Manhattan · Block 1599 · Lot 44 · 10026

18 West 116 Street

class V1 · owner of record: Carthage Nexus Canada, L.P.

3open violations
$84,572ECB/OATH penalties owed
0HPD class C (immediately hazardous)
—no dated deadlines found

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

We couldn't find building attributes for this lot, so no deadlines are listed.

Open violations

ECB / OATH (19) · $84,572 owed
IssuedViolationHearingBalance
Sep 26, 2026Unknown CLASS - 1
NOTE: AT TIME OF INSPECTION, I OBSERVED BARRIER SYSTEM SET UP ON THE ROADWAY UNBALLASTED (NOT FILLED WITH WATER/SAND) AND MISSING COUPLING THROUGHOUT ALLOWING UNINTENDED MOVEMENT OF THE BARRIERS INCREASING THE
#39559742J
Dec 3, 2026
PENDING
$2,500
Sep 26, 2026Unknown CLASS - 2
ATOI OF A 12-STORY NB APPROX. 6470SQ FT. SITE WAS CLOSED AND THERE WAS NO ONGOING CONSTRUCTION ACTIVITY. UPON SHOUTING AROUND THE PERIMETER AND BANGING ON DOOR MULTIPLE TIMES TO ALERT WATCHPERSON AND TO VERIFY
#39559741H
Dec 3, 2026
PENDING
$2,500
May 20, 2026Unknown CLASS - 1
3309.1 PROTECTION REQUIRED. DURING MY INSPECTION, I OBSERVED AN ONGOING 3RD-FLOOR-LEVEL CONCRETE SLAB POUR WITH NO OVERHEAD PROTECTION IN PLACE FOR ADJOINING PROPERTIES AT EXPOSURES 2 AND 4, REAR YARD. THIS CON
#39554357K
Mar 16, 2027
$10,000
May 20, 2026Unknown CLASS - 1
3310.3 SITE SAFETY PLAN. DURING MY INSPECTION, OF AN ACTIVE PROPOSED 10-STORY NB WITH AN ONGOING CONCRETE SLAB POUR ON THE 3RD FLOOR. I OBSERVED THAT THE DOB-APPROVED SSP WAS MISSING THE SUPERSTRUCTURE PHASE. S
#39554352L
Mar 16, 2027
$5,000
May 20, 2026Unknown CLASS - 1
DURING THE CONSTRUCTION OF A PROPOSED 10-STORY NB. I OBSERVED MISSING ADJOINING PROPERTY WINDOW PROTECTION AT THE 3RD-FLOOR LEVEL, EXPOSURE 2, ADJOINING PROPERTY. STOP ALL WORK WITHIN 25 FEET BACK OF THE ADJOIN
#39554363R
Mar 16, 2027
$10,000
Apr 24, 2026Construction CLASS - 1
AT TIME OF INSPECTION OF PROPOSED 10 STORY NEW BUILDING IN FOUNDATION PHASE OBSERVED SITE SAFETY OF RECORD NOT ON SITE WITHOUT ADEQUATE REPLACEMENT AS REQUIRED. STOP ALL WORK/PROVIDE SITE SAFETY.PROVIDE SAFETY
#39553456L
Jan 29, 2027
$10,000
Apr 24, 2026Unknown CLASS - 2
AT TIME OF INSPECTION OF PROPOSED 10 STORY NEW BUILDING IN FOUNDATION PHASE OBSERVED CONSTRUCTION SUPERINTENDENT OF RECORD NOT ON SITE WITHOUT ADEQUATE REPLACEMENT AS REQUIRED AS PER 3301.13 STOP ALL WORK/PROV
#39553454H
Jan 29, 2027
$2,500
Apr 24, 2026Site Safety CLASS - 1
AT TIME OF INSPECTION OF PROPOSED 10 STORY BUILDING OBSERVED IN PROGRESS WITHOUT REQUIRED DOCUMENTATION FROM COMPETENT PERSON WHEN REQUESTED (LETTERS, PRE-CONSTRUCTION SURVEY OF ADJOINING PROPERTY'S,MONITORING
#39553455J
Jan 29, 2027
$2,500
Apr 15, 2026Construction CLASS - 1
OBSERVED POOR HOUSEKEEPING THROUGHOUT SITE WITH DEBRIS, LOOSE MATERIALS, HOSES, AND SCATTERED EQUIPMENT OBSTRUCTING WORK AREAS AND ACCESS PATHS. CONDITION CREATES TRIPPING HAZARDS AND INTERFERES WITH SAFE OPERA
#39553091H
Jan 28, 2027
$2,500
Apr 15, 2026Construction CLASS - 1
OBS SOE/SHORING SYSTEM NOT CONFORMING TO APPROVED PLANS; TIMBER LAGGING IMPROPERLY INSTALLED WITH GAPS/MISALIGNMENT, SOLDIER PILES AND WALERS SPACING INCONSISTENT, AND RAKERS MISSING, MISALIGNED, OR NOT INSTALL
#39553088R
Jan 28, 2027
$2,500
Apr 15, 2026Unknown CLASS - 1
MIS VIO-3305.3.3 OBSERVED EXCAVATION/ FOUNDATION IN PROGRESS W/ STAYFORM INSTALLED AT TOP OF NEW CONCRETE FOUNDATION WITHOUT APPROVED DRAWINGS OR PE SHOP DRAWINGS. STOP ALL CONCRETE, EXCAVATION & FOUNDATION WOR
#39553089Z
Jan 28, 2027
$5,000
Apr 15, 2026Unknown CLASS - 1
MIS VIO-3301.5 OBSERVED EXCAVATOR OPERATING ON UNEVEN, UNSTABLE SOIL NEAR EXCAVATION EDGE WITHOUT PROPER SETBACK OR GROUND STABILIZATION. NO BARRICADES OR SWING RADIUS PROTECTION PROVIDED, EXPOSING WORKERS TO S
#39553090X
Jan 28, 2027
$5,000
Apr 10, 2026Construction CLASS - 1
AT TIME OF INSPECTION OBSERVED ACTIVE SITE WITH ON GOING FORM WORK OPERATION WITH NO DESIGNATED SITE SAFETY MANAGER / COORDINATOR ON SITE. STOP ALL WORK UNDER APPLICATION M08023712-I1-GC, OBTAIN SITE SAFETY MA
#39552864X
Jan 8, 2027
$10,000
Feb 14, 2026Construction CLASS - 2
OBSERVED YODOCKS NOT MAINTAINED PER MANUFACTURER SPECIFICATIONS, CREATING A POTENTIAL HAZARD TO PEDESTRIANS, IN VIOLATION OF BC 3307.6.6. GC: 617832.
#39550386L
Dec 11, 2026
$1,250
Feb 4, 2026Unknown CLASS - 2
AT TIME OF INSPECTION OF PROPOSED 10 STORY NEW BUILDING OBSERVED YODOK'S IN STREET UTILIZING STREET WITHOUT THE PROPER PERMITS CAUSING HAZARDOUS CONDITIONS.COMPLY WITH DOT REGULATIONS
#39549912Y
Apr 16, 2026
DEFAULT
$0
Jan 23, 2026Construction CLASS - 1
FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION. AT TIME OF INSPECTION OBSERVED SITE OPEN WITH APPROXIMATELY WITH WINTER PLUS ONHOING DELIVERIES AT ENTRY GATE EXCAVATION EDGE WITH AN APPROXIMATE 10' DEEP E
#35686002K
Dec 10, 2026
$5,000
Apr 16, 2025Construction CLASS - 2
OBSERVED DISTURBED CONCRETE SIDEWALK, UNPROTECTED, AND INADEQUATE SAFETY MEASURES TO PROTECT PUBLIC FROM HAZARD. 3301.5 & 3301.2INSTITUTE AND MAINTAIN SAFETY MEASURES TO SAFEGUARD PUBLIC AND PROPERTY FROM CONS
#39539167Y
Jun 26, 2025
DEFAULT
$3,279
Apr 16, 2025Construction CLASS - 2
OBSERVED CONSTRUCTION FENCE NOT MAINTAINED AS PER 3307.11.2.1 THROUGH 3301.11.8. OBSERVED MISSING VIEWING PANEL AS PER 3307.7.3.MAINTAIN CONSTRUCTION FENCE.
#39539166M
Jun 26, 2025
DEFAULT
$2,643
Aug 17, 2024Construction CLASS - 2
NO DOT PERMIT PRESENT: A TARP AND BRICKS APPROXIMATELY 8'X30' ADJACENT TO CONSTRUCTION FENCE IS A TRIP HAZARD TO THE PUBLIC AT TIME OF INSPECTION, COMPLY TO CODE SPECIFICATIONS
#39122305J
Aug 11, 2026
IN VIOLATION
$2,400
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 26, 2026ECBUnknown: NOTE: AT TIME OF INSPECTION, I OBSERVED BARRIER SYSTEM SET UP ON THE ROADWAY UNBALLASTED (NOT FILLED WITH WATER/SAND) AND MISSING COUPLING THROUGHOUT ALLOWING UNINTENDED MOVEMENT OF THE BARRIERS INCREASING THEOpen
Sep 26, 2026ECBUnknown: ATOI OF A 12-STORY NB APPROX. 6470SQ FT. SITE WAS CLOSED AND THERE WAS NO ONGOING CONSTRUCTION ACTIVITY. UPON SHOUTING AROUND THE PERIMETER AND BANGING ON DOOR MULTIPLE TIMES TO ALERT WATCHPERSON AND TO VERIFYOpen
Aug 12, 2026ECBConstruction: OBS. SUPP. SCAFFOLD & SWS INSTALLED/USED CONTRARY TO APPR. PLANS. FISH/ANCHOR PLATES AT MAIN ENTRANCE, STAIR-LADDER ACCESS PTS. & PULLEY SYS. NOT SHOWN. MAT'LS REMAINED STORED ON SWS MONTHS AFTER ERECTION; MULTClosed