5 floors · 82,200 sq ft · built 2010 · class W1 · owner of record: Nyc School Construction Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2226). Agency page | Dec 31, 2026 in 50 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 82,200 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 415 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 19, 2026 | Construction CLASS - 2 REISSUE #35693126H DATE OF ISSUE: 03/05/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT VARIOUS LOCATIONS THROUGH STAIRCASE 'B' MULTIPLE STEP CRACKS #35728691H | Mar 10, 2026 POP/IN-VIO | $0 |
| Feb 19, 2026 | Construction CLASS - 2 REISSUE #35693127 DATE OF ISSUE: 03/05/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION NOTED AND OBSERVED AT CLASS ROOM 505, 405 AND 310 WINDOWS WATER DAMAGE/SPALLING WALL #35728690X | Mar 10, 2026 POP/IN-VIO | $0 |
| Mar 5, 2025 | Construction CLASS - 2 REISSUE ECB#35676171M FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT STAIRCASE B FROM 5TH FL TO CELLAR BLOCK/CMU WALL BRICKSTHROUGHOUT VARIOUS HORIZONTALLY/STEPPED.REM:REPAIR AND OR REPLACE. #35693126H | May 6, 2025 POP/IN-VIO | $0 |
| Feb 23, 2024 | Construction CLASS - 2 REISSUE#35676189K-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED AT VARIOUS LOCATIONS THROUGHOUT STAIRCASE B MULTIPLE STEP-CRACKS CAN BE SPOTTED FROM 5 FLR DOWN TO CELLAR LEVEL.REM:REPAIR/ #35676171M | Apr 22, 2024 POP/IN-VIO | $0 |
| Jun 9, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. STAIR B HAS A CRACK IN STAIRWELL IN CMU WALL RUNNING THROUGH WHOLE BUILDING 1-5 FLOORS. REMEDY: REPAIR AND/OR REPLACE #35676189K | Nov 2, 2023 POP/IN-VIO | $0 |
| Oct 9, 2020 | Elevators CLASS - 1 DLM MISSING , FILE APPLICATION INSTALL DLM, AND PERFORM AND FILE TEST WITH NYCDOB. CAT EMERGENCY LIGHT DEFECTIVE REPAIR. CAR TOP LIGHT DEFECTIVE REPAIR. HOIST WAY DOOR GIBBS MISSING PROVIDE. #39030169X | Oct 21, 2020 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 9:46 AM ET. BBL 1022260041.