4 floors · 89,984 sq ft · built 2025 · class O5 · owner of record: Mb185 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2021-12-23 (Accepted). Agency page | Dec 31, 2026 in 68 days | 3 of 3 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 89,984 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 7202). Agency page | Dec 31, 2032 in 2260 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 19, 2026 | Construction CLASS - 2 4STORY NB. 3301.6.2 NOTED SEVERAL MAKESHIFT TEMP. WOODEN PLATFORMS INSTALLED @ SHAFT OPENINGS ON ALL FLOORS: UPON REQUEST FOR PE DESIGN DRAWINGS NONE WERE PROVIDED. AT ROOF LEVEL NOTED MAKESHIFT PULLY SYSTEM IN #39550591K | Dec 1, 2026 | $1,250 |
| Feb 19, 2026 | Construction CLASS - 1 ACTIVE 4STORY NB CURRENTLY IN SUPERSTRUCTURE PHASE AT 4TH FLOOR. 28-110.2 SSP ON SITE IS NOT PHASED FOR SUPERSTRUCTURE PHASE & DOES NOT REFLECT CURRENT SITE CONDITIONS. UPON REQUEST SSP PROVIDED TO ME DID NOT H #39550590Z | Dec 1, 2026 | $2,500 |
| Feb 19, 2026 | Construction CLASS - 1 OBSERVED ACTIVE 4 STORY NB. UPON RESEARCH OF DOBRECORDS ACTIVE PSWO ON SOIL WORK EXISTS @EXPO3, ISSUED ON 11/12/25: COMPLAINT #4A16708. WORK CONTINUED WHILE ON NOTICE OF SWO. EXPO3 HAS BEEN FULLY ERECTED TO ROO #39550597L | Dec 1, 2026 | $10,000 |
| Feb 19, 2026 | Construction CLASS - 1 3303.4.1.1 ACTIVE 4STORY NB. FAILURE TO MAINTAIN SIDEWALK @EXPO1. NOTED PUBLIC SIDEWALK @EXPO1 OF SITE DISTURBED & DAMAGED FROM CONSTRUCTION OPS. CRACKS, UNEVENNESS AT GRADE AND INADEQUATE REWORK OF SIDEWALK CA #39550596J | Dec 1, 2026 | $4,800 |
| Feb 19, 2026 | Unknown CLASS - 1 ACTIVE 4-STORY NB. NOTED NO DEWATERING IN PLACE ON SEVERAL FLOORS AS PER 3303.14. PUDDLES OF WATER THROUGHOUT AT RISK OF FREEZING INTO ICE. AT SUBCELLAR LEVEL NOTED WATER THROUGHOUT AND IN SOME AREAS UPWARDS OF #39550593Y | Dec 1, 2026 | $5,000 |
| Feb 19, 2026 | Construction CLASS - 1 ACTIVE 4-STORY NB. OBSERVED INADEQUATE HOUSEKEEPING THROUGHOUT SITE ON ALL FLOORS. EXCESSIVE AMOUNTS OF COMBUSTIBLE CONSTRUCTION DEBRIS OBSTRUCT EGRESS. ICY/TRIP/FALL/FIRE HAZARDS. GREAT HEAPS OF WOOD PLANKS & #39550594X | Dec 1, 2026 | $2,500 |
| Feb 19, 2026 | Construction CLASS - 1 ACTIVE 4-STORY NB. AT EXPOSURE 3 NOTED CONSTRUCTION FENCE NOT INSTALLED AS PER DRAWINGS. ADJOINING SITE AT 75-71 185STR NOT SEPARATED FROM SUBJECT SITE, ACCESS TO HEAVY MACHINERY &HAZARDS. APPROVED FENCE PLANS #39550595H | Dec 1, 2026 | $2,500 |
| Feb 19, 2026 | Unknown CLASS - 2 3301.13.7 ACTIVE 4STORY NB W/ MULTIPLE VIOLATING CONDITIONS & DEFICIENCIES. NO ADJACENT PROPERTY PROTECTION, INADEQUATE SSP, INADEQU. GUARDRAILS, DAMAGE TO SIDEWALK, INADEQU. HOUSEKEEPING. CS#028097 FAILED TO P #39550598N | Dec 1, 2026 | $2,500 |
| Feb 19, 2026 | Construction CLASS - 1 OCCUPIED RESIDENCE @EXPO4 IMPACTED/EXPOSED TO ACTIVE CONSTRUCTION. NO REQUI. PROTECTIONS: NO OHP, ROOF, OR WINDOW PROTECTION,NO SAFEGUARDS AGAINST FALLING/DISLODGED MATERIALS.NO/INADEQUATE FENCE SEPARATES SITE #39550589L | Dec 1, 2026 | $10,000 |
| Feb 19, 2026 | Construction CLASS - 1 ACTIVE 4STORY NB. OBS INADEQUATE &MISSING GUARDRAILS THRUOUT SITE ON EVERY FLOOR. @ MANY LOCATIONS, GUARDRAILS ARE DISLODGED/BROKEN. 3RD FLOOR SETBACK NO GUARDRAILS INSTALLED. DANGER OF FALLING MULTIPLE STORIES #39550592M | Dec 1, 2026 | $5,000 |
| Nov 12, 2025 | Construction CLASS - 2 DURING INSPECTION OF A SITE UNDER A STOP WORK ORDER, I OBSERVED @ EXPOSURE #3 AN EXCAVATOR REMOVING SOIL PICKING OVER THE SIDEWALK/FENCE AND DROPPING INTO A DUMPSTER. PICKING OVER A FENCE IS NOT ALLOWED, DOT PE #39546870L | Jul 20, 2026 IN VIOLATION | $5,000 |
| Oct 28, 2025 | Construction CLASS - 2 JOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION. NOTE: AT TIME OF INSPECTION, OBSERVED/NOTED - AT JOBSITE, (NORTHEAST CORNER, 186 STREET) APPROXIMATELY 15 LINEAR FEET OF CONSTRUCTION FENCE C #39165172P | Jan 6, 2026 IN VIOLATION | $1,000 |
| Oct 28, 2025 | Construction CLASS - 1 FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTE: AT TIME OF INSPECTION, OBSERVED/NOTED - AT JOBSITE: SEVERAL INSTANCES OF EXPOSED/UNCAPPED REBAR BELOW & WITHIN PROXIMITY #39165170L | Jul 14, 2026 IN VIOLATION | $10,000 |
| Aug 14, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION, DRAWINGS INDICATED FIVE RAKERS; HOWEVER, ONLY FOUR WERE INSTALLED. THE RAKER AT THE CORNER IS SITTING DIRECTLY ON CONCRETE WITH NO CORRESPONDING DESIGN DRAWING. THIS CONDITION POSES A HAZ #39543656R | Oct 26, 2026 DEFAULT | $6,250 |
| Apr 21, 2025 | Construction CLASS - 1 EXPIRED SUPER LICENSE.@ACTIVE 5STORY NB SITE IN EXCAVATION/FOUNDATION PHASE WITH SUPERINTENDENT#028097 POON WOOL HUI ON PERMITS,OBSERVE PER SITE DOCUMENTS&DOB RECORDS(BIS/DOB NOW),I VERIFIED THE SUPER LICENSE H #39539470R | Aug 25, 2026 IN VIOLATION | $5,000 |
| Apr 21, 2025 | Unknown CLASS - 1 FAIL TO COMPLY WITH FDNY CODES BC3301.1.2@ACTIVE SITE OBSERVE NO PORTABLE FIRE EXTINGUISHERS BY COMBUSTIBLE MATERIALS FC3315.1+UNSAFE/UNSECURED STORAGE OF COMPRESSED ACETYLENE+OXYGEN GAS CONTAINERS FC3306.3/FC5 #39539348N | Aug 25, 2026 IN VIOLATION | $5,000 |
| Apr 21, 2025 | Unknown CLASS - 1 BC3301.13.5 ALTERNATE CONSTRUCTION SUPERINTENDENT.@ACTIVE SITE OBSERVE UNSAFE CONDITIONS THROUGHOUT&UPON REVIEW OF SITES JOB FILING&DOCUMENTS, IT WAS REVEALED GC FAILED TO DESIGNATE ALTERNATE CONSTRUCTION SUPER #39539349P | Aug 25, 2026 IN VIOLATION | $5,000 |
| Mar 5, 2025 | Construction CLASS - 2 OBSERVE SITES SUPPORT OF EXCAVATION OPERATIONS APPROX. 17' DEPTH (FINISH@20FT')ALONG EXPOSURE#3 PROPERTY LINE FURTHER AFFECTED NEIGHBOR PROPERTY SAFETY@75-54 186 ST(LESS THAN 5' TO SITE)WITH SOIL SETTLEMENT-ERO #39537674J | Jan 26, 2027 | $5,000 |
| Feb 18, 2025 | Construction CLASS - 2 DURING INSPECTION OF A SITE AT SOE PHASE, I OBSERVED AT EXPOSURE #3 ADJACENT PROPERTIES LOT LINE, SIDE YARDS HAD BEEN UNDERMINED BY PILES, AND SHORING CAUSING SOIL EROSION, VOIDS, AND TAKING AWAY FOUNDATION SUP #39537059H | Apr 29, 2025 IN VIOLATION | $5,000 |
| Dec 26, 2024 | Construction CLASS - 1 @ACTIVE NB SITE IN EXCAVATION PHASE OBSERVE ACTIVE PILE INSTALLATION AND EXCAVATION OPERATIONS OVER 10FT IN DEPTH&UPON REQUEST FROM SITE PERSONNEL FOR PRECONSTRUCTION SURVEY, MONITORING PLANS(VIBRATION&OPTICAL) #39535394X | May 6, 2025 IN VIOLATION | $1,250 |
| Dec 26, 2024 | Unknown CLASS - 1 BC3301.13.5 ALTERNATE CONSTRUCTION SUPERINTENDENT@5 STORY NB SITE IN EXCAVATION PHASE WITH CONSTRUCTION SUPERINTENDENT ON PERMIT OBSERVE ACTIVE EXCAVATION OPERATIONS&SITE PERSONNEL FAILED TO PROVIDE CONSTRUCTIO #39535395H | Oct 2, 2026 IN VIOLATION | $5,000 |
| Issued | Violation | Status |
|---|---|---|
| Sep 27, 2024 | CONSTRUCTION VIO24-50412 #C408RG | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Jun 22, 2026 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)