Bronx · Block 2311 · Lot 1 · 10454

188 Lincoln Avenue

20 floors · 1022 apartments · 1,478,410 sq ft · built 1964 · class D3 · owner of record: Nyc Housing Authority

91open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 1,478,410 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 778 days
Next cycle year 2028
Energy audit and retro-commissioning (2031) Likely applies
Local Law 87 · Calendar year 2031
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2311). Agency page

Dec 31, 2031
in 1873 days
Next due 2031
Annual boiler inspection (8 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-20 (Accepted). Agency page

On file2026 reports accepted
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $502,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: UNSAFE (2025-11-28)

Open violations

ECB / OATH (9)
IssuedViolationHearingBalance
Oct 1, 2025Boilers CLASS - 1
OBSERVED A CLEAVER BROOKS DUEL FUEL BOILER MODEL# CBW -200. CEASED USE DUE TO CHIMNEY COLLAPSE FROM THE BURNERS MALFUNCTION, AS WELL AS, FLUEPIPE DISLODGEMENT.DO NOT OPERATE UNTIL ALL HAZADOUS CONDITIONS ARE IM
#39162223M
Oct 20, 2025
POP/IN-VIO
$0
Oct 1, 2025Boilers CLASS - 1
OBSERVED A CLEAVER BROOKS DUEL FUEL BOILER MODEL# CBW -200. CEASED USE DUE TO CHIMNEY COLLAPSE FROM THE BURNERS MALFUNCTION, AS WELL AS, FLUEPIPE DISLODGEMENT.DO NOT OPERATE UNTIL ALL HAZADOUS CONDITIONS ARE IM
#39162207M
Oct 20, 2025
POP/IN-VIO
$0
Oct 1, 2025Boilers CLASS - 1
OBSERVED A CLEAVER BROOKS DUEL FUEL BOILER MODEL# CBW -200. CEASED USE DUE TO CHIMNEY COLLAPSE FROM THE BURNERS MALFUNCTION, AS WELL AS, FLUEPIPE DISLODGEMENT.DO NOT OPERATE UNTIL ALL HAZADOUS CONDITIONS ARE IM
#39162213Z
Oct 20, 2025
POP/IN-VIO
$0
Oct 1, 2025Boilers CLASS - 1
OBSERVED A CLEAVER BROOKS DUEL FUEL BOILER MODEL# CBW -200. CEASED USE DUE TO CHIMNEY COLLAPSE FROM THE BURNERS MALFUNCTION, AS WELL AS, FLUEPIPE DISLODGEMENT.DO NOT OPERATE UNTIL ALL HAZADOUS CONDITIONS ARE IM
#39162217X
Oct 20, 2025
POP/IN-VIO
$0
Oct 1, 2025Boilers CLASS - 1
OBSERVED A CLEAVER BROOKS DUEL FUEL BOILER MODEL# CBW -200. CEASED USE DUE TO CHIMNEY COLLAPSE FROM THE BURNERS MALFUNCTION, AS WELL AS, FLUEPIPE DISLODGEMENT.DO NOT OPERATE UNTIL ALL HAZADOUS CONDITIONS ARE IM
#39162230K
Oct 20, 2025
POP/IN-VIO
$0
Oct 1, 2025Boilers CLASS - 1
OBSERVED A CLEAVER BROOKS DUEL FUEL BOILER MODEL# CBW -200. CEASED USE DUE TO CHIMNEY COLLAPSE FROM THE BURNERS MALFUNCTION, AS WELL AS, FLUEPIPE DISLODGEMENT.DO NOT OPERATE UNTIL ALL HAZADOUS CONDITIONS ARE IM
#39162202N
Oct 20, 2025
POP/IN-VIO
$0
Oct 1, 2025Boilers CLASS - 1
OBSERVED A CLEAVER BROOKS DUEL FUEL BOILER MODEL# CBW -200. CEASED USE DUE TO CHIMNEY COLLAPSE FROM THE BURNERS MALFUNCTION, AS WELL AS, FLUEPIPE DISLODGEMENT.DO NOT OPERATE UNTIL ALL HAZADOUS CONDITIONS ARE IM
#39162228L
Oct 20, 2025
POP/IN-VIO
$0
Oct 1, 2025Boilers CLASS - 1
OBSERVED A CLEAVER BROOKS DUEL FUEL BOILER MODEL# CBW -200. CEASED USE DUE TO CHIMNEY COLLAPSE FROM THE BURNERS MALFUNCTION, AS WELL AS, FLUEPIPE DISLODGEMENT.DO NOT OPERATE UNTIL ALL HAZADOUS CONDITIONS ARE IM
#39162205Z
Oct 20, 2025
POP/IN-VIO
$0
Nov 10, 2015Construction CLASS - 2
REMOVAL OF SHED W/O DEPT APPROVAL. NOTED: AT TIME OF INSPECTION FACADEREPORT IS UNSAFE SIDEWALK SHED WAS REMOVED W/O DEPT APPROVAL. REMEDY: COMPLY W/1RCNY 103-04.
#35157562P
Jan 8, 2016
DEFAULT
$0
DOB (26)
IssuedViolationStatus
Oct 1, 2025CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT DUE TO EXPLOSION AT BASE OF CHIMNEY AT EXPOSURE 2 CAUSING FULL STRUCTURE COLLAPSE OF 20 STORY CHIMNEY, PARTIAL VACATE OF G AND F LINE FLOOR 2-20, COURT UNDER COLLAPSED AREA AND CELLAR 20'X20' AREA UNDER BASE OF CHIMNEY AND BOILER ROOM ISSUED..
#25-02245
DOB VIOLATION - ACTIVE
Oct 1, 2025CONSTRUCTION
FTM.BLDG IN A SAFE CONIDTION-ON 10/1/25 THE BRICK CHIMNEY @EXP2,2/3 CORNER APPROX 10FT X 10FT(FULL BLDG HEIGHT)PARTIALLY COLLAPSED.CHIMNEY WALLS PARTIALLY COLLAPSED @ APPROX EXP1 TOP 2 FLRS.OWNER TO RETAIN NYSPE TO EVAL ENTIRE BLD&FILE REPAIR DWGS W/DOB T/BE PERM REPAIRED UNDER PERMIT STARTING 12/8/
#FEU20102PN
DOB VIOLATION - ACTIVE
Oct 1, 2025CONSTRUCTION
EMERGENCY WORK ORDER-BRICK CHIMNEY APPRX 10FT X 10FT @ EXP2 2/3 BLDG CORNER PARTIALLY COLLAPSED ON 10/01/2025.CHIMNEY WALL COLLAPSEED FROM GRADE TO ROOF.EXP1 CHIMNEY WALL PARTIALLY COLLAPSED.OWNER TO IMMED RETAIN NYSPE&GC TO IMMEED DEMOLISH REMAIN CHIMNEY UNDER F/T ON SITE NYSPE SUPERV FILE FOR PERM
#FEU20101PN
DOB VIOLATION - ACTIVE
Jun 25, 2025PLUMBING
THE DEPARTMENT OF BUILDINGS ORDERS ALL PLUMBING WORK UNDER PERMIT NUMBER STOPPED IMMEDIATELY #200565655 DUE TO THE INACTIVE OF LMP # 1343
#25-01323
DOB VIOLATION - ACTIVE
Jun 25, 2025PLUMBING
THE DEPARTMENT OF BUILDINGS ORDERS ALL PLUMBING WORK UNDER PERMIT NUMBER STOPPED IMMEDIATELY #200450680 DUE TO THE INACTIVE OF LMP # 1343
#25-01321
DOB VIOLATION - ACTIVE
Jun 25, 2025PLUMBING
THE DEPARTMENT OF BUILDINGS ORDERS ALL PLUMBING WORK UNDER PERMIT NUMBER STOPPED IMMEDIATELY #20051839 DUE TO THE INACTIVE OF LMP # 1343
#25-01317
DOB VIOLATION - ACTIVE
Jun 24, 2025PLUMBING
THE DEPARTMENT OF BUILDINGS ORDERS ALL PLUMBING WORK UNDER PERMIT # 200565646 STOPPED IMMEDIATELY DUE TO THE INACTIVE OF LMP # 1343
#25-01292
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00471
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00473
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00469
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00470
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00474
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00472
DOB VIOLATION - ACTIVE
Feb 20, 2020FACADE SAFETY PROGRAM
NYCHA UNSAFE CYCLE 8 REPORT FILED
#HAZ88832
DOB VIOLATION - ACTIVE
Feb 20, 2020FACADE SAFETY PROGRAM
NYCHA UNSAFE CYCLE 8 REPORT FILED
#HAZ88831
DOB VIOLATION - ACTIVE
Feb 20, 2020FACADE SAFETY PROGRAM
NYCHA UNSAFE CYCLE 8 REPORT FILED
#HAZ88838
DOB VIOLATION - ACTIVE
Feb 20, 2020FACADE SAFETY PROGRAM
NYCHA UNSAFE CYCLE 8 REPORT FILED
#HAZ88834
DOB VIOLATION - ACTIVE
Feb 20, 2020FACADE SAFETY PROGRAM
NYCHA UNSAFE CYCLE 8 REPORT FILED
#HAZ88833
DOB VIOLATION - ACTIVE
Apr 5, 2019NYCHA ELEV ANNUAL INSPECTION/TEST
VIO ISSUED TO NYCHA ELEVATOR-FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
#00053
DOB VIOLATION - ACTIVE
Sep 15, 2017NYCHA ELEV ANNUAL INSPECTION/TEST
VIO ISSUED TO NYCHA ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
#00096
DOB VIOLATION - ACTIVE
Dec 1, 2016NYCHA ELEV ANNUAL INSPECTION/TEST
VIO ISSUED TO NYCHA ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
#00036
DOB VIOLATION - ACTIVE
Jun 1, 2016NYCHA ELEVATOR PERIODIC INSPECTION/TEST
FAILURE TO PERFORM CATEGORY 5 INSPECTION
#00058
DOB VIOLATION - ACTIVE
Nov 16, 2004CONSTRUCTION

#0101MM
DOB VIOLATION - ACTIVE
Apr 7, 1992LOCAL LAW 10/81 - ELEVATOR
1
#05001
DOB VIOLATION - ACTIVE
Apr 17, 1990PUBLIC ASSEMBLY

#043R
DOB VIOLATION - ACTIVE
May 31, 1989PUBLIC ASSEMBLY

#402IL
DOB VIOLATION - ACTIVE
DOB NOW Safety (54)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Feb 20, 2020Facades FISP
NYCHA UNSAFE CYCLE 8 REPORT FILED
Active
Feb 20, 2020Facades FISP
NYCHA UNSAFE CYCLE 8 REPORT FILED
Active
Feb 20, 2020Facades FISP
NYCHA UNSAFE CYCLE 8 REPORT FILED
Active
Feb 20, 2020Facades FISP
NYCHA UNSAFE CYCLE 8 REPORT FILED
Active
Feb 20, 2020Facades FISP
NYCHA UNSAFE CYCLE 8 REPORT FILED
Active
HPD (2) · C 0 · B 1 · A 1
IssuedClassViolationCorrect by
Sep 9, 2019AApt 3F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM NORTH, THE 4th ROOM FROM NORTH AT EAST, THE 4th ROOM FROM NORTH AT WEST, THE PRIVATE HALLWAY , THE FOYER , THE KITCHEN , THE BATHROOM LOCATED AT APT 3F, 3rd STORY,Dec 13, 2019
Jul 14, 2014BApt 7 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 7, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHAug 18, 2014

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionClosed
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionClosed
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionClosed
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionClosed
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionClosed
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionClosed
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportClosed
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 2:37 PM ET. BBL 2023110001.

Look up another building