Queens · Block 3473 · Lot 12 · 11385

1866 Cornelia Street

3 floors · 6 apartments · 5,600 sq ft · built 1911 · class C2 · owner of record: Jan Dziekonski

17open violations
$0ECB/OATH penalties owed
5HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 69 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 85 days
Annual
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1165 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-02 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
Mar 26, 2002LOCAL LAW 62/91 - BOILERS

#28565
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Mar 26, 2002Boiler LL6291
Active
HPD (15) · C 5 · B 0 · A 10
IssuedClassViolationCorrect by
Oct 3, 2005CApt 3L · SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTNov 12, 2005
Oct 3, 2005CApt 3L · SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) CEILING IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTNov 12, 2005
Oct 3, 2005CApt 3L · SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTNov 12, 2005
Oct 3, 2005CApt 3L · SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTNov 12, 2005
Sep 28, 2005AApt 3L · SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTJan 6, 2006
Sep 28, 2005AApt 3L · SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTJan 6, 2006
Sep 28, 2005AApt 3L · SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTJan 6, 2006
Sep 28, 2005AApt 3L · SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTJan 6, 2006
Sep 28, 2005ASECTION 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR 1ST STORY AT PUBLIC HALLJan 6, 2006
Dec 22, 2004AApt 3L · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st DOOR FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTApr 1, 2005
Dec 22, 2004AApt 3L · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st DOOR FROM SOUTH AT WEST WALL, 1st DOOR FROM WEST AT NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORYApr 1, 2005
Dec 22, 2004CApt 3L · SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st DOOR FRAME FROM SOUTH AT WESTJan 31, 2005
Dec 22, 2004AApt 3L · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. 1st DOOR FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTApr 1, 2005
Dec 22, 2004AApt 3L · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. 2nd WINDOW FRAME FROM WEST AT NORTH WALL, 2nd WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTApr 1, 2005
Dec 22, 2004AApt 3L · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st DOOR FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTApr 1, 2005

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 1:05 PM ET. BBL 4034730012.

Look up another building