Manhattan · Block 37 · Lot 23 · 10005

180 Maiden Lane

41 floors · 1,079,361 sq ft · built 1982 · class O4 · owner of record: Maiden Glass Llc

28open violations
$5,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
182dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 61 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 1,079,361 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 182 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 182 days
Annual filing
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 37). Agency page

Dec 31, 2027
in 426 days
Next due 2027
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page

Feb 21, 2028
in 478 days
No Cycle 10 report on record yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 792 days
Next cycle year 2028

Open violations

ECB / OATH (1) · $5,000 owed
IssuedViolationHearingBalance
Sep 10, 2025Zoning CLASS - 2
AT TIME OF INSPECTION OBSERVED DCP UNAPPROVED INSTALLATIONS AT POPS SITE. MOVING PARTITION WALLS, HANGING CEILING TO FLOOR CURTAINS FOR EXHIBITS, TEMPORARY ENCLOSURES, SUPER STRUT BRACKETS BOLTED TO CEILING TO
#39160275P
Sep 17, 2026
IN VIOLATION
$5,000
DOB (19)
IssuedViolationStatus
Jan 22, 2015HIGH PRESSURE BOILER

#9028/532661
DOB VIOLATION - ACTIVE
Jan 22, 2015HIGH PRESSURE BOILER

#9028/532659
DOB VIOLATION - ACTIVE
Jan 22, 2015HIGH PRESSURE BOILER

#9028/532653
DOB VIOLATION - ACTIVE
Jan 22, 2015HIGH PRESSURE BOILER

#9028/532655
DOB VIOLATION - ACTIVE
Jan 21, 2015HIGH PRESSURE BOILER

#9027/533647
DOB VIOLATION - ACTIVE
Jan 21, 2015HIGH PRESSURE BOILER

#9028/532650
DOB VIOLATION - ACTIVE
Jan 21, 2015HIGH PRESSURE BOILER

#9028/533642
DOB VIOLATION - ACTIVE
Jan 21, 2015HIGH PRESSURE BOILER

#9028/533644
DOB VIOLATION - ACTIVE
Jan 21, 2015HIGH PRESSURE BOILER

#9028/533645
DOB VIOLATION - ACTIVE
Jan 21, 2015HIGH PRESSURE BOILER

#9028/533648
DOB VIOLATION - ACTIVE
Jan 21, 2015HIGH PRESSURE BOILER

#9028/533649
DOB VIOLATION - ACTIVE
Jan 21, 2015HIGH PRESSURE BOILER

#9028/533641
DOB VIOLATION - ACTIVE
Jan 21, 2015HIGH PRESSURE BOILER

#9027/533639
DOB VIOLATION - ACTIVE
Jan 21, 2015HIGH PRESSURE BOILER

#9027/533640
DOB VIOLATION - ACTIVE
Jan 21, 2015HIGH PRESSURE BOILER

#9027/533646
DOB VIOLATION - ACTIVE
Jan 20, 2015HIGH PRESSURE BOILER

#9027/533635
DOB VIOLATION - ACTIVE
Jan 20, 2015HIGH PRESSURE BOILER

#9028/533636
DOB VIOLATION - ACTIVE
Jan 20, 2015HIGH PRESSURE BOILER

#9027/533638
DOB VIOLATION - ACTIVE
Jan 20, 2015HIGH PRESSURE BOILER

#9027/533637
DOB VIOLATION - ACTIVE
DOB NOW Safety (9)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 31, 2026, 2:44 PM ET. BBL 1000370023.

Look up another building