24 floors · 636 apartments · 318,334 sq ft · built 1964 · class D3 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 64 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 318,334 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $585,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 847 days | Filing window not open yet |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1573). Agency page | Dec 31, 2033 in 2621 days | Next due 2033 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-28 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 29, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AS NOTED AT TIME OF INSPECTION ON A 1 STORY BUILDING USING FOR MATERIALS STORAGE BY NYC HOUSING AUTHORITY. OBSERVED CRACKED/SPALLED CONCRETE AT BEAMS AND C #35730137N | Oct 14, 2026 POP/IN-VIO | $0 |
| Jun 24, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AS NOTED:AT TIMEOF INSPECTION ON A 1 STORY BUILDING USING FOR MATERIALS STORAGE BY NYCHOUSING AUTHORITY.OBSERVED CRACKED/SPALLED CONCRETE AT BEAMS AND COLUM #35726476X | Jul 27, 2026 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | PLUMBING OBSERVED IN APARTMENT 11J AN ACTIVE GAS LEAK ORIGINATING FROM THE FLEXIBLE CONNECTOR SUPPLYING THE GAS-FIRED STOVE, CREATING A HAZARDOUS CONDITION FOR TENANTS AS PER PC 102.3 . #26-00077 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00326 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00327 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00325 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2026 | Parking Structures FTF-PS-INITL Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 29, 2018 | B | Apt 24B · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 24B, 24th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jul 3, 2018 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 29, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AS NOTED AT TIME OF INSPECTION ON A 1 STORY BUILDING USING FOR MATERIALS STORAGE BY NYC HOUSING AUTHORITY. OBSERVED CRACKED/SPALLED CONCRETE AT BEAMS AND C | Open |
| Sep 23, 2026 | DOB Safety | Parking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)