8 floors · 128 apartments · 118,085 sq ft · built 2023 · class D7 · owner of record: 1824 Anthony Avenue Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 118,085 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page | Feb 21, 2029 in 847 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2892). Agency page | Dec 31, 2032 in 2256 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 2, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT.AS NOTED:AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 9 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL OBSERVED AT THE 1ST FLOOR EXPOS #35718138N | Feb 5, 2027 | $2,500 |
| Jul 8, 2025 | Site Safety CLASS - 1 AT TIME OF INSPECTION OF A 9-STORY NEW BUILDING DURING MY INSPECTION UPON REVIEWING SCOPE OF WORK ON PRE-SHIFT LOG 1-THERE WERE NOT SAFETY MEASURE DISCUSS IN LOG (HANDLING MATERIALS AND EQUIPMENT) 2-EQUIPMENT W #39542118P | Apr 24, 2026 IN VIOLATION | $2,500 |
| Jul 5, 2025 | Construction CLASS - 2 OBSERVED PEDESTRIAN WALKWAY ( LESS THAN 5 FEET ) OBSTRUCTED AND DISLODGED BY A CHAIN-LINK FENCE BEING USED TO PROTECT A GENERATOR IN A STORAGE ZONE, CHAIN-LINK NOT PROPERLY SECURED, WITHOUT FULL HEIGHT, AND PRO #39541986K | Apr 24, 2026 IN VIOLATION | $2,400 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 5, 2026 | B | Apt 202 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 202, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 9, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 5, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 202, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 12:51 AM ET. BBL 2028920016.