3 floors · 1 apartments · 7,157 sq ft · built 1929 · class K4 · owner of record: Anchor Lodge No729 Of Free And Accepted Masons Of
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-05-29 (Accepted). Agency page | Dec 31, 2026 in 60 days | 2 of 2 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 304 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1156 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 2, 2016 | Boilers CLASS - 1 38,50B,50D,51,50A,50C,48B. FULTON Y.T. BLR 10HP. NB41423, OIL FIRED, HP STEAM; 1982.; 38 NO FIXED FRESH AIR VENTILATION PROVIDED FOR ENCLOSED BOILER. INSTALL INCET SUCT WITH FIRE DAMPER; 50A FILE PIPE NO PROPER #32076551X | Jun 21, 2016 ADMIT/IN-VIO | $0 |
| May 2, 2016 | Boilers CLASS - 1 38,50B,50A,51,B154. WEIC MCLAIN, MODEL 578, INPUT G41,000 BTU/HR OUTPUT 521,000 BTU/HR. OIL-FIRED, LOW PRESSURE HOT WATER HEATING BOILER MAUP 60P 81 BUILT 1996E; 38 NO FIXED FRESH AIR VENTILATION PROVIDED FOR E #32076552H | Sep 6, 2016 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 27, 2016 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00452 | DOB VIOLATION - ACTIVE |
| Jul 27, 2016 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00453 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Jul 27, 2016 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 27, 2016 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 1:53 PM ET. BBL 4040830027.