Brooklyn · Block 1570 · Lot 27 · 11233

1893 Eastern Parkway

3 floors · 4 apartments · 3,558 sq ft · built 1927 · class S4 · owner of record: Eastern Pkwy Management Llc

22open violations
$0ECB/OATH penalties owed
4HPD class C (immediately hazardous)
70dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 70 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 70 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2021-11-04 (Accepted). Agency page

Dec 31, 2026
in 70 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 86 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 314 days
Registered through 2027-09-01

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
May 23, 2006Boilers Hazardous
B4B,4A,19B,38,50A,50B,50C,50D,50E,36. 50A-HOLES IN BOILER ROOM WALLS &CEILING.50B-VALVE ON EXPANSION TANK. 50C-PIPE BACK FLOW PREVENTOR DOWN50D-BOILER ROOM FIRE DOOR MISSING. 50E-SEAL HOLE IN CHIMNEY
#32051615P
Jul 16, 2007
IN VIOLATION
$0
DOB (4)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#09797
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#08739
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#45014
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#18929
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
HPD (13) · C 4 · B 5 · A 4
IssuedClassViolationCorrect by
Jun 10, 2019BApt 3R · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET, AT SOUTH WALL, IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHJul 15, 2019
Jun 10, 2019B§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES, AT PUBLIC HALL, 1st STORYJul 15, 2019
Jun 10, 2019CApt 3R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHJul 1, 2019
Jun 10, 2019CApt 3R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHJul 1, 2019
Jun 10, 2019CApt 3R · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APAJul 8, 2019
Jun 10, 2019B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLE ATTACHED TO STAIR BALUSTRADE, AT PUBLIC HALL STAIRS, 2nd STORYJul 15, 2019
Jun 10, 2019A§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING FIN RADIATOR COVER ( END PIECE), AT NORTHWALL, AT PUBLIC HALL, 1st STORYSep 13, 2019
Jun 10, 2019B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT, SCUTTLE OPENING, NORTH WALL, AT( APPROXIMATELY 2SQFT OPENING WITH EXPOSED INSULATION), AT PUBLIC HALL, 3rd STORYJul 15, 2019
Jun 10, 2019B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PLASTER AT, EAST WALL AND, CEILING AT PUBLIC HALL, 1st STORYJul 15, 2019
Jun 5, 2019A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYSep 8, 2019
Jun 5, 2019A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTEDSep 8, 2019
Feb 25, 2019CApt 3R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHMar 18, 2019
Jan 2, 2019AApt 3R · § 27-2005 ADM CODE PROVIDE DOORSWEEP IN THE ENTRANCE LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHApr 7, 2019

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 6:03 AM ET. BBL 3015700027.

Look up another building