3 floors · 6 apartments · 6,188 sq ft · built 1905 · class C2 · owner of record: Jc Real Estate Development L.P.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-20 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #07668 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #29701 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #06847 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #22373 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 13, 2026 | A | Apt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 16, 2026 |
| Jul 9, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED TO CELLAR AT 1ST STORY AT BOILER ROOM | Jul 15, 2026 |
| Jul 7, 2026 | C | Apt 2B · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 6, 2026 |
| Oct 1, 2025 | A | Apt 2A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT NORTH, THE KITCHEN , THE BATHROOM , THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH | Jan 4, 2026 |
| Oct 1, 2025 | B | Apt 2A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... (GREATER THAN 10 SQ FT) ON CEILING IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 5, 2025 |
| Oct 1, 2025 | B | Apt 2A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE COMPOSITE TILES AT FLOOR IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 5, 2025 |
| Oct 1, 2025 | B | Apt 2A · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 5, 2025 |
| Oct 1, 2025 | B | Apt 2A · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 5, 2025 |
| Feb 4, 2025 | C | Apt 3A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE 2ND RADIATOR FROM NORTH AT EAST CRACKED AND CORRODED IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 10, 2025 |
| Feb 4, 2025 | C | Apt 3A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE 1ST RADIATOR CRACKED AND CORRODED FROM NORTH AT EAST IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 10, 2025 |
| Feb 4, 2025 | B | Apt 3A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 11, 2025 |
| Feb 4, 2025 | B | Apt 3A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 11, 2025 |
| Jan 31, 2025 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE BUILDING FRONT YARD | Mar 7, 2025 |
| Dec 6, 2024 | C | Apt 1B · § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY | Dec 5, 2024 |
| Dec 4, 2024 | B | Apt 2A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR AT THE SOUTH WALL 1st DOOR FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 8, 2025 |
| Dec 4, 2024 | B | Apt 2A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 8, 2025 |
| Dec 4, 2024 | B | Apt 2A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 8, 2025 |
| Dec 4, 2024 | B | Apt 2A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT THE SINK IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 8, 2025 |
| Dec 4, 2024 | B | Apt 2A · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 8, 2025 |
| Dec 4, 2024 | B | Apt 2A · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 8, 2025 |
| Dec 4, 2024 | B | Apt 2A · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 8, 2025 |
| Dec 4, 2024 | C | Apt 2A · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 4, 2024 |
| Dec 4, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM .LOCKED DOOR AT CELLAR AT BOILER ROOM | Dec 10, 2024 |
| Dec 2, 2024 | C | Apt 2A · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 1, 2024 |
| Dec 2, 2024 | B | Apt 2A · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 6, 2025 |
| Dec 2, 2024 | B | Apt 2A · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 6, 2025 |
| Dec 2, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR | Dec 8, 2024 |
| Nov 26, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | Dec 2, 2024 |
| Nov 26, 2024 | C | Apt 1B · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 25, 2024 |
| Apr 28, 2023 | B | Apt 3B · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 2, 2023 |
| Apr 28, 2023 | A | Apt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE FOYER LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 1, 2023 |
| Apr 28, 2023 | B | Apt 3B · § 27-2045, 2046 ADM CODE PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 2, 2023 |
| Nov 2, 2022 | B | Apt 3B · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR INOPERATIVE LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 7, 2022 |
| Nov 2, 2022 | B | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 2B, 2nd STORY, APARTMENT AT NORTH | Dec 7, 2022 |
| Nov 2, 2022 | B | Apt 3A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE THE WOOD FLOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 7, 2022 |
| Nov 2, 2022 | B | Apt 3B · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERATIVE LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 7, 2022 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 13, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 9, 2026 | HPD C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED TO CELLAR AT 1ST STORY AT BOILER ROOM | Open |
| Jul 7, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 7:17 AM ET. BBL 3034110055.