Bronx · Block 2949 · Lot 75 · 10457

1815 Prospect Avenue

5 floors · 45 apartments · 54,126 sq ft · built 1931 · class C6 · owner of record: Plaza Off The Park Hdfc

20open violations
$6,250ECB/OATH penalties owed
1HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 66 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 66 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 82 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 54,126 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2949). Agency page

Dec 31, 2029
in 1162 days
Next due 2029
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-15 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $6,250 owed
IssuedViolationHearingBalance
Oct 15, 2025Construction CLASS - 1
FAILURE TO TAKE AND PROVIDE UNOBSTRUCTED PASSAGEWAY.NOTE:AT THE TIME OF INSPECTION OBSERVED ITEMS STORED AT FIRE ESCAPE LANDING AT EXPOSURE 2 SOUTH ELEVATION.REM:REMOVE EGRESS OBSTRUCTIONS.
#35718540L
Feb 18, 2027
DEFAULT
$6,250
DOB (4)
IssuedViolationStatus
Jul 16, 2026CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING CONDITIONS:HAZARDOUS DEFECTED DETERIORATION @ EXPOSURES AND ELEVATION. CRACKS/STEP CRACKS AT BULKHEAD AND PARAPET STUCCO. ROOF AREA DEFECT AT BULKHEAD AND PARAPET. REMEDY: REPAIR AND/OR REPLACE
#SR0605NS
DOB VIOLATION - ACTIVE
Oct 15, 2025CONSTRUCTION
EMERGENCY WORK ORDER DUE TO CRACKS/STEP CRACKS DAMAGED/OPEN JOINTS & BULGING @ EXPOSURE 1 EAST ELEV & EXPOSURE 2 SOUTH ELEV. CONDITIONS ALSO EXIST AT BUILDING ENTRANCE COURTYARD. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES AT EXPOSURE 1 COURTYARD. FULL SAFETY MEASURES @ EXPOSURE 2 & EXTEND FULL SAFE
#SR0604NS
DOB VIOLATION - ACTIVE
Oct 15, 2025CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT EXPOSURE 1, CRACK DETERIORATION, DAMAGED JOINTS & DEFLATED WINDOW LINTELS EXPOSURE 2: BULGING, CRACK STEPS CRACKS & DAMAGED JOINTS. FAILED STUCCO AT EXPOSURE 3 AND EXPOSURE 4. REMEDY: REPAIR AND/OR REPLACE
#SR0605NS
DOB VIOLATION - ACTIVE
Dec 1, 2022FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2200719
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Dec 1, 2022Energy Grade - LL33 FTP-EN-EGRDEA
Active
HPD (13) · C 1 · B 8 · A 4
IssuedClassViolationCorrect by
Jul 5, 2024BApt 3D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTAug 9, 2024
Jul 5, 2024AApt 3D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 5th ROOM FROM EAST, THE PRIVATE HALLWAY , THE 2nd ROOM FROM EAST AT SOUTH, THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTOct 8, 2024
Jul 5, 2024BApt 3D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTAug 9, 2024
Apr 15, 2024A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORYJul 19, 2024
Apr 15, 2024B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE STUCCO CEMENT AT NORTH SIDE OF BUILDING. , 3rd STORYMay 20, 2024
Apr 15, 2024B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE STUCCO CEMENT AT NORTH SIDE OF BUILDING. , 5th STORYMay 20, 2024
Apr 15, 2024B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE STUCCO CEMENT AT NORTH SIDE OF BUILDING. , 4th STORYMay 20, 2024
Apr 15, 2024CApt 1C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTMay 11, 2024
Apr 15, 2024BApt 1C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING VESTIBULE TO APT BELL PANEL AT EAST WALL IN THE FOYER LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTMay 20, 2024
Apr 15, 2024A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYJul 19, 2024
Apr 15, 2024A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORYJul 19, 2024
Jun 6, 2023BApt 3D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WINDOW CASING AT NORTH WALL. IN THE 5th ROOM FROM EAST LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''South''Jul 11, 2023
Apr 7, 2023BApt 3D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTMay 12, 2023

Issued in the last 120 days

DateSourceWhatNow
Jul 16, 2026DOBCONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING CONDITIONS:HAZARDOUS DEFECTED DETERIORATION @ EXPOSURES AND ELEVATION. CRACKS/STEP CRACKS AT BULKHEAD AND PARAPET STUCCO. ROOF AREA DEFECT AT BULKHEAD AND PARAPET. REMEDY: REPAIR AND/OR REPLACEOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 6:22 AM ET. BBL 2029490075.

Look up another building