4 floors · 115,146 sq ft · built 1920 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-10 (Accepted). Agency page | Dec 31, 2026 in 51 days | 1 of 4 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 115,146 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 172 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 172 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 416 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6667). Agency page | Dec 31, 2027 in 416 days | Next due 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 13, 2026 | Unknown CLASS - 3 I OBSERVED HVAC UNIT INSTALLED ON THE FRONT OF THE SCHOOL WITHOUT AN ELECTRICAL PERMIT ON FILE., OBTAIN PERMIT; OBTAIN ELECTRICAL PERMIT #39203898Z | Oct 28, 2026 POP/IN-VIO | $0 |
| Jun 6, 2022 | Boilers CLASS - 2 FOUND AERCO DIRECT VENT GAS FIRED BOILER MODEL BMK2000 S/N: G-19-2468 INSTALLED AND UNREGISTERED., MAINTAIN BOILER; REGISTER BOILER AND CORRECT ANY VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION. #39063684L | Jun 8, 2022 POP/IN-VIO | $0 |
| Jun 6, 2022 | Boilers CLASS - 2 FOUND AERCO DIRECT VENT GAS FIRED BOILER MODEL BMK2000 S/N: G-19-2467 INSTALLED AND UNREGISTERED., MAINTAIN BOILER; REGISTER BOILER AND CORRECT ANY VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION #39063685N | Jun 8, 2022 POP/IN-VIO | $0 |
| Oct 28, 2016 | Boilers CLASS - 1 B154,36,50,51/RHEEM MODEL TW620M,GAS FIRED HOT WTR HEATING BLR.375,000BTU/HL "H" STAMPED BLR NOT REGISTERED;36)FILE TO REGISTER;50)STRONG NATURAL GAS ODOR DETECTED NEA FUEL SUPPLY PIPING AT FRONT OF BOILER.51) #32086034R | Jan 23, 2017 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #19082 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #19083 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Sep 13, 2026 | ECB | Unknown: I OBSERVED HVAC UNIT INSTALLED ON THE FRONT OF THE SCHOOL WITHOUT AN ELECTRICAL PERMIT ON FILE., OBTAIN PERMIT; OBTAIN ELECTRICAL PERMIT | Open |