Queens · Block 5938 · Lot 7 · 11360

18-15 215 Street

16 floors · 289 apartments · 324,261 sq ft · built 1969 · class D4 · owner of record: 1815 215th Street Owners Corp

19open violations
$3,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
57dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 57 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 57 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 73 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 324,261 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 178 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 178 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 301 days
Registered through 2027-09-01
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5938). Agency page

Dec 31, 2028
in 788 days
Next due 2028
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1153 days
Next cycle year 2029
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-21 (Accepted). Agency page

On file2026 reports accepted
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $6,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SAFE (2026-03-12)

Open violations

ECB / OATH (5) · $3,750 owed
IssuedViolationHearingBalance
Dec 4, 2025Boilers CLASS - 2
FEDERAL BOILER HAS BOTH PRESSURE CONTROLS ON THE SAME 1/4 PIPE TO BOILER;CORRECT VIOLATION+SUBMIT CERTIFICATE OF CORRECTION
#39169308N
Oct 6, 2026
IN VIOLATION
$1,250
Dec 4, 2025Boilers CLASS - 2
FEDERAL BOILER HAS BOTH PRESSURE CONTROLS ON THE SAME 1/4 PIPE TO BOILER;CORRECT VIOLATION+SUBMIT CERTIFICATE OF CORRECTION
#39169307L
Oct 6, 2026
IN VIOLATION
$1,250
Mar 14, 2018Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BLDG WALLS & APPURTENANCES. AT TIME OF INSPECTION I OBSERVED ON EXP#1 NORTH ELEVATION: DAMAGED MORTAR JOINT AT THE BASE OF BRICKS ON(PARAPET)ROOF DECK. DAMAGED CANOPY FASCIA AT FRON
#35265230R
Jul 24, 2018
IN VIOLATION
$1,250
Apr 26, 2016Construction CLASS - 2
CHANGES INCONSISTENT WITH EXISTING CERTIFICATE OF OCCUPANCY. OBSERVEDAT CELLAR LEVEL A FULLY FUNCTINAL AND INOPERATION GYMNASIUM SPA AND FITNESS CENTER BUILT OUT UNDER ALT3 JOB #401067670 NO SUCH OCCUPANCY IS
#35112131Y
Aug 24, 2016
IN VIOLATION
$0
Apr 26, 2016Construction CLASS - 2
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDMENTS FOR ALT3 JOB#401067670 FOR WHICH APPLICANT IS REQUESTING LETTER OF COMPLETION FOUND CELLAR LEVEL GYM TO HAVE CONTRARY LAYOUT OF PARTI
#35112132X
Aug 24, 2016
IN VIOLATION
$0
DOB (2)
IssuedViolationStatus
Jan 30, 2002ELEVATOR
4P4590
#9444/148888
DOB VIOLATION - ACTIVE
Oct 23, 2000ELEVATOR
4P4588
#9019/429612
DOB VIOLATION - ACTIVE
DOB NOW Safety (13)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Oct 2, 2026Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2021 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2022 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2020 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2019 Cat1 Test Report
Active
Jul 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 4, 2026, 1:01 AM ET. BBL 4059380007.

Look up another building