10 floors · 119,788 sq ft · built 1982 · class I1 · owner of record: Church Charity Foundation Of Li
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 15636). Agency page | Dec 31, 2026 in 65 days | Due this year |
| Annual boiler inspection (10 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-17 (Inspection Supervisor Review). Agency page | Dec 31, 2026 in 65 days | 8 of 10 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 119,788 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 430 days | Next cycle year 2027 |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $4,282,560 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SAFE (2026-09-21) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 13, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING FACADE WALL"S" AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION I OBSERVED AT EX #1, NORTH ELEVATION, CRACKED/TERRA-COTTA STONE BETWEEN 1ST-2ND FLOOR. AT EX #2, EAST ELEVATION, CR #35730071J | Sep 22, 2026 PENDING | $5,000 |
| Apr 20, 2026 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8A, 9A, 10A REPORT INDICATINGCORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #1011766. AGG1: PRIOR NOV 37026454K UND #37036652K | Oct 27, 2026 PENDING | $3,125 |
| Dec 8, 2025 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION I OBSERVED THAT THE SIDE WALK SHED INSTALLED PERMIT HAD EXPIRED. #39547723X | Feb 17, 2026 DEFAULT | $6,250 |
| Jul 24, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTES:AT THE TIME OF INSPECTION OBSERVE STEB CRACK AS EXPOSURE 2 SOUTH ELEVATION.REM:MAINTAIN EXTERIOR FACADE TAKE SAFETY MEASURES AND REPAIR DAMAG #35694083L | Sep 30, 2025 IN VIOLATION | $5,000 |
| Jun 24, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTED:AT THE TIME INSPECTION OBSERVED: STEP CRACK AT EXPOSURE 2 SOUTH ELEVATION(6TH FLOOR). REMEDY: MAINTAIN EXTERIOR FACADE. TAKE SAFETY MEASURES #35694077P | Sep 2, 2025 IN VIOLATION | $5,000 |
| Jan 8, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS#39053642Y ISSUED ON 1/3/2022,AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2).AN ACCEPTABLE CERTIFICAT #37032517J | Feb 24, 2026 IN VIOLATION | $1,250 |
| Jan 8, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS#39053644H ISSUED ON 1/3/2022,AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2).AN ACCEPTABLE CERTIFICAT #37032519N | Feb 24, 2026 IN VIOLATION | $1,250 |
| Jan 8, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS#39053643X ISSUED ON 1/3/2022,AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2).AN ACCEPTABLE CERTIFICAT #37032518L | Feb 24, 2026 IN VIOLATION | $1,250 |
| Jan 16, 2024 | Local Law CLASS - 2 FAILURE TO FILE ACCPETABLE AMENDED CYCLE 8A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #811766. REMEDY: FILE ACCEPTABLE REPORT. #37026454K | May 21, 2024 DEFAULT | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #911766.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE #37024001Z | Aug 22, 2023 ADMIT/IN-VIO | $0 |
| Jan 3, 2022 | Boilers CLASS - 2 ALL BOILERS OVER 8' TALL NEED LADDERS AND PLATFORMS CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION #39053644H | Dec 6, 2022 STIPULATION/IN-VIO | $0 |
| Jan 3, 2022 | Boilers CLASS - 2 ALL BOILERS OVER 8' TALL NEED LADDERS AND PLATFORMS CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION #39053643X | Dec 6, 2022 STIPULATION/IN-VIO | $0 |
| Jan 3, 2022 | Boilers CLASS - 2 ALL BOILERS OVER 8' TALL NEED LADDERS AND PLATFORMS CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION #39053642Y | Dec 6, 2022 STIPULATION/IN-VIO | $0 |
| Sep 21, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.NOTE:AT TIME OF INSPECTION OBSERVED THAT RESPONDENT DID NOT FILE CERTIFICATE OF CORRECTION FO #35537736K | Dec 15, 2020 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 23, 2024 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) #00873 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION #02242 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION #04575 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION #02330 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION #00214 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION #00213 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION #01421 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION #01422 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION #02671 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION #02672 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION #03812 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION #03813 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00828 | DOB VIOLATION - ACTIVE |
| Apr 22, 2023 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) #00312 | DOB VIOLATION - ACTIVE |
| Aug 21, 2022 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) #00748 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01413 | DOB VIOLATION - ACTIVE |
| Jun 20, 2021 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020) #00950 | DOB VIOLATION - ACTIVE |
| Jun 29, 2020 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019) #00821 | DOB VIOLATION - ACTIVE |
| Feb 14, 2020 | FACADE SAFETY PROGRAM #HAZ88669 | DOB VIOLATION - ACTIVE |
| Mar 18, 2019 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2018) #00463 | DOB VIOLATION - ACTIVE |
| Mar 27, 2018 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2017) #00106 | DOB VIOLATION - ACTIVE |
| Feb 16, 2017 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2016 #00269 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 16, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 4, 2026 | Facades FTC-FC-UNSAFE Unsafe report filed | Active |
| Dec 15, 2025 | Boiler FTC-BE-INT-HP Violation Issued-Failure To File 2024 Internal Inspection Affirmation of Correction for HP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-INT-HP Violation Issued-Failure To File 2024 Internal Inspection Affirmation of Correction for HP Device | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 14) | Active |
| Oct 25, 2024 | Boiler FTC-BE-INT-HP Violation Issued-Failure To File 2023 Internal Inspection Affirmation of Correction for HP Device | Active |
| Jun 23, 2024 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 22, 2023 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Aug 21, 2022 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Jun 20, 2021 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Jun 29, 2020 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Feb 14, 2020 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Mar 18, 2019 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Mar 27, 2018 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Feb 16, 2017 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 16, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 13, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING FACADE WALL"S" AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION I OBSERVED AT EX #1, NORTH ELEVATION, CRACKED/TERRA-COTTA STONE BETWEEN 1ST-2ND FLOOR. AT EX #2, EAST ELEVATION, CR | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 9:18 AM ET. BBL 4156360001.