16 floors · 79,961 sq ft · built 1911 · class O6 · owner of record: 185 Madison Avenue,
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 60 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $720,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 112 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 79,961 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 181 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 181 days | Annual filing |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 864). Agency page | Dec 31, 2034 in 2982 days | Next due 2034 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 29, 2026 | Construction CLASS - 2 UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&4 WITH NO SIDEWALK SHED PARAPET INFORMATION PANEL INSTALLED AT EXPOS 4 CONTRARY TO CODE 3301.9.2.2 POSTING OF SIDEWALK SHED PARAPET INFORMATION PA #39553616L | May 24, 2027 DEFAULT | $1,280 |
| Apr 29, 2026 | Construction CLASS - 2 UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1 CONTRARY TO CODE. INADEQUATE COVERAGE OF CORRUGATED METAL UNDER THE WOOD DECK NEAR THE BUILDING AND ABOVE THE BUILDING ENTRIES. LARGE GAPS OF UNPR #39553608L | Jun 8, 2027 DEFAULT | $5,000 |
| Apr 29, 2026 | Construction CLASS - 2 I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&4 CONTRARY TO CODE. MUDSILLS NOT SECURED TO VERTICAL MEMBERS AT EXPOS 4 CONTRARY TO 3307.6.4.10 . 8FT HEIGHT NOT MAINTAINED IN PATHWAY AT EXPOS 4 CONTRARY TO 3307 #39553614H | May 20, 2027 DEFAULT | $2,430 |
| Apr 29, 2026 | Unknown CLASS - 2 UPON INSPECTION I OBSERVED A SIDEWALK SHED AT EXPOS 1&4 NOT MAINTAINED ACCORDING TO CODES 3307.6.5.1 & 3307.6.5.3 . I OBSERVED MULTIPLE UNPROTECTED BOLTS IN PATHWAY AT EXPOS 1&4. ADVERTISEMENTS HUNG BELOW THE D #39553619R | Oct 1, 2026 IN VIOLATION | $625 |
| Jun 17, 2024 | Construction CLASS - 2 AC27-929.1 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE FINAL SPRINKLER REPORT PREPARED BY REGISTEREED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HEIGHT IN E #37028812K | Nov 7, 2024 IN VIOLATION | $0 |
| Feb 28, 2023 | Construction CLASS - 2 27-929.1 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100 FT OR MORE IN HEIGHT IN EXISTENCE ON #37025256P | Mar 21, 2024 IN VIOLATION | $0 |
| Dec 9, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #902483.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE #37024786H | Mar 2, 2023 IN VIOLATION | $0 |
| Nov 1, 2021 | Construction CLASS - 2 SEC. AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEMOF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BLDG 100 FEET OR MORE IN #37022594Y | Jul 21, 2022 IN VIOLATION | $0 |
| Jul 13, 2020 | Construction CLASS - 2 SEC. AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEMOF AUTOMATIC SPRIKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BLDG 100 FEET OR #37019802M | Apr 29, 2021 ADMIT/IN-VIO | $0 |
| Nov 15, 2019 | Construction CLASS - 2 SEC. A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BLDG 100 FEET #37016369R | Jun 18, 2020 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT EXPOSURE (NORTH ELEVATION) IT WAS BULGING PARAPET, CRACK ON BRICK FACADE REMEDY REPAIR AND/OR REPLACE #SR10601 | DOB VIOLATION - ACTIVE |
| Sep 18, 2024 | CONSTRUCTION FTM BLDG IN A CODE COMPLIANT MANNER. AT EXPOSURE 2 (NORTH ELEVATION) IT WAS OBSERVED BULDGING PARAPET, CRACK ON BRICK FACADE. REMEDY: REPAIR AND OR REPLACE #SR10601MA | DOB VIOLATION - ACTIVE |
| Apr 24, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: OBSERVED AT EXP 1 CRACK BRICK AT 6TH FLOOR & SPALLING AT PARAPET NORTH WEST. EXPOSURE 4 DAMAGED JOINT AND SPALLING AT LOWER FLOORS. ROOF AREA OPENING AT MAIN ROOF PARAPET EXPOSURE 2. REMEDY: REPAID AND/OR REPLACE #SR0601NS | DOB VIOLATION - ACTIVE |
| Dec 29, 2023 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER INADEQUATE RAILING AT ROOF LEVEL NOT SECURE AT EXPOSURE#1 OBSERVED A VERTICAL CRA CRACK ABOUT 6 STORY UP REMEDY:REPAIR AND OR REPLACE #SR10601DO | DOB VIOLATION - ACTIVE |
| Dec 19, 2023 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER INADEQUATE RAILING AT ROOF LEVEL REMEDY:REPAIR AND OR REPLACE #SR10601DO | DOB VIOLATION - ACTIVE |
| Jul 20, 2023 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVEDSPALLING AND ERODED JOINTS AT EXPOSURE#3 WALL OPENING AT HIGH PARAPET,SPALLING AND ERODED JOINTS AT EXPOSURE #2 REMEDY:MAINTAIN BUILDING REPAIR AND OR REPLACE #SR0603NS | DOB VIOLATION - ACTIVE |
| May 2, 2023 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:OBSERVED SPALLING AN ERODED JOINTS AT EXPOSURE #3AND AT HIGH AND LOW PARAPET WALLS SOUTH WEST WALL DAMAGED. REMEDY:MAINTAIN BUILDING REPAIR AND OR REPLACE #SR0601NS | DOB VIOLATION - ACTIVE |
| Nov 22, 2022 | CONSTRUCTION FTM BLDG IN CODE COMPLIANT MANNER. OBSERVED RUST HOLES IN CORNICE AT EXPOSURES 1 AND 4(ELEVATIONS WEST AND SOUTH)ALSO CRACKED TERRA COTTA ON EXPOSURES 4 SOUTH ELEVATIONS. REMEDY: MAINTAIN BLDG AND REPAIR DEFECTS ON ALL EXPOSURES #SR10602XN | DOB VIOLATION - ACTIVE |
| Jun 1, 2022 | CONSTRUCTION FTM EXTERIOR BLDG WALLS AND APPURTENANCES. OBSERVED ON EXP1 AND 4 CORRODED METAL CORNICE WITH RUSTED OPEN HOLES AT SEVERAL LOCATIONS EXP4 SOUTH ELEVATION-CRACKED TILE ON 10FL. REMEDY: MAINTAIN EXTERIOR BLDG WALLSM PROVIDE ADEQUATE SAFETY MEASURES, REPAIR DAMAGE FACADE AND APPURTENANCES #LL0603RF | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00243 | DOB VIOLATION - ACTIVE |
| Jul 2, 2021 | CONSTRUCTION FTM BUILDING EXTERIOR WALLS/FACADE AND APPURTENANCES. EXP 2 NORTH ELEVATION OBSERVED DETERIORATING MORTAR JOINTS, OPEN JOINTS, SPALLED MASONRY FROM 13TH THROUGHT 16 FLOORS DIRECTLY ABOVE ADJACENT PROPERTY. REMEDY: MAINTAIN EXTERIOR BUILDING WALLS/FACADE AND APPURTENANCES #LLFA02KA | DOB VIOLATION - ACTIVE |
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2000565 | DOB VIOLATION - ACTIVE |
| Sep 3, 2019 | SPRINKLER FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019 #NRF00231 | DOB VIOLATION - ACTIVE |
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #01558 | DOB VIOLATION - ACTIVE |
| Jan 5, 2015 | ELEVATOR #9027/526744 | DOB VIOLATION - ACTIVE |
| May 30, 2014 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST #01811 | DOB VIOLATION - ACTIVE |
| May 30, 2014 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST #01813 | DOB VIOLATION - ACTIVE |
| Jan 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 #00076 | DOB VIOLATION - ACTIVE |
| Dec 26, 2008 | ELEVATOR #9011/289650 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Sep 3, 2019 | Sprinklers FTF-SP-FINAL | Active |
| May 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
| Jan 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)