2 floors · 1 apartments · 5,659 sq ft · class A3 · owner of record: Palo Alto Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 286 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 22, 2026 | Construction CLASS - 1 OBSERVED: ACTIVE SITE UPON INSPECTION NOTED A PILE OF EARTH INSIDE THE BASEMENT AND EXP 1 INTERIOR ., ALSO BLACK PLASTIC BAGS ON DIFERENTS LOCATIONS AND LEVELS CONTRARY TO BUILDING CODE #39559461N | Dec 1, 2026 PENDING | $2,500 |
| Sep 22, 2026 | Unknown CLASS - 2 1704.1 ., SECCTION 110 & 28-116 OBSERVED: ACTIVE SITE UPON INSPECTION REQUESTED C JOINTS SPECIAL INSPECTION REPORT FOR 1ST,2ND AND ATTIC LEVEL ALSO MANUFACTURER SPECIFICATIONS., NONE WAS PROVIDED OR MAINTAINED #39559459Y | Dec 1, 2026 PENDING | $2,500 |
| Sep 22, 2026 | Unknown CLASS - 2 MISCELLANEOUS VIOLATIONS. BC3303.7.2 INADEQUATE FIRE EXTINGUISHERS: OBSERVED IT IN DIFFERENT LOCATIONS NOT PER SIZE, NO TAGS, NO MONTH BY MONTH INSPECTION, CONTRARY TO NYC FIRE CODE. REMEDY: COMPLY WITH CODE. #39559465K | Dec 15, 2026 PENDING | $2,500 |
| Apr 22, 2025 | Construction CLASS - 1 DURING INSPECTION OF AN ACTIVE SITE I OBSERVED OPEN PERIMETER TO THE EXCAVATED SITE. THERE WAS NO GUARDRAILS IN PLACE TO PREVENT ANYONE FROM FALLING OVER THE OPEN SIDES WHILE WALKING NEAR THE LEADING EDGE, WHIC #39539370J | Jul 1, 2025 IN VIOLATION | $5,000 |
| Apr 22, 2025 | Construction CLASS - 1 DURING INSPECTION OF AN ACTIVE SITE AT SOE/FOUNDATION PHASE, I OBSERVED THAT THE LAGGING WALL AT EX#2 WAS NOT INSTALLED AS PER PLANS. THE WHALERS AND RACKERS WERE NOT FLUSH UP AGAINST THE LAGGING TO CREATE A SE #39539371L | Jul 1, 2025 IN VIOLATION | $2,500 |
| Apr 22, 2025 | Construction CLASS - 1 DURING INSPECTION OF AN ACTIVE SITE AT FOUNDATION/SOE PHASE I OBSERVED THAT THE STEPPED SOIL WHICH IS THE ACCESS TO THE SITE WAS MISSING HANDRAILS. THE SOIL STEPS WERE STEEP, ROCKY AND UNEVEN, CREATING A TRIP A #39539369M | Jul 1, 2025 IN VIOLATION | $2,500 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 22, 2026 | ECB | Construction: OBSERVED: ACTIVE SITE UPON INSPECTION NOTED A PILE OF EARTH INSIDE THE BASEMENT AND EXP 1 INTERIOR ., ALSO BLACK PLASTIC BAGS ON DIFERENTS LOCATIONS AND LEVELS CONTRARY TO BUILDING CODE | Open |
| Sep 22, 2026 | ECB | Unknown: 1704.1 ., SECCTION 110 & 28-116 OBSERVED: ACTIVE SITE UPON INSPECTION REQUESTED C JOINTS SPECIAL INSPECTION REPORT FOR 1ST,2ND AND ATTIC LEVEL ALSO MANUFACTURER SPECIFICATIONS., NONE WAS PROVIDED OR MAINTAINED | Open |
| Sep 22, 2026 | ECB | Unknown: MISCELLANEOUS VIOLATIONS. BC3303.7.2 INADEQUATE FIRE EXTINGUISHERS: OBSERVED IT IN DIFFERENT LOCATIONS NOT PER SIZE, NO TAGS, NO MONTH BY MONTH INSPECTION, CONTRARY TO NYC FIRE CODE. REMEDY: COMPLY WITH CODE. | Open |