5 floors · 45 apartments · 54,126 sq ft · built 1931 · class C6 · owner of record: Plaza Off The Park Hdfc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 54,126 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2949). Agency page | Dec 31, 2029 in 1162 days | Next due 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-15 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 15, 2025 | Construction CLASS - 1 FAILURE TO TAKE AND PROVIDE UNOBSTRUCTED PASSAGEWAY.NOTE:AT THE TIME OF INSPECTION OBSERVED ITEMS STORED AT FIRE ESCAPE LANDING AT EXPOSURE 2 SOUTH ELEVATION.REM:REMOVE EGRESS OBSTRUCTIONS. #35718540L | Feb 18, 2027 DEFAULT | $6,250 |
| Issued | Violation | Status |
|---|---|---|
| Jul 16, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING CONDITIONS:HAZARDOUS DEFECTED DETERIORATION @ EXPOSURES AND ELEVATION. CRACKS/STEP CRACKS AT BULKHEAD AND PARAPET STUCCO. ROOF AREA DEFECT AT BULKHEAD AND PARAPET. REMEDY: REPAIR AND/OR REPLACE #SR0605NS | DOB VIOLATION - ACTIVE |
| Oct 15, 2025 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO CRACKS/STEP CRACKS DAMAGED/OPEN JOINTS & BULGING @ EXPOSURE 1 EAST ELEV & EXPOSURE 2 SOUTH ELEV. CONDITIONS ALSO EXIST AT BUILDING ENTRANCE COURTYARD. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES AT EXPOSURE 1 COURTYARD. FULL SAFETY MEASURES @ EXPOSURE 2 & EXTEND FULL SAFE #SR0604NS | DOB VIOLATION - ACTIVE |
| Oct 15, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT EXPOSURE 1, CRACK DETERIORATION, DAMAGED JOINTS & DEFLATED WINDOW LINTELS EXPOSURE 2: BULGING, CRACK STEPS CRACKS & DAMAGED JOINTS. FAILED STUCCO AT EXPOSURE 3 AND EXPOSURE 4. REMEDY: REPAIR AND/OR REPLACE #SR0605NS | DOB VIOLATION - ACTIVE |
| Dec 1, 2022 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2200719 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 1, 2022 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 5, 2024 | B | Apt 3D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 9, 2024 |
| Jul 5, 2024 | A | Apt 3D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 5th ROOM FROM EAST, THE PRIVATE HALLWAY , THE 2nd ROOM FROM EAST AT SOUTH, THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Oct 8, 2024 |
| Jul 5, 2024 | B | Apt 3D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 9, 2024 |
| Apr 15, 2024 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Jul 19, 2024 |
| Apr 15, 2024 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE STUCCO CEMENT AT NORTH SIDE OF BUILDING. , 3rd STORY | May 20, 2024 |
| Apr 15, 2024 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE STUCCO CEMENT AT NORTH SIDE OF BUILDING. , 5th STORY | May 20, 2024 |
| Apr 15, 2024 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE STUCCO CEMENT AT NORTH SIDE OF BUILDING. , 4th STORY | May 20, 2024 |
| Apr 15, 2024 | C | Apt 1C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | May 11, 2024 |
| Apr 15, 2024 | B | Apt 1C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING VESTIBULE TO APT BELL PANEL AT EAST WALL IN THE FOYER LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | May 20, 2024 |
| Apr 15, 2024 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Jul 19, 2024 |
| Apr 15, 2024 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | Jul 19, 2024 |
| Jun 6, 2023 | B | Apt 3D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WINDOW CASING AT NORTH WALL. IN THE 5th ROOM FROM EAST LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''South'' | Jul 11, 2023 |
| Apr 7, 2023 | B | Apt 3D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | May 12, 2023 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 16, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING CONDITIONS:HAZARDOUS DEFECTED DETERIORATION @ EXPOSURES AND ELEVATION. CRACKS/STEP CRACKS AT BULKHEAD AND PARAPET STUCCO. ROOF AREA DEFECT AT BULKHEAD AND PARAPET. REMEDY: REPAIR AND/OR REPLACE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 6:22 AM ET. BBL 2029490075.