3 floors · 1 apartments · 10,603 sq ft · built 2005 · class M9 · owner of record: Cong. Darkei Chaim, Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Required only if the owner doesn't live there |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 431 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 18, 2017 | Construction CLASS - 1 SEC: BC 1001.4 & 27-356. FAILURE TO PROVIDE ADEQUATE EXITS FOR EXISTING STRUCTURES. NOTED: (1)ACCORDING TO NYC BC 1968 & PLANS FOR JOB# 301908853 SIGNED OFF 12/17/13 THE WIDTH OF STAIRS SHOULD BE 3'6"- ILLUMINA #35236727J | Mar 26, 2018 IN VIOLATION | $0 |
| Jul 18, 2017 | Construction CLASS - 1 OPERATION OF A PLACE OF ASSEMBLY W/OUT A CURRENT C OF O. NOTED: (1)CO#301908853F ISSUED 12/17/13 INDICATES 150 PERSONS PERMITTED @ 1ST FLR HOUSE OF WORSHIP/PRAYER ROOM. OBSERVED: (1)TABLES & CHAIRS FOR MORE THA #35236725X | Mar 26, 2018 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 17, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.FEU OBSRVD THE 2NDFL KITCHEN AREA HAD FIRE DAMAGE.THE CEILNG&WALL STUDS WERE DAMAGED.THE CELLAR APPEARS TO BE IN USE.PER BIS,THE BLDG LOT CNTAINS 2.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 343224 (040224FEU31201ZT)TO REPAIR THE BUILDING UNDER PERMIT #FEU31207ZT | DOB VIOLATION - ACTIVE |
| Apr 15, 2024 | STRUCTURALLY COMPROMISED BUILDING FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. #00046 | DOB VIOLATION - ACTIVE |
| Apr 2, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.FEU OBSERVED THE 2NDFL KITCHEN AREA HAD FIRE DAMAGE.THE CEILING&WALL STUDS WERE DAMAGED.THE CELLAR APPEARS TO BE IN USE.PER BIS,THE BLDG LOT CONTAINS2BLDGS UNDER BIN#3131855 & #3358474.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 343224 (040224FEU31201ZT) #FEU31201ZT | DOB VIOLATION - ACTIVE |
| Mar 29, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING. FIRE HAS RENDERED 2ND FLOOR NON-COMPLIANT DUE TO FIRE AND 3RD FLOOR APARTMENT ON LEFT SIDE HAS SUSTAINED SMOKE, WATER AND FIREFIGHTER OPERATIONS DAMAGE. SYNAGOGUE ON FIRST FLOOR HAS SUSTAINED WATER DAMAGE. #24-00943 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Apr 15, 2024 | Structurally Compromised Buildings FTF-SC-INITL | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 1:58 PM ET. BBL 3055120056.