Bronx · Block 2950 · Lot 1 · 10457

1879 Clinton Avenue

6 floors · 30 apartments · 34,080 sq ft · built 1937 · class D1 · owner of record: Bcet Housing Development Fund Corporatio N Fee Owne

44open violations
$0ECB/OATH penalties owed
8HPD class C (immediately hazardous)
60dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 60 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 60 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 76 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 34,080 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 181 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 181 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 304 days
Registered through 2027-09-01
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-22 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (4)
IssuedViolationHearingBalance
May 4, 2021Construction CLASS - 2
WORK DOES NOT CONFORM TO APPROVE CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.AT TIME OF INSPECTION OF A 6 STORY EXISTING BUILDING UNDER RENOVATION,I OBSERVED A SUPPORTED SCAFFOLD AT EXP 1,2,3,4 WITH THE F
#35556117P
Feb 18, 2022
IN VIOLATION
$0
Nov 24, 2020Construction CLASS - 1
UNQUALIFIED SUPERVISOR OR WORKER PERFORMING WORK ON SCAFFOLD(SUPPORTED). AT THE TIME OF MY INSPECTION ON AN ACTIVE JOB SITE,I OBSERVED WORKERS ENGAGED IN MASONRY WORK OFF OF THE SUPPORTED SCAFFOLDS AT EXPO#1 OF
#35544980H
Feb 5, 2021
IN VIOLATION
$0
Nov 24, 2020Site Safety CLASS - 1
FAILURE TO DESIGNATE AND/OR HAVE A CONSTRUCTION SUPERINTENDENT PRESENTAT SITE AS REQUIRED. AT TIME OF INSPECTION AT AN ACTIVE CONST JOB SITE,OBSERVED WORKERS ENGAGED IN CONST ACTIVITY. UPON REQUESTING THE COMPE
#35544977R
Feb 5, 2021
IN VIOLATION
$0
Nov 24, 2020Site Safety CLASS - 1
CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE. AT THE TIME OF MY INSPECTION ON AN ACTIVE JOB SITE,I OBSERVED WORKERS ENGAGEDIN MASONRY WORK ON THE FACADE OF EXPO#1,WHERE AS THE SITE'S CONST SUPE
#35544978Z
Feb 5, 2021
IN VIOLATION
$0
DOB (6)
IssuedViolationStatus
Aug 3, 2024FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00056
DOB VIOLATION - ACTIVE
May 3, 2024FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00322
DOB VIOLATION - ACTIVE
Feb 22, 2024FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00147
DOB VIOLATION - ACTIVE
Nov 2, 2023FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00177
DOB VIOLATION - ACTIVE
Aug 2, 2023FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00249
DOB VIOLATION - ACTIVE
May 2, 2023FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00526
DOB VIOLATION - ACTIVE
DOB NOW Safety (7)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 6)
Active
Aug 3, 2024Benchmarking - LL84 FTF-EN-BENCH
Active
May 3, 2024Benchmarking - LL84 FTF-EN-BENCH
Active
Feb 22, 2024Benchmarking - LL84 FTF-EN-BENCH
Active
Nov 2, 2023Benchmarking - LL84 FTF-EN-BENCH
Active
Aug 2, 2023Benchmarking - LL84 FTF-EN-BENCH
Active
May 2, 2023Benchmarking - LL84 FTF-EN-BENCH
Active
HPD (27) · C 8 · B 12 · A 7
IssuedClassViolationCorrect by
Oct 27, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 6th STORYJan 30, 2027
Oct 27, 2026B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING (NEAR UNIT ''6A'') AT PUBLIC HALL, 6th STORYDec 1, 2026
Oct 27, 2026C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING (NEAR UNIT ''6A'') AT PUBLIC HALL, 6th STORYNov 2, 2026
Sep 28, 2026BApt 1A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, APARTMENT AT SOUTHNov 2, 2026
Dec 9, 2025B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING AT PUBLIC HALL, 6th STORYJan 13, 2026
Dec 9, 2025A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, AT PUBLIC HALL, 6th STORYMar 14, 2026
Dec 9, 2025BApt 3E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOMMUNICATION SYSTEM LOCATED AT APT 3E, 3rd STORY, APARTMENT AT WESTJan 13, 2026
Dec 9, 2025BApt 1A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOMMUNICATION SYSTEM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHJan 13, 2026
Jun 27, 2025BApt 4E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM WEST AT NORTHAug 1, 2025
May 8, 2025B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUILDING BUZZER INTERCOM SYSTEM AT SOUTH WALL IN BUILDING VESTIBULE AREA , 1st STORYJun 12, 2025
Oct 2, 2023AApt 4A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHJan 5, 2024
Oct 2, 2023AApt 4A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CABINET DOOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHJan 5, 2024
Oct 2, 2023CApt 4A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 28, 2023
Oct 2, 2023CApt 4A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 28, 2023
Oct 2, 2023AApt 4A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHJan 5, 2024
Oct 2, 2023BApt 4A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER SASH SPRING BALANCE AT 2ND WINDOW FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 6, 2023
Jan 30, 2023CApt 2B · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR AT ENTRANCE LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHFeb 13, 2023
Jan 30, 2023CApt 2B · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APAFeb 25, 2023
Jan 30, 2023CApt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHFeb 25, 2023
Jan 30, 2023C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED AT CELLARFeb 5, 2023
Jan 27, 2023CApt 2B · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHJan 27, 2023
Mar 24, 2022B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL IN THE VESTIBULE , 1st STORYApr 28, 2022
Dec 12, 2016AApt 2E · § 27-2005 ADM CODE REFIT ALL WINDOWS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 17, 2017
Mar 30, 2016BApt 6A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHMay 4, 2016
Sep 4, 2014BApt 6A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 9, 2014
May 6, 2014AApt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH1 AND NORTH2 WINDOW FRAMES IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 6A, 6th STORY, APARTMENT AT SOUTHAug 9, 2014
May 6, 2014BApt 6A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AT WINDOW FRAME IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 6A, 6th STORY, APARTMENT AT SOUTHJun 10, 2014

Issued in the last 120 days

DateSourceWhatNow
Oct 27, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 6th STORYOpen
Oct 27, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING (NEAR UNIT ''6A'') AT PUBLIC HALL, 6th STORYOpen
Oct 27, 2026HPD C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING (NEAR UNIT ''6A'') AT PUBLIC HALL, 6th STORYOpen
Sep 28, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, APARTMENT AT SOUTHOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 10:28 PM ET. BBL 2029500001.

Look up another building