3 floors · 2 apartments · 3,240 sq ft · built 1910 · class S2 · owner of record: Wnuk Vladimir I
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-18 (Accepted). Agency page | Dec 31, 2026 in 58 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 302 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 789 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 26, 2026 | Construction CLASS - 1 FAILURE TO OBEY VACATE ORDER FROM THE COMMISSIONER. OBSERVED ACTIVE COMMERCIAL SPACE WHILE ENTIRE BUILDING IS UNDER ACTIVE VACATE ORDER POSTED 4/1/26 UNDER CONTROL #06091. BUILDING IS STRUCTURALLY COMPROMISED F #39201996N | Nov 4, 2026 PENDING | $10,000 |
| Aug 26, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONERS ORDERS TO OBTAIN A PERMIT FOR VIO# 39182775Z. NO PERMITS ON FILE TO REMOVE PARTY WALL IN CELLAR AFFECTING ADJACENT PROPERTY, 181 NASSAU AVENUE, COMPLY WIT #39201982M | Nov 4, 2026 PENDING | $2,500 |
| Aug 26, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER FOR VIO# 39182776K. OBSERVED JOIST IN CELLAR OF PROPERTY REMAINED CUT COMPROMISING LOAD BEARING INTEGRITY OF BUILDING., REPAIR AND/REPLACE #39201983Y | Nov 4, 2026 PENDING | $6,250 |
| Mar 31, 2026 | Construction CLASS - 1 ATOI AT A 3-STORY MIX USE BUILDING, I OBSERVED MULTIPLE FLOOR JOISTS CUT BETWEEN ADJACENT PROPERTY FROM BASEMENT TO 1ST FL, WHICH IS A FAILURE TO MAINTAIN STRUCTURAL INTEGRITY FOR LOAD-BEARING STRUCTURES WHICH #39182776K | Feb 22, 2027 PENDING | $2,500 |
| Mar 31, 2026 | Construction CLASS - 1 ATOI AT A 3-STORY MIX USE BUILDING, I OBSERVED PARTY WALL REMOVED TO ATTACHED BUILDINGS FROM THE BASEMENT TO 2ND FL., CEILING IS BEING HELD UP BY MULTIPLE ADJUSTABLE FLOOR JACKS FOR SUPPORT, IMMEDIATE HAZARDOUS #39182775Z | Feb 22, 2027 PENDING | $2,500 |
| Sep 30, 2012 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALL OR APPURTENANCES.AT FRONT SIDE ABOVE2ND STORY WOODSILLS AND LINTELS IN STATE OF DISREPAIR/WATER DAMAGED. REMEDY: MAINTAIN EXTERIOR BUILDING WALL. #34995239L | Nov 19, 2012 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 2, 2026 | CONSTRUCTION ON 3/31/2026,UNPERMITTED DEMO OF PARTY WALL AT 181/183 NASSAU AVENUE,B K.UNDOCUMENTED SHORING AND ALTERED JOISTS.NO FILINGS.HAZARD TO PUBLIC AND PROPERTY.REMEDY:RETAIN PE TO SUBMIT PLANS BY 4/10/2026.PERMIT BY 4 /17/2026,START BY 4/20/2026.EMAIL CSE.WORK PER APPROVED FILINGS #CE30101AD | DOB VIOLATION - ACTIVE |
| Apr 1, 2026 | CONSTRUCTION DOB VIOLATION ISSUED FOR FAILURE TO MAITAIN, VACATE ORDER ISSUED, FOR PARTY WALL REMOVED AND TEMPORARILY SUPPORTED BY SCREW JACKS AT BASEMENT & 1ST FLOOR. #26-00948 | DOB VIOLATION - ACTIVE |
| Mar 31, 2026 | CONSTRUCTION VIOLATION ISSUED FOR ENGINEERS REPORT FAILURE TO MAINTAIN DUE TO PARTY WALL REMOVED AND TEMPORARILY SUPPORTED BY SCREW JACKS. #26-00945 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #16076 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #36237 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #37485 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #17103 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #12891 | DOB VIOLATION - ACTIVE |
| May 4, 1998 | LOCAL LAW 62/91 - BOILERS #20204 | DOB VIOLATION - ACTIVE |
| Jun 1, 1994 | LOCAL LAW 62/91 - BOILERS #09895 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #25827 | DOB VIOLATION - ACTIVE |
| Jun 1, 1993 | LOCAL LAW 62/91 - BOILERS #09894 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 28, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 28, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 28, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| Jun 1, 1994 | Boiler LL6291 | Active |
| Jun 1, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 24, 2008 | B | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED WIRE CEILLING LIFHT FIXTURE CENTER ROOM. 3RD DYOTY APARTMENT. | Jul 29, 2008 |
| Jun 24, 2008 | B | SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE CEILLING LIGHT FIXTURE CENTER ROOM, 3RD STORY APARTMENT. | Jul 29, 2008 |
| Jun 24, 2008 | B | SECTION 27-2005 ADMIN. CODE: PROVIDE LIGHT 3RD STORY PUBLIC HALL. | Jul 29, 2008 |
| Jun 24, 2008 | A | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING REAR SOUTH ROOM 3RD STORY APARTMENT. | Sep 27, 2008 |
| Jun 24, 2008 | A | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILINGS ALL ROOMS THROUGH OUT 3RD STORY APARTMENT. | Sep 27, 2008 |
| Jun 24, 2008 | A | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES KITCHEN, 3RD STORY APARTMENT. | Sep 27, 2008 |
| Jun 24, 2008 | A | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR JAM ENTRANCE 3RD STORY APARTMENT. | Sep 27, 2008 |
| Jun 24, 2008 | A | SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING BALUSTERS 1ST TO 2ND STORY PUBLIC HALL STAIR. | Sep 27, 2008 |
| Jun 24, 2008 | B | SECTION 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE EXTENSION ROOF. | Jul 29, 2008 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 28, 2026 | DOB Safety | AEUHAZ: | Open |
| Oct 28, 2026 | DOB Safety | AEUHAZ: | Open |
| Oct 28, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 26, 2026 | ECB | Construction: FAILURE TO OBEY VACATE ORDER FROM THE COMMISSIONER. OBSERVED ACTIVE COMMERCIAL SPACE WHILE ENTIRE BUILDING IS UNDER ACTIVE VACATE ORDER POSTED 4/1/26 UNDER CONTROL #06091. BUILDING IS STRUCTURALLY COMPROMISED F | Open |
| Aug 26, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONERS ORDERS TO OBTAIN A PERMIT FOR VIO# 39182775Z. NO PERMITS ON FILE TO REMOVE PARTY WALL IN CELLAR AFFECTING ADJACENT PROPERTY, 181 NASSAU AVENUE, COMPLY WIT | Open |
| Aug 26, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER FOR VIO# 39182776K. OBSERVED JOIST IN CELLAR OF PROPERTY REMAINED CUT COMPROMISING LOAD BEARING INTEGRITY OF BUILDING., REPAIR AND/REPLACE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 11:29 AM ET. BBL 3026520026.