2 floors · 1 apartments · 10,625 sq ft · built 1920 · class F9 · owner of record: 18 Division Place Corp.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 314 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 801 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 10, 2017 | Boilers CLASS - 2 AS PER CLASS 2 (B265) 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT AS PER DOB RECORDS. SUBMIT A CURRENT B09 REPORT. #32087899K | Jun 5, 2017 ADMIT/IN-VIO | $0 |
| Apr 10, 2017 | Boilers CLASS - 2 B265 AS PER CLASS 2 (B265) 28-303.7 FAILURE TO FILE A COMPLETE BOILERINSPECTION REPORT AS PER DOB RECORDS. SUBMIT A CURRENT B09 REPORT. #32088150N | Jun 5, 2017 ADMIT/IN-VIO | $0 |
| Dec 22, 2010 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT. OF CORRECTION W/ THE DOB.RESPONDENT FAILED TO COMPLY W/ THE COMM'S ORDER TO CORRECT THEVIOLATING CONDITIONS AND FILE A CERT. OF CORRECTION PURSUANT TO 28-20 #34893610J | May 23, 2011 WRITTEN OFF | $0 |
| Oct 19, 2010 | Construction CLASS - 3 FAIL TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. DEFECT: STEP CRACKS INCEMENT BLOCK WALL ABOVE 1ST STORY AT REAR OF ABOVE PREMISE FACING DEBEYOISE AVE. REMEDY: MAKE ALL REPAIRS IN A SAFE & LAWFUL MANNER #34878325P | Jun 13, 2011 WRITTEN OFF | $0 |
| Aug 9, 2010 | Construction CLASS - 1 WORK W/O A PERMIT OBSERVED @ THE TIME OF INSPECTION,ALTERATION OF ROOFSTRUCTURE & A VERTICAL EXTENSION OF SPACE APPROX 20'X16'BY 7'HIGH ON TOP OF EXISTING SINGLE STORY GARAGE OR COMMERCIAL SPACE.WOOD FRAMING O #34861495R | Oct 4, 2010 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #15098 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #15097 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #13826 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #13825 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #14255 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #14256 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #08932 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #08931 | DOB VIOLATION - ACTIVE |
| Aug 3, 2010 | CONSTRUCTION STOP ALL WORK IMMEDIATELY,MAKE SAFE,CALL THE DOB TO RETURN TO WORK,OBT AIN A PERMIT #0101VP | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #228593 | DOB VIOLATION - ACTIVE |
| May 12, 1997 | CONSTRUCTION #01G01 | DOB VIOLATION - ACTIVE |
| May 2, 1997 | CONSTRUCTION #01G01 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #22523 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #29591 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 10:42 AM ET. BBL 3028490010.