2 floors · 3 apartments · 3,189 sq ft · built 2004 · class C0 · owner of record: Piedrabuena, Jose Roberto
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 62 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 18, 2021 | B | Apt 3 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AROUND THE NORTH WALL WINDOW FRAME IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 23, 2021 |
| Nov 18, 2021 | B | Apt 3 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 23, 2021 |
| Nov 18, 2021 | B | Apt 3 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL WI DOW FRAME IN THE 4th ROOM FROM NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 23, 2021 |
| Nov 18, 2021 | B | Apt 3 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AROUND EAST WALL, WINDOW FRAME IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 23, 2021 |
| Nov 18, 2021 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 1ST & 7TH CONCRETE TREADS UP FROM BOTTOM AT BUILDING ENTRANCE STAIRS .LEADING TO 2ND STORY PORCH AT STOOP | Dec 23, 2021 |
| Nov 18, 2021 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE LANDING AT 2ND STORY ENTRANCE TO BUILDING AT STOOP | Dec 23, 2021 |
| Jan 29, 2014 | C | Apt 2 · § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK INSTALLED AT IRON GATE IN THE ENTRANCE LOCATED AT APT 2, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Feb 6, 2014 |
| Jan 29, 2014 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BASE CABINET DOOR AT SINK IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 5, 2014 |
| Jan 29, 2014 | B | Apt 2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 5, 2014 |
| Jan 29, 2014 | B | Apt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 5, 2014 |
| Jan 29, 2014 | B | Apt 2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 5, 2014 |
| Jan 29, 2014 | B | Apt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 5, 2014 |
| May 14, 2013 | B | Apt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ...THE CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 18, 2013 |
| May 14, 2013 | B | Apt 2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ...AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 18, 2013 |
| May 14, 2013 | B | Apt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ...THE CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 18, 2013 |
| May 14, 2013 | B | Apt 2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ...AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 18, 2013 |
| Jul 25, 2011 | C | Apt 1 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT STOVE IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 31, 2011 |
| Jul 7, 2011 | C | Apt 1 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES , IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY | Jul 13, 2011 |
| Jul 7, 2011 | C | Apt 1 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY | Jul 13, 2011 |
| Oct 29, 2007 | B | Apt 1 · § 27-2005,2007 ADMON. CODE: FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR GATES FROM AT LEAST 1 WINDOW. ... IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, APARTMENT AT EAST | Dec 3, 2007 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 7:26 PM ET. BBL 2034960009.