3 floors · 4 apartments · 5,025 sq ft · built 1920 · class S4 · owner of record: 1838 Wa Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 44 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 16, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, NO CERTIFICATE OF CORRECTION FILED FOR SUMMONS #35304703R ISSUED ON 0 #39047557Z | Nov 5, 2021 DEFAULT | $3,125 |
| Sep 16, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, NO CERTIFICATE OF CORRECTION FILED FOR SUMMONS #35304702P ISSUED ON 1 #39047560J | Nov 5, 2021 DEFAULT | $6,250 |
| Jun 16, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION NO CERTIFICATE OF CORRECTION FOR ECB VIOLATION NUMBER 35304703R FILED, #39024005Z | Jan 8, 2021 DEFAULT | $3,125 |
| Oct 31, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION NO CERTIFICATE OF CORRECTION FOR ECB VIOLATION NUMBER: 35304703R FILED #39012127Z | Dec 20, 2019 DEFAULT | $3,125 |
| Oct 31, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION NO CERTIFICATE OF CORRECTION FOR ECB VIOLATION NUMBER: 35304702P FILED #39012125P | Jul 31, 2020 DEFAULT | $6,250 |
| Dec 26, 2018 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DOB'S,AT TIME OF INSPECTION NOTED FAILURE TO FILE FOR ECB VIO#35304703R ISSUED ON 5-9-18. REMEDY: FILE A CERT OF CORRECTION. #35304924K | Apr 26, 2019 DEFAULT | $3,125 |
| Dec 21, 2018 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION. NOTED: FAILURE TO FILE FOR ECB VIOLATION #35304702P ISSUED ON 05/09/2 #35304923Z | Feb 21, 2019 IN VIOLATION | $0 |
| May 9, 2018 | Construction CLASS - 2 OPERATION OF A PLACE OF ASSEMBLY WITHOUT A CURRENT CERTIFICATE OF OPERATION.NOTED:OBSERVED COMMERCIAL SPACE OF 1 STORY BRICK BUILDING AT 1265 THIERIOT AVENUE CONNECTED INTO A BANQUET HALL.THE BANQUET HALL HAS A #35304703R | Sep 28, 2018 DEFAULT | $4,000 |
| May 9, 2018 | Construction CLASS - 2 WORK WITHOUT A PERMIT.NOTED:OBSERVED 3 ROOMS AND (2) 2 PIECE BATHROOM CREATED AT 1ST STORY COMMERCIAL SPACE AT 1265 THIERIOT AVENUE.ROOMS WALL OPERATED WITH SHEETROCK WOOD FRAME,AND WOOD DOORS.ROOM 1 FLOOR SPAC #35304702P | Sep 28, 2018 DEFAULT | $6,250 |
| Jan 25, 2018 | Construction CLASS - 1 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. NOTED: AT TIME OF INSPECRTION VACATRE STICKER WAS OBSERVED TO HAVE BEEN REMOVED. VACATE WAS POSTED ON 12-16-16 BY BADGE#1734 FOR REAR 2ND & 3RD FL UNITS SHALL #35255973Z | Nov 24, 2026 DEFAULT | $5,000 |
| Dec 22, 2017 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35296834J ISSUED ON 11/14/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR C OF C,FAILURE TO OBEY VACATE ORDER AT 2ND & 3RD FLOORS. #35281939Y | Nov 24, 2026 DEFAULT | $2,000 |
| Nov 14, 2017 | Construction CLASS - 1 FAILURE TO OBEY AVACATE ORDER BY THE COMMISSIONER PER 28-207.4. NOTED:VACATE ORDER#195 ISSUED 12-13-16 FOR APTS AT REAR OF BLDG ON 2ND & 3RDFL. AT TIME OF INSPECTION 1 FEMALE & 3 MINORS OCCUPY APT AT REAR OF 3R #35296834J | Nov 24, 2026 DEFAULT | $25,000 |
| Sep 27, 2017 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35252679Y ISSUED ON 04/11/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSIO #35280353M | Nov 24, 2026 DEFAULT | $2,000 |
| Apr 11, 2017 | Construction CLASS - 1 FAILURE TO VACATE ORDER BY THE COMMISSIONER PER 28-207.4. NOTED: 2ND FL 1 ADULT WOMAN,3RD FL 1 ADULT WOMAN, 4 MINORS. NOTE: FAILURE TO COMPLY TO VACATE ORDER # 011500276Z 8/24/16. VACATE # 2195/2016. PARTIAL. R #35252679Y | Jun 2, 2017 WRITTEN OFF | $0 |
| Dec 30, 2016 | Construction CLASS - 1 SEC. 28-201.1;28-201.2.1(4)28-203-1(1)1RCNY102-01(B)(I)FAILURE TO COMPLY W/VACATE ORDER #195 ISSUED 12-13-16,PARTIAL VACATE ORDER-2 APTS AT REAR OF BLDG ON 2ND & 3RD STY. AT TIME OF INSPECTION 1 FEMALE & 2 MINO #35173216M | Feb 17, 2017 WRITTEN OFF | $0 |
| Dec 14, 2016 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY FROM SECOND AND THIRD STORY REAR FIRE ESCAPE.FIRE ESCAPE LEADS TO FIRST STORY EXTENSION ROOFAND DOES NOT PROVIDE ACCESS TO STREEE LEVEL.VACATE SECOND AND THIRD #35173151K | Jun 23, 2017 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06833 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #06236 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #34692 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #14383 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #14552 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #35480 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #08333 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #04327 | DOB VIOLATION - ACTIVE |
| Apr 18, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00224 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #05763 | DOB VIOLATION - ACTIVE |
| Feb 7, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00259 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #04271 | DOB VIOLATION - ACTIVE |
| May 20, 2016 | CONSTRUCTION #CN0901CD | DOB VIOLATION - ACTIVE |
| May 31, 2015 | CONSTRUCTION DUE TO A FIRE AT #CNE01DG | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #08733 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #07609 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 18, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Feb 7, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 9, 2015 | I | Apt 2 · § 27-2091 HMC, § 302 MDL : APARTMENTS HAVE BEEN ISSUED A COMMISSIONER'S ORDER AND OCCUPANTS ARE IN NEED OF RELOCATION SERVICES. APARTMENTS CANNOT BE RE-OCCUPIED UNITL THE COMMISSIONER'S ORDER IS REVOKED AFTER HPD INSPECTION OF APARTMENTS. COMMISSIONER'S ORDER #15/0064 IN THE ENTIRE APARTMENT LOCATED | — |
| Apr 30, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 3, 2026 |
| Dec 29, 2025 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME READILY ACCESSIBLE FOR SIGNATURE, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT FRAME MISSING AT PUBLIC HALL, 1st STORY | Apr 3, 2026 |
| Dec 29, 2025 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Apr 3, 2026 |
| Dec 29, 2025 | A | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS SIGNAGE MISSING | Apr 3, 2026 |
| Dec 29, 2025 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGNAGE MISSING AT PUBLIC HALL, 1st STORY | Jan 4, 2026 |
| Dec 29, 2025 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Apr 3, 2026 |
| Dec 29, 2025 | A | §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX SIGNAGE MISSING AT PUBLIC HALL, 1st STORY | Apr 3, 2026 |
| Dec 29, 2025 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Apr 3, 2026 |
| Jul 1, 2024 | A | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 4, 2024 |
| Jul 1, 2024 | A | Apt 1 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 4, 2024 |
| Jul 1, 2024 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 27, 2024 |
| Jul 1, 2024 | A | Apt 1 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT LOWER REFRIDGERATOR DOOR IN THE KITCHEN LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 4, 2024 |
| Jul 1, 2024 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT STREET ENTRANCE DOOR TO BUILDING , 1st STORY | Jul 7, 2024 |
| Jul 1, 2024 | A | Apt 1 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER SASH COUNTER BALANCE AT WINDOW AT SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 4, 2024 |
| May 23, 2024 | A | Apt 2 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 26, 2024 |
| May 23, 2024 | B | Apt 2 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 27, 2024 |
| May 23, 2024 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT ENTRANCE IN THE ENTRANCE LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 27, 2024 |
| May 23, 2024 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH COUNTER BALANCE AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 27, 2024 |
| May 23, 2024 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH GLASS PANE IN THE 2nd ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 27, 2024 |
| May 23, 2024 | B | Apt 2 · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE PIPE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 27, 2024 |
| May 23, 2024 | B | Apt 2 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 27, 2024 |
| May 16, 2024 | B | Apt 1 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1, 2nd STORY | Jun 20, 2024 |
| May 16, 2024 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 1, 2nd STORY | Jun 20, 2024 |
| May 16, 2024 | C | Apt 1 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 1, 2nd STORY | May 22, 2024 |
| May 16, 2024 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY | Jun 11, 2024 |
| May 13, 2024 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Aug 16, 2024 |
| May 13, 2024 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Aug 16, 2024 |
| May 13, 2024 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM ......... AT PUBLIC HALL, 1st STORY | May 19, 2024 |
| May 13, 2024 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR .... AT PUBLIC HALL, 1st STORY | Aug 16, 2024 |
| May 13, 2024 | A | § 27-2045 ADM CODE - POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER , AT OR NEAR THE MAILBOX .... AT PUBLIC HALL, 1st STORY | Aug 16, 2024 |
| May 13, 2024 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Aug 16, 2024 |
| May 13, 2024 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX ..... AT PUBLIC HALL, 1st STORY | Aug 16, 2024 |
| Mar 5, 2024 | B | Apt 1 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 5 SQ. FT. AT THE CEILING IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 16357500 ISSUED 03-NOV-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-20 | Apr 9, 2024 |
| Jan 29, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Feb 4, 2024 |
| Jan 29, 2024 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE FOYER LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 4, 2024 |
| Jan 29, 2024 | C | Apt 1 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 28, 2024 |
| Nov 6, 2023 | B | Apt 1 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 11, 2023 |
| Nov 6, 2023 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 11, 2023 |
| Nov 6, 2023 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS IN THE FOYER LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 11, 2023 |
| Nov 6, 2023 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 11, 2023 |
| Nov 6, 2023 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 2, 2023 |
| Nov 6, 2023 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 11, 2023 |
| Nov 6, 2023 | B | Apt 1 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 4 SQ. FT. AT THE CEILING APPROX. 3 SQ. FT. AT THE EAST WALL APPROX. 3 SQ. FT . AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 11, 2023 |
| Nov 6, 2023 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 2, 2023 |
| Sep 29, 2023 | B | Apt 1 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 3, 2023 |
| Sep 29, 2023 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 3, 2023 |
| Sep 29, 2023 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 25, 2023 |
| Sep 29, 2023 | A | § 27-2047 ADM CODE PROVIDE AND MAINTAIN APPROVED MAIL RECEPTACLES AND DIRECTORIES FOR THE PERSONS RESIDING IN THE DWELLING AS PROVIDED IN THE U.S. POSTAL REGULATIONS. AT PUBLIC HALL, 1st STORY | Jan 2, 2024 |
| Sep 29, 2023 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR . FRAME MISSING ON WALL AT PUBLIC HALL, 1st STORY | Jan 2, 2024 |
| Sep 29, 2023 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF RODENTS . EVIDENCE OF RATS AT PUBLIC HALL, 1st STORY | Oct 25, 2023 |
| Sep 29, 2023 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 3, 2023 |
| Sep 29, 2023 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 3, 2023 |
| Sep 29, 2023 | B | Apt 1 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 3, 2023 |
| Sep 29, 2023 | B | Apt 1 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 3, 2023 |
| Sep 29, 2023 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 25, 2023 |
| Sep 29, 2023 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 3, 2023 |
| Sep 29, 2023 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 3, 2023 |
| Sep 29, 2023 | B | Apt 1 · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 3, 2023 |
| Sep 29, 2023 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 3, 2023 |
Showing 60 of 224. Full list on the agency site.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 8:10 AM ET. BBL 2037650045.