY SAFETY MEASURE #35685262M | Jan 6, 2026 IN VIOLATION | $0 |
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #911776. REMEDY: SUBMIT ACCEPTABLE REQU #37028199L | Sep 10, 2024 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 7, 2025 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS #00058 | DOB VIOLATION - ACTIVE |
| Jan 7, 2025 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #911990 | DOB VIOLATION - ACTIVE |
| Sep 18, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00067 | DOB VIOLATION - ACTIVE |
| Jul 19, 2024 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE AT ALL EXPOSURES, SPALLIN CONCRETE & SPALLING BRICK. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES TO SECURE/PROTECT THE PUBLIC AND REMOVE/REPAIR ANY LOOSE MATERIALS AS PER IRCNY103-04 #LLFA01AB | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #00644 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| May 7, 2025 | Facades FISPFCS CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Jan 7, 2025 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Sep 18, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 26, 2026 | B | Apt 11J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE AT CABINET AT SINK AT WEST WALL IN THE KITCHEN LOCATED AT APT 11J, 11th STORY, 6th APARTMENT FROM NORTH AT EAST | Nov 30, 2026 |
| Oct 26, 2026 | A | Apt 11J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 11J, 11th STORY, 6th APARTMENT FROM NORTH AT EAST | Jan 29, 2027 |
| Oct 26, 2026 | B | Apt 11J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 11J, 11th STORY, 6th APARTMENT FROM NORTH AT EAST | Nov 30, 2026 |
| Oct 26, 2026 | A | Apt 11J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED AT WINDOW SILL AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 11J, 11th STORY, 6th APARTMENT FROM NORTH AT EAST | Jan 29, 2027 |
| Oct 26, 2026 | B | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SLOP SINK AT WEST WALL AT COMPACTOR CLOSET, 11th STORY | Nov 30, 2026 |
| Oct 29, 2025 | A | Apt 3A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A-J'', AT NORTH | Feb 1, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 26, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE AT CABINET AT SINK AT WEST WALL IN THE KITCHEN LOCATED AT APT 11J, 11th STORY, 6th APARTMENT FROM NORTH AT EAST | Open |
| Oct 26, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 11J, 11th STORY, 6th APARTMENT FROM NORTH AT EAST | Open |
| Oct 26, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 11J, 11th STORY, 6th APARTMENT FROM NORTH AT EAST | Open |
| Oct 26, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED AT WINDOW SILL AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 11J, 11th STORY, 6th APARTMENT FROM NORTH AT EAST | Open |
| Oct 26, 2026 | HPD B | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SLOP SINK AT WEST WALL AT COMPACTOR CLOSET, 11th STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 3:56 AM ET. BBL 4158100025.