Manhattan · Block 350 · Lot 75 · 10002

184 Stanton Street

6 floors · 9 apartments · 12,046 sq ft · built 1920 · class C4 · owner of record: 182 Stanton Property Owner Llc

24open violations
$0ECB/OATH penalties owed
7HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 66 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 82 days
Annual
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 797 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Sep 30, 2018PLUMBING
THE DOB INTENDS TO REVOKE ALL APPROVALS AND PERMITS UNDER PLUMBING ARA #103873328 DUE TO SUSPENSION OF MASTER PLUMBERS LICENSE. STOP ALL PLUMBING WORK UNDER ABOVE MENTIONED PERMIT AND OBTAIN A NEW MASTER PLUMBER TO SUPERSEDE THE PLUMBING PERMIT
#APL08EM
DOB VIOLATION - ACTIVE
Sep 17, 2018PLUMBING
THE DOB INTENDS TO REVOKE ALL APPROVALS AND PERMITS UNDER PLUMBING ARA #103873328 DUE TO SUSPENSION OF MASTER PLUMBERS LICENSE. STOP ALL PLUMBING WORK UNDER ABOVE MENTIONED PERMIT AND OBTAIN A NEW MASTER PLUMBER TO SUPERSEDE THE PLUMBING PERMIT
#APL07DB
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (22) · C 7 · B 12 · A 3
IssuedClassViolationCorrect by
May 28, 2026CApt 2B · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJun 3, 2026
May 28, 2026CApt 2B · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMay 28, 2026
May 28, 2026BApt 2B · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJul 2, 2026
May 28, 2026BApt 2B · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJul 2, 2026
May 28, 2026C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOMJun 3, 2026
Apr 17, 2026BApt 6B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMay 22, 2026
Apr 17, 2026AApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTHJul 21, 2026
Apr 17, 2026BApt 6B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMay 22, 2026
Apr 17, 2026AApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTHJul 21, 2026
Apr 17, 2026BApt 6B · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMay 22, 2026
Apr 17, 2026BApt 6B · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMay 22, 2026
Apr 17, 2026BApt 6B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMay 22, 2026
Apr 17, 2026AApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTHJul 21, 2026
Dec 4, 2025C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED. AT CELLARDec 10, 2025
Oct 10, 2023C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT BUILDING FRONT ENTRANCE DOOROct 16, 2023
Oct 2, 2023BApt 1B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 10 SQ.FT. IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EASTNov 6, 2023
Jan 3, 2022B§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR LEADING TO BASEMENT AT PUBLIC HALL, 1st STORYFeb 7, 2022
Aug 23, 2021C§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIR CONDITIONER PROTRUDING FROM WINDOW OBSTRUCTING EGRESS BALCONY AT 3RD AND 4TH AND 6TH STORY BALCONY AT SOUTH STACKSAug 29, 2021
Jan 19, 2021BApt 6A · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 23, 2021
Jan 7, 2021BApt 6A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 11, 2021
Jan 7, 2021BApt 6A · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE FOYER LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 11, 2021
Jul 23, 2019C§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORYJul 31, 2019

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 4:37 AM ET. BBL 1003500075.

Look up another building