3 floors · 2 apartments · 1,953 sq ft · built 1852 · class S9 · owner of record: 181 West 4th St. Owners, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 48 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 292 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1144 days | Next cycle year 2029 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 2, 2026 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD AT EXP1 CRACKED WINDOW SILL ON 2FL & SAGGING GURARDRAILS AT ROOF. AT EXP2&4 OBSVD MAJOR SPALLING MASONRY NEAR PARAPET. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 12/02/2026 #PI10201SB | DOB VIOLATION - ACTIVE |
| Jan 6, 2026 | LANDMARK #26-0459 | DOB VIOLATION - ACTIVE |
| Mar 11, 2016 | LANDMARK #16-0889 | DOB VIOLATION - ACTIVE |
| Mar 11, 2016 | LANDMARK #16-0890 | DOB VIOLATION - ACTIVE |
| Apr 24, 2000 | CONSTRUCTION #STF02GN | DOB VIOLATION - ACTIVE |
| Jun 2, 1998 | LANDMARK #98-0716 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 16, 2024 | C | Apt 2 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 30, 2024 |
| Jun 14, 2013 | C | SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE BROKEN MORTISE LOCK AT VESTIBULE DOOR , 1st STORY | Jun 22, 2013 |
| Date | Source | What | Now |
|---|---|---|---|
| Nov 2, 2026 | DOB | CONSTRUCTION: CORRECTIVE ACTION PLAN REQ'D-OBSVD AT EXP1 CRACKED WINDOW SILL ON 2FL & SAGGING GURARDRAILS AT ROOF. AT EXP2&4 OBSVD MAJOR SPALLING MASONRY NEAR PARAPET. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 12/02/2026 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 13, 2026, 2:30 PM ET. BBL 1005920037.