Queens · Block 15636 · Lot 1 · 11691

19-04 Plainview Avenue

10 floors · 119,788 sq ft · built 1982 · class I1 · owner of record: Church Charity Foundation Of Li

72open violations
$28,125ECB/OATH penalties owed
0HPD class C (immediately hazardous)
65dto Energy audit and retro-commissioning (2026)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Energy audit and retro-commissioning (2026) Likely applies
Local Law 87 · Calendar year 2026
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 15636). Agency page

Dec 31, 2026
in 65 days
Due this year
Annual boiler inspection (10 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-17 (Inspection Supervisor Review). Agency page

Dec 31, 2026
in 65 days
8 of 10 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 119,788 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 186 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 186 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 430 days
Next cycle year 2027
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $4,282,560 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SAFE (2026-09-21)

Open violations

ECB / OATH (14) · $28,125 owed
IssuedViolationHearingBalance
Jul 13, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING FACADE WALL"S" AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION I OBSERVED AT EX #1, NORTH ELEVATION, CRACKED/TERRA-COTTA STONE BETWEEN 1ST-2ND FLOOR. AT EX #2, EAST ELEVATION, CR
#35730071J
Sep 22, 2026
PENDING
$5,000
Apr 20, 2026Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8A, 9A, 10A REPORT INDICATINGCORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #1011766. AGG1: PRIOR NOV 37026454K UND
#37036652K
Oct 27, 2026
PENDING
$3,125
Dec 8, 2025Construction CLASS - 2
AT THE TIME OF MY INSPECTION I OBSERVED THAT THE SIDE WALK SHED INSTALLED PERMIT HAD EXPIRED.
#39547723X
Feb 17, 2026
DEFAULT
$6,250
Jul 24, 2025Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTES:AT THE TIME OF INSPECTION OBSERVE STEB CRACK AS EXPOSURE 2 SOUTH ELEVATION.REM:MAINTAIN EXTERIOR FACADE TAKE SAFETY MEASURES AND REPAIR DAMAG
#35694083L
Sep 30, 2025
IN VIOLATION
$5,000
Jun 24, 2025Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTED:AT THE TIME INSPECTION OBSERVED: STEP CRACK AT EXPOSURE 2 SOUTH ELEVATION(6TH FLOOR). REMEDY: MAINTAIN EXTERIOR FACADE. TAKE SAFETY MEASURES
#35694077P
Sep 2, 2025
IN VIOLATION
$5,000
Jan 8, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS#39053642Y ISSUED ON 1/3/2022,AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2).AN ACCEPTABLE CERTIFICAT
#37032517J
Feb 24, 2026
IN VIOLATION
$1,250
Jan 8, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS#39053644H ISSUED ON 1/3/2022,AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2).AN ACCEPTABLE CERTIFICAT
#37032519N
Feb 24, 2026
IN VIOLATION
$1,250
Jan 8, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS#39053643X ISSUED ON 1/3/2022,AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2).AN ACCEPTABLE CERTIFICAT
#37032518L
Feb 24, 2026
IN VIOLATION
$1,250
Jan 16, 2024Local Law CLASS - 2
FAILURE TO FILE ACCPETABLE AMENDED CYCLE 8A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #811766. REMEDY: FILE ACCEPTABLE REPORT.
#37026454K
May 21, 2024
DEFAULT
$0
Dec 2, 2022Local Law CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #911766.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE
#37024001Z
Aug 22, 2023
ADMIT/IN-VIO
$0
Jan 3, 2022Boilers CLASS - 2
ALL BOILERS OVER 8' TALL NEED LADDERS AND PLATFORMS CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION
#39053644H
Dec 6, 2022
STIPULATION/IN-VIO
$0
Jan 3, 2022Boilers CLASS - 2
ALL BOILERS OVER 8' TALL NEED LADDERS AND PLATFORMS CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION
#39053643X
Dec 6, 2022
STIPULATION/IN-VIO
$0
Jan 3, 2022Boilers CLASS - 2
ALL BOILERS OVER 8' TALL NEED LADDERS AND PLATFORMS CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION
#39053642Y
Dec 6, 2022
STIPULATION/IN-VIO
$0
Sep 21, 2020Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.NOTE:AT TIME OF INSPECTION OBSERVED THAT RESPONDENT DID NOT FILE CERTIFICATE OF CORRECTION FO
#35537736K
Dec 15, 2020
IN VIOLATION
$0
DOB (22)
IssuedViolationStatus
Jun 23, 2024FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
#00873
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
#02242
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
#04575
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
#02330
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
#00214
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
#00213
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
#01421
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
#01422
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
#02671
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
#02672
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
#03812
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
#03813
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
#00828
DOB VIOLATION - ACTIVE
Apr 22, 2023FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
#00312
DOB VIOLATION - ACTIVE
Aug 21, 2022FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021)
#00748
DOB VIOLATION - ACTIVE
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#01413
DOB VIOLATION - ACTIVE
Jun 20, 2021FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020)
#00950
DOB VIOLATION - ACTIVE
Jun 29, 2020FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019)
#00821
DOB VIOLATION - ACTIVE
Feb 14, 2020FACADE SAFETY PROGRAM

#HAZ88669
DOB VIOLATION - ACTIVE
Mar 18, 2019FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2018)
#00463
DOB VIOLATION - ACTIVE
Mar 27, 2018FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2017)
#00106
DOB VIOLATION - ACTIVE
Feb 16, 2017FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2016
#00269
DOB VIOLATION - ACTIVE
DOB NOW Safety (36)
IssuedViolationStatus
Sep 16, 2026AEUHAZ FTC-AEU-HAZ
Active
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Mar 4, 2026Facades FTC-FC-UNSAFE
Unsafe report filed
Active
Dec 15, 2025Boiler FTC-BE-INT-HP
Violation Issued-Failure To File 2024 Internal Inspection Affirmation of Correction for HP Device
Active
Dec 15, 2025Boiler FTC-BE-INT-HP
Violation Issued-Failure To File 2024 Internal Inspection Affirmation of Correction for HP Device
Active
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 14)
Active
Oct 25, 2024Boiler FTC-BE-INT-HP
Violation Issued-Failure To File 2023 Internal Inspection Affirmation of Correction for HP Device
Active
Jun 23, 2024Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Active
Apr 25, 2023Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Apr 22, 2023Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Aug 21, 2022Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Jun 20, 2021Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Jun 29, 2020Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Feb 14, 2020Facades FISP
CYCLE 8A UNSAFE REPORT FILED
Active
Mar 18, 2019Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Mar 27, 2018Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Feb 16, 2017Retro-Commissioning - LL87 FTF-EN-EARCX
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 16, 2026DOB SafetyAEUHAZ: Open
Jul 13, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING FACADE WALL"S" AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION I OBSERVED AT EX #1, NORTH ELEVATION, CRACKED/TERRA-COTTA STONE BETWEEN 1ST-2ND FLOOR. AT EX #2, EAST ELEVATION, CROpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 9:18 AM ET. BBL 4156360001.

Look up another building