Brooklyn · Block 953 · Lot 10 · 11217

187 5 Avenue

4 floors · 9 apartments · 7,482 sq ft · built 1920 · class C4 · owner of record: 2 Berkley Realty Llc

10open violations
$36,741ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 65 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-15 (Accepted). Agency page

Dec 31, 2026
in 65 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual

Open violations

ECB / OATH (8) · $36,741 owed
IssuedViolationHearingBalance
Mar 17, 2022Construction CLASS - 1
FAILURE TO PROVIDE SIDEWAK SHED WHERE REQUIRED TO PROTECT PUBLIC.NOTED:AT TIME OF INSPECTION OBSERVED AT EXP #1 NORTH ELEVATION SWS DOES NOT EXTEND FULL LENGTH OF EXP #1 AS WAS CITED IN SUMMONS #35640204P TO TH
#35647399X
May 22, 2023
IN VIOLATION
$25,000
Mar 17, 2022Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING IN CODE COMPLIANT MANNER.NOTED:AT TIME OF INSPECTION OBSERVED HAZARDOUS CONDITION STILL EXISTS FROM PREVIOUS INSPECTION CITED IN PREVIOUS SUMMONS #3564591X DETERIORATING MA
#35647398Y
Sep 7, 2022
IN VIOLATION
$4,373
Feb 8, 2022Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BLDG FACADE & APPURTENANCES IN A CODE COMPLIANT MANNER.AS NOTED CONDITIONS FROM SUMMONS #35640591Y STILL EXIST WHILE INCLUDE DEFECTIVE STORE SILLS,CRACKS ON STAGE INADEQUATE REPAIRS
#35640203N
Jul 27, 2022
IN VIOLATION
$1,012
Feb 8, 2022Construction CLASS - 1
FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED.AT TIME OF INSPECTION SIDEWALK SHED DOES NOT EXTEND THE ENTIRE FACADE ON EXP.#1 BERKLEY PLACE CONDITION EXIST FROM SUMMONS #35640592X ISSUED ON 12/21/21.REMEDY:PR
#35640204P
May 1, 2023
IN VIOLATION
$1,189
Dec 21, 2021Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT NORTH ELEVATION EXP #1 OBSERVED DEFECTIVE STONE AND INADEQUATE REPAIR ABOVE WINDOW AT 3RD FLOOR.REMEDY:REPAIR AND/OR REPLACE.
#35640591Y
Jun 1, 2022
IN VIOLATION
$157
Dec 21, 2021Construction CLASS - 1
FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY AT NORTH ELEVATION EXP #1 OBSERVED PLANTS POTS OBSTRUCTING EXIT PASSAGEWAY AND 2ND FLOOR.REMEDY:REMOVE EGRESS OBSTRUCTION.
#35640593H
Jun 1, 2022
IN VIOLATION
$10
Sep 29, 2020Construction CLASS - 1
WORK W/O PERMIT. RENOVATION OF COMMERCIAL SPACE EXCEEDING WORK FILED FOR,INCLUDING BUT NOT LIMITED TO THE REMOVAL OF FIRE STOPPING. REMEDY:OBTAIN PERMIT. STOP ALL WORK EXCEPT TO MAKE SITE SAFE CONTACT DOB AT (7
#35537439Y
Aug 25, 2022
IN VIOLATION
$2,500
Sep 29, 2020Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. RENOVATION OF COMMERCIAL SPACE EXCEEDING SAFETY CONDITIONS. BC 712, A.C. 27-345. REMEDY: MAINTAIN FIRE STOPPING
#35537440L
Aug 25, 2022
IN VIOLATION
$2,500
DOB (4)
IssuedViolationStatus
May 11, 2022FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00324
DOB VIOLATION - ACTIVE
Jun 1, 1994LOCAL LAW 62/91 - BOILERS

#18195
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#31468
DOB VIOLATION - ACTIVE
Jun 1, 1993LOCAL LAW 62/91 - BOILERS

#18194
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
May 11, 2022AEUHAZ FTC-AEU-HAZ
Active
Jun 1, 1994Boiler LL6291
Active
Jun 1, 1993Boiler LL6291
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 12:03 AM ET. BBL 3009530010.

Look up another building