6 floors · 1168 apartments · 860,000 sq ft · built 1950 · class D1 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 63 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 860,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1344). Agency page | Dec 31, 2034 in 2985 days | Next due 2034 |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-02 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 16, 2026 | Construction CLASS - 1 FAILURE TO PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT DESIGNATED UNSAFE FACADE AS PER TECHNICAL REPORT UNSAFE-1009297-10A-001. NOTED: OBSERVED NO ADEQUATE SAFETY MEASURES INSTALLED AT EXP 1(W. ELEV), EX #35730942X | Sep 28, 2026 POP/IN-VIO | $0 |
| Sep 16, 2026 | Construction CLASS - 1 FAILURE TO PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT DESIGNATED UNSAFE FACADE AS PER TECHNICAL REPORT UNSAFE-1009295-10A-001. NOTED: OBSERVED NO ADEQUATE SAFETY MEASURES INSTALLED AT ALL EXPOSURES. REM #35730943H | Sep 28, 2026 POP/IN-VIO | $0 |
| Sep 15, 2026 | Construction CLASS - 1 FAILURE TO PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT DESIGNATED UNSAFE FACADE AS PER TECHNICAL REPORT UNSAFE-1009304-10A-001. NOTED: OBSERVED NO ADEQUATE PROTECTION AT EXP 2(S. ELEV) AND EXP 3(W. ELEV) #35730939P | Sep 28, 2026 POP/IN-VIO | $0 |
| Mar 20, 2026 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. AT THE TIME OF INSPECTION ONE OF THE DOOR LEAVES FOR EXIT DISCHARGE DOOR LEADING TO PLAYGROUND WAS NOT SELF-CLOSING AND THE OTHER WAS NOT OPENING AT ALL, REPAIR/REPLACE DOOR #39181318Z | Apr 7, 2026 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909298.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE #37023583N | Feb 8, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909301.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE #37023580H | Feb 8, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909307.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE #37023547X | Feb 8, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMETING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909306.REMEDY:SUBMIT ACCEPTABLE REQUIRED TEC #37023575N | Feb 8, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909304.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE #37023577R | Feb 8, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMETING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909302.REMEDY:SUBMIT ACCEPTABLE REQUIRED TEC #37023579K | Feb 8, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMETING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909303.REMEDY:SUBMIT ACCEPTABLE REQUIRED TEC #37023578Z | Feb 8, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMETING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909295.REMEDY:SUBMIT ACCEPTABLE REQUIRED TEC #37023573J | Feb 8, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909296.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE #37023585R | Feb 8, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMETING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909308.REMEDY:SUBMIT ACCEPTABLE REQUIRED TEC #37023586Z | Feb 8, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMETING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909305.REMEDY:SUBMIT ACCEPTABLE REQUIRED TEC #37023576P | Feb 8, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909297.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE #37023596M | Feb 8, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909299.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE #37023582L | Feb 8, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909300.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE #37023581J | Feb 8, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01058 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01047 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01054 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01055 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01057 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01060 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01056 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01050 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01059 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01048 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01053 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01052 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01051 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01049 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 21, 2020 | A | Apt 3D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | May 26, 2020 |
| Aug 9, 2018 | A | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MAILBOXES AT EAST WALL AT PUBLIC HALL, 1st STORY | Nov 12, 2018 |
| Mar 4, 2008 | B | Apt 2F · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EVIDENCE OF WATER LEAK AT CEILING, IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 8, 2008 |
| Mar 4, 2008 | B | Apt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING, IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 8, 2008 |
| Mar 4, 2008 | B | Apt 2F · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE, IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 8, 2008 |
| Mar 4, 2008 | B | Apt 2F · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES, IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 8, 2008 |
| Mar 4, 2008 | B | Apt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH AND EAST WALL, IN THE 1st ROOM FROM NORTH LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 8, 2008 |
| Mar 4, 2008 | A | Apt 2F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS, IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 7, 2008 |
| Mar 4, 2008 | B | Apt 2F · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT SOUTH WALL, IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 8, 2008 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 16, 2026 | ECB | Construction: FAILURE TO PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT DESIGNATED UNSAFE FACADE AS PER TECHNICAL REPORT UNSAFE-1009297-10A-001. NOTED: OBSERVED NO ADEQUATE SAFETY MEASURES INSTALLED AT EXP 1(W. ELEV), EX | Open |
| Sep 16, 2026 | ECB | Construction: FAILURE TO PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT DESIGNATED UNSAFE FACADE AS PER TECHNICAL REPORT UNSAFE-1009295-10A-001. NOTED: OBSERVED NO ADEQUATE SAFETY MEASURES INSTALLED AT ALL EXPOSURES. REM | Open |
| Sep 15, 2026 | ECB | Construction: FAILURE TO PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT DESIGNATED UNSAFE FACADE AS PER TECHNICAL REPORT UNSAFE-1009304-10A-001. NOTED: OBSERVED NO ADEQUATE PROTECTION AT EXP 2(S. ELEV) AND EXP 3(W. ELEV) | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 8:30 AM ET. BBL 3013440001.