Manhattan · Block 1993 · Lot 112 · 10027

180 Claremont Avenue

6 floors · 36 apartments · 44,622 sq ft · built 1926 · class D7 · owner of record: Claremont Properties

36open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
44dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 44 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-02-11 (Accepted). Agency page

Dec 31, 2026
in 44 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 44,622 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 165 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 165 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Registered through 2027-09-01

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Nov 28, 2016CONSTRUCTION
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. AT THE TIME OF INSPECTION WE OBSERVED THE RETAINNING WALL LOCATED AT THE REAR YARD WAS CRACK AND OUT OF PLUMB. ON 2/11/16 VIOLATION WAS ISSUED FOR FAILURE TO MAINTAIN THE STRUCTURE.REMEDY: IMMEDIATELY RETAIN A LIC. DESIGN PROFESSIONAL PROVIDE ENGINEERING
#RW0905BH
DOB VIOLATION - ACTIVE
Feb 11, 2016CONSTRUCTION
FM STRUCTURE IN A CODE COMPLIANT MANNER. AT REAR YARD PROPERTY LINE RETAINING WALL IS CRACKED AND OUT OF PLUMB. REMEDY: REQUIRE LIC DESIGN PROFESSIONAL TO EVALUATE RETAINING WALL AND SUBMIT REPORT TO FEU BY 6/6/16. CONSTRUCT NEW RETAINING WALL TO BE DESIGNED BY A LIC DESIGN PROFESSIONAL. WORK TO STA
#FEU0912WW
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
Active
HPD (33) · C 2 · B 26 · A 5
IssuedClassViolationCorrect by
Jun 28, 2023BApt 2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2SQ FT AT WEST WALL IN THE KITCHEN LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 15740714 ISSUED 24-FEB-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-20Aug 2, 2023
Mar 1, 2023BApt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 5, 2023
Feb 28, 2023BApt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 4, 2023
Feb 28, 2023BApt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH AND SOUTH WALLS IN THE FOYER LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 4, 2023
Feb 28, 2023BApt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL /BUZZER FROM BUILDING ENTRANCE TO THE APARTMENT LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 4, 2023
Feb 28, 2023CApt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHMar 26, 2023
Feb 28, 2023BApt 2 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 4, 2023
Feb 28, 2023BApt 2 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 4, 2023
Feb 28, 2023BApt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 4, 2023
Feb 28, 2023AApt 2 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE DOOR AT EAST 1 CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHJun 3, 2023
Feb 28, 2023BApt 2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE KITCHEN LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 4, 2023
Feb 28, 2023BApt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL AT EAST 1 CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 4, 2023
Nov 10, 2022BApt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT SOUTH IN THE BATHROOM LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 15, 2022
Nov 10, 2022BApt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 15, 2022
Nov 10, 2022BApt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AA LOWER WINDOW SASH AT SOUTH IN THE 1st ROOM FROM EAST LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 15, 2022
Nov 10, 2022BApt 2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 5th ROOM FROM EAST LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 15, 2022
Nov 10, 2022BApt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT SOUTH IN THE KITCHEN LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 15, 2022
Nov 10, 2022CApt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHNov 16, 2022
Nov 10, 2022BApt 2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROXIMATELY 20 SQ. FT. IN THE KITCHEN LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 15, 2022
Jul 6, 2021BApt 32 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHAug 10, 2021
Jul 6, 2021BApt 32 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHAug 10, 2021
Jul 6, 2021BApt 32 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHAug 10, 2021
Nov 15, 2019BApt 32 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTDec 20, 2019
Nov 15, 2019BApt 45 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 45, 5th STORY, 1st APARTMENT FROM NORTH AT EASTDec 20, 2019
Nov 15, 2019BApt 45 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 45, 5th STORY, 1st APARTMENT FROM NORTH AT EASTDec 20, 2019
Nov 15, 2019BApt 32 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL THE WALLS IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTDec 20, 2019
Nov 15, 2019BApt 32 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTDec 20, 2019
Aug 29, 2018AApt 32 · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTDec 2, 2018
Aug 29, 2018AApt 32 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, SOUTH WALL AND EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTDec 2, 2018
Aug 29, 2018BApt 32 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTOct 3, 2018
Aug 14, 2018AApt 32 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL DOORS AND TRIM WORK IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 17, 2018
Aug 14, 2018AApt 32 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL TRIM WORK AND DOORS IN THE PRIVATE HALLWAY LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 17, 2018
Aug 14, 2018BApt 32 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 18, 2018

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 4:21 PM ET. BBL 1019930112.

Look up another building