2 floors · 52,800 sq ft · built 1960 · class F1 · owner of record: 18-35 Steinway Placeinc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 52,800 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 813). Agency page | Dec 31, 2033 in 2619 days | Next due 2033 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 5, 2011 | Construction CLASS - 1 WORK W/O A PERMIT. PREMISES UNDER ALT II 410119580, EXP 1.26.09. NOTE,AT TIME OF INSPECTION FOUND: 1) ADDITIONAL MEZZANINE FOOTAGE CREATED EXTENDING FROM EXISTING MEZZ (AS PER AI 400740524/AIII 400740123) TO #34885129N | May 24, 2011 DEFAULT | $0 |
| Apr 5, 2011 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED COSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. INSP DWG. 5.29.09, MEZZ DWG 6.4.08 PC ALT II 410119580, EXP 1.26.09. NOTE, AT TIME OF INSPECTION FOUND; 1) MEZZANINE INDICATED #34885128L | Aug 2, 2011 IN VIOLATION | $0 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 12:55 PM ET. BBL 4008130015.