Manhattan · Block 453 · Lot 8 · 10003

188 2 Avenue

6 floors · 20 apartments · 19,299 sq ft · built 1920 · class C7 · owner of record: 188 2 Equities Corp

18open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 66 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-10-04 (Accepted). Agency page

Dec 31, 2026
in 66 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 82 days
Annual
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 797 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (4)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#02093
DOB VIOLATION - ACTIVE
Jul 26, 2018PLUMBING
ACCESS TO PREMISES TO INSPECT APPROVED WORK UNDER ACTIVE JOB #123258063 HAS BEEN DENIED BY MALE OCCUPANT AT 10:48AM. STOP ALL WORK UNDER ABOVE CITED APPLICATION
#PL0301DL
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#01390
DOB VIOLATION - ACTIVE
Jul 25, 1990CONSTRUCTION

#A4PR04
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
HPD (10) · C 2 · B 6 · A 2
IssuedClassViolationCorrect by
Aug 2, 2024BApt 1 · § 27-2005 HMC: REFIT BATHROOM DOOR IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 6, 2024
Aug 2, 2024BApt 1 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 6, 2024
Aug 2, 2024BApt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 6, 2024
Oct 30, 2023C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 6TH AND 7TH METAL PANS AND RISERS FROM BOTTOM UP AT PUBLIC HALL STAIRS, 6th STORYNov 5, 2023
Oct 30, 2023BApt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTDec 4, 2023
Apr 7, 2022CApt 11 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 11, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTMay 3, 2022
Oct 29, 2018BApt 10 · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING AND EAST WALL (20 SQ FT ) IN THE BATHROOM LOCATED AT APT 10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTDec 3, 2018
Jun 6, 2018A§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 6TH STY BUILDING FRONT ORNAMENTAL WINDOW SILLS.Sep 9, 2018
Jun 6, 2018A§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE BUILDINT FRONT CORNICE AT PARPET WALL ROOF.Sep 9, 2018
Jun 6, 2018B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CORNICE AT PARPET WALL ROOF.BUILDING FRONTJul 11, 2018

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 6:43 PM ET. BBL 1004530008.

Look up another building