4 floors · 3 apartments · 3,690 sq ft · built 1900 · class S3 · owner of record: 189 Avenue A Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 795 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-16 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 11, 2026 | Construction CLASS - 2 NOTED AT TIME OF INSPECTION SIDEWALK SHED INSTALLED AT EXP1 FRONT OF PROPERTY ALONG AVENUE A HAS NO VALID PERMIT, RENEW PERMIT #39200160Z | Oct 15, 2026 IN VIOLATION | $625 |
| Jul 10, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE. AT THE TIME OF INSPECTION, OBSERVED VERTICAL CRACKS SPANNING FROM THE 2ND TO 3RD STORY. ADDITIONALLY, DECORATIVE STONE WINDOW LINTELS AT THE 2ND, 3RD, AND 4TH STORI #39195669H | Sep 17, 2026 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 10, 2026 | CONSTRUCTION REQUESTING A STRUCTURAL STABILITY REPORT DUE TO CRACKS OBSERVED AT EXPOSURE 1, CRACKS SPAN FROM THE 2ND TO 3RD STORIES WITH CRACK SPANNING ALONG FIRE ESCAPE. DECORATIVE STONE WINDOW LINTELS AT THE 2ND, 3RD, AND 4TH STORIES WERE CRACKED AND IN A STATE OF DISREPAIR. #26-01748 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Aug 12, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 19, 2019 | A | § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT FIRE ESCAPE AT BUILDING FRONT | Dec 23, 2019 |
| Jun 11, 2008 | A | Apt 3 · D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS WALLS AND WOODWORK 3R DSTY REAR APT 3 THROUGHOUT. , SECTION '' '' | Sep 14, 2008 |
| Jun 11, 2008 | A | Apt 3 · D26-10.01 ADM CODE REFIT WINDOW SASHES AT 3RD STY APT 3 KITCHEN. , SECTION '' '' | Sep 14, 2008 |
| Jun 11, 2008 | A | Apt 3 · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALL AT 3RD STY APT 3 KITCHEN. , SECTION '' '' | Sep 14, 2008 |
| Jun 11, 2008 | B | Apt 3 · D26-10.01, 10.05 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ENTRANCE 3 STY SOUTHEAST APT 3 R55. , SECTION '' '' | Jul 16, 2008 |
| Jun 11, 2008 | B | Apt 3 · D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOSED WIRE KITCHEN CEILING LIGHT FIXTURE 3 STY SOUTHEAST APT 3 R58. , SECTION '' '' | Jul 16, 2008 |
| Jun 11, 2008 | B | Apt 3 · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS AND WALLS 3RD STY REAR APT 3 BATHROOM AND KITCHEN. , SECTION '' '' | Jul 16, 2008 |
| Oct 25, 2005 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM , , 1st STORY | Nov 5, 2005 |
| May 8, 2003 | B | Apt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, APARTMENT AT WEST | Jun 17, 2003 |
| May 8, 2003 | B | Apt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, APARTMENT AT WEST | Jun 17, 2003 |
| Mar 5, 2003 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM 1 STY AT PUBLIC HALL | Mar 16, 2003 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 12, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 11, 2026 | ECB | Construction: NOTED AT TIME OF INSPECTION SIDEWALK SHED INSTALLED AT EXP1 FRONT OF PROPERTY ALONG AVENUE A HAS NO VALID PERMIT, RENEW PERMIT | Open |
| Jul 10, 2026 | DOB | CONSTRUCTION: REQUESTING A STRUCTURAL STABILITY REPORT DUE TO CRACKS OBSERVED AT EXPOSURE 1, CRACKS SPAN FROM THE 2ND TO 3RD STORIES WITH CRACK SPANNING ALONG FIRE ESCAPE. DECORATIVE STONE WINDOW LINTELS AT THE 2ND, 3RD, AND 4TH STORIES WERE CRACKED AND IN A STATE OF DISREPAIR. | Open |
| Jul 10, 2026 | DOB | IMMEDIATE EMERGENCY: INSTALL APPROXIMATELY 25' LINEAR FEET OF SIDEWALK SHED ALONG EXPO #1 (AVENUE A) FOR OVERHEAD PROTECTION FOR FRONT OF BUILDING ENTRY WAY TO SAFEGUARD THE PUBLIC | Closed |
| Jul 10, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE. AT THE TIME OF INSPECTION, OBSERVED VERTICAL CRACKS SPANNING FROM THE 2ND TO 3RD STORY. ADDITIONALLY, DECORATIVE STONE WINDOW LINTELS AT THE 2ND, 3RD, AND 4TH STORI | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 1:18 PM ET. BBL 1004390030.